norm-based material price for estimating
- 01
Where material wastage is booked, and the double counting and omission tests: off-site transport and storage losses into the material unit price (price factor) versus site haulage and operation losses into the quota consumption (quantity factor), with the site warehouse / designated stockpile point as the boundary, plus a comparison of booking positions for typical work items and settlement audit checkpoints
Material wastage may enter only one of the material unit price (price fa…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.2.1~3.2.6条、第4.1.2条TB/T 10821-2024 · Basic Quota of Railway Engineering 总说明第四条、Ch. 5砌筑说明、附录《材料工地搬运及操作损耗率》TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.2节 Table 2.2.22026-10-25 - 02
Four cost components of the material price (norm-based material price for estimating) and the step-by-step computation: the formula, the charging base of purchasing and custody, the double pass of transport wastage and the placement of inspection and testing costs
Material price (norm-based material price for estimating) = (material pr…
材料价格信息管理办法 第九条、第十条(材料价格四项构成与计算公式)湖北省建筑安装工程费用定额(2024)材料费内容陕西省建设工程费用规则(2025)材料费内容2026-10-18 - 03
Three-step test for the unit price basis of cofferdam and island-building clay (borrowed fill): no extra charge where the quota already includes borrowing; priced per quota consumption where clay is listed as a material and adjusted as executed; purchased fill follows the fill material cost / norm-based material price basis
Cofferdam clay unit prices follow a three-step test (a decision order, n…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.2节 材料费、第3.5节 填料费TB 10811-2024 铁路基本建设工程设计概(预)算费用定额 第2.5节 填料费JTG 3820-2018 公路工程投资估算编制办法(材料预算价格)2026-10-08 - 04
Overview of engineering project procurement and supply chain management: the eight-step procurement procedure, six management main lines, and compliance red lines
The procurement management master line: control demand by plan, control…
GB/T 50358-2017 建设项目工程总承包管理规范GB/T 50430-2017 工程建设施工企业质量管理规范GB/T 50326-2017 建设工程项目管理规范2026-09-25 - 05
Scope of the "delivered price" basis of published material price information: the mainstream basis includes the material price at source, freight and handling charges, transport wastage and purchasing and custody charges, but exceptions exist by region and category; read the notes of the current issue before use, and never count twice charges already included
The mainstream basis of published price information is the "delivered pr…
GB/T 50875-2013 工程造价术语标准(第2.2.14、2.2.16条)TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第3.2节)TB 10811 铁路基本建设工程设计概(预)算费用定额2026-09-25 - 06
Highway works JTG 3830-2018 material off-site transport wastage rate table: the rule that the wastage rate for bagged cement hauled by motor beyond 500 km increases by 0.5 percentage points, and the Table 3.1.2-2 values
Per the note to Table 3.1.2-2 "Material off-site transport wastage rate…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条、Table 3.1.2-1、Table 3.1.2-2JTG/T 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第3.1.2条Table 3.1.2-2JTG/T 3821 · Estimate Indicators of Highway Engineering2026-09-25 - 07
Pricing rules for cross-region material procurement: purchase-origin price + freight compose the delivered price; adjustment per contract and the price-confirmation procedure
Budget compilation does not force a binary "project location vs purchase…
GB/T 50875-2013 工程造价术语标准TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额2026-09-25 - 08
Railway 2024 quotas: budgeting self-built aggregate yards producing machine-made sand with combined plants (TB/T 10821-2024 Chapter 6 YY-70) and the unit-price composition of self-quarried aggregate
Machine-made sand uses Chapter 6 YY-70 of TB/T 10821-2024 (unit 100 m3 o…
TB/T 10821-2024 铁路工程基本定额(Ch. 6 机制砂石)TB 10801-2024 铁路基本建设工程设计概(预)算编制办法(第3.2节)TB 10811-2024 铁路基本建设工程设计概(预)算费用定额(第2.2节、Table 2.2.2)2026-09-25 - 09
Highway 2018 quota norms system: composition of the cost of works (construction and installation) — 8 cost items, separation of net price and VAT, and bases to which percentage rates are applied (JTG 3830-2018 section 3.1)
Per JTG 3830-2018 clause 3.1.1, highway cost of works (construction and…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1节JTG/T 3832-2018 · Budget Quota of Highway Engineering 附录四JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery2026-09-25 - 10
Highway JTG 3830-2018 purchasing and custody charge rates for materials: steel 0.75%, fuel and explosives 3.26%, other materials 2.06%, purchased components 0.42%, commercial mixes exempt — and the basis for the norm-based material price for estimating
Per clause 3.1.2 of JTG 3830-2018 "Administrative compilation rules for…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 3.1.2 条JTG/T 3833 · Quota for Shift Costs of Highway Engineering Machinery2026-09-25 - 11
Calculation rules for railway material transport costs (out-of-price freight and miscellaneous charges) and secondary haulage (TB 10801/10811/10821)
Out-of-price freight and miscellaneous charges = sum(freight + loading/u…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额TB/T 10821-2024 铁路工程基本定额2026-09-25 - 12
Whether published price information / base-period prices include freight and miscellaneous charges: price-caliber determination (ex-factory caliber excludes, delivered-to-site caliber includes) and the A/B/C classification of railway base-period prices
Whether price information includes transport charges depends on the publ…
GB/T 50875-2013TB 10801-2024TB 10813-20242026-09-25 - 13
Whether published price information / base-period prices include the procurement and keeping fee: caliber determination (railway base-period prices fully include, most provincial price information excludes, highway adds separately)
The procurement and keeping fee is added by rate and not merged into the…
GB/T 50875-2013TB 10801-2024TB 10811-20242026-09-25 - 14
Determining material cost within the all-in unit rate: the two-step norm resource consumption × material unit price method, special situations, and the tax-exclusive boundary
Material cost = norm material consumption × norm-based material price fo…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准GB/T 51095-2015 建设工程造价咨询规范2026-09-25 - 15
Overview of the full-chain use rules for construction cost published price information: nature, price calibers, stage-by-stage pricing, and frequent misconceptions
Published price information means reference guide prices issued by cost…
GB/T 50875-2013 工程造价术语标准GB/T 50500-2024 建设工程工程量清单计价标准TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25