Highway works JTG 3830-2018 material off-site transport wastage rate table: the rule that the wastage rate for bagged cement hauled by motor beyond 500 km increases by 0.5 percentage points, and the Table 3.1.2-2 values
Per the note to Table 3.1.2-2 "Material off-site transport wastage rate table" of the "Administrative compilation rules for estimates and budgets of highway construction projects" (JTG 3830-2018): "For cement carried by motor transport, when the haul distance exceeds 500 km, the wastage rate of bagged cement increases by 0.5 percentage points." The base off-site transport wastage rate for cement (bagged and bulk, including one handling) is 1.0%, plus 0.4% for each additional handling; beyond 500 km bagged cement takes 1.5% (1.0%+0.5%) — bagged only, with no cumulative stepping. The wastage enters the norm-based material price for estimating = (material price at source + freight and handling charges) × (1 + off-site transport wastage rate) × (1 + purchasing and custody charges rate) − recoverable packaging value. The same note appears in Table 3.1.2-2 of the "Administrative compilation rules for feasibility-stage cost estimates of highway construction projects" (JTG/T 3820-2018), on an identical basis.
Applicable Codes
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.2条、Table 3.1.2-1、Table 3.1.2-2
- JTG/T 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects 第3.1.2条Table 3.1.2-2
- JTG/T 3821 · Estimate Indicators of Highway Engineering
Topic Positioning
Value rules for the "off-site transport wastage rate of materials" in the compilation of highway works estimates, budgets and feasibility-stage cost estimates: the base wastage rates and the additions for each extra handling in Table 3.1.2-2 of JTG 3830-2018, the adjustment "when bagged cement is hauled by motor beyond 500 km its wastage rate increases by 0.5 percentage points", and where the wastage is allowed for in the norm-based material price formula.
Core Conclusions
Per the note to Table 3.1.2-2 "Material off-site transport wastage rate table" in clause 3.1.2 of the "Administrative compilation rules for estimates and budgets of highway construction projects" (JTG 3830-2018): "For cement carried by motor transport, when the haul distance exceeds 500 km, the wastage rate of bagged cement increases by 0.5 percentage points."
- Base off-site transport wastage rate for cement (bagged and bulk; off-site transport includes one handling): 1.0%, plus 0.4% for each additional handling.
- Haul distance ≤500 km: bagged cement 1.0%; >500 km: 1.5% (1.0%+0.5%).
- The adjustment applies to bagged cement only, not to bulk cement; the clause provides for no "per additional 500 km" increment — do not step it up cumulatively on your own when compiling costs.
- "0.4% for each additional handling" and the >500 km adjustment are independent of each other and may apply at the same time (e.g. haul distance >500 km with one extra handling en route: 1.0%+0.5%+0.4% = 1.9%).
- Where it enters: norm-based material price for estimating = (material price at source + freight and handling charges) × (1 + off-site transport wastage rate) × (1 + purchasing and custody charges rate) − recoverable packaging value. This wastage is allowed for within the norm-based material price; the norm resource consumption already includes on-site haulage and operational losses, so it must not be added again when compiling a budget. No adjustment coefficient may be applied to the average motor-haul distance, and no on-site haulage distance or re-handling distance may be added beyond the site warehouse or the material stacking yard.
- The same Table 3.1.2-2 and note also appear in clause 3.1.2 of the "Administrative compilation rules for feasibility-stage cost estimates of highway construction projects" (JTG/T 3820-2018), on an identical basis.
Selected base wastage rates from Table 3.1.2-2 (off-site transport including one handling / each additional handling, %): rubble stone 0.5/0.2; stone chips, crushed gravel, sandy gravel, cinders, industrial slag, coal 0/0.4; brick, tile, drummed asphalt, lime, clay 3.0/1.0; sod 2.0/3.0; cement (bagged and bulk) 1.0/0.4; sand — ordinary regions 2.5/1.0, wind-blown sand regions 5.0/2.0.
Companion rules (same clause 3.1.2): for materials in containers or packaging and for long, bulky, light materials, freight is computed on gross mass per Table 3.1.2-1 — gross-mass coefficients: explosives 1.35; cement and lump asphalt 1.01; nails, iron fittings and welding rods 1.10; liquid asphalt / liquid fuel / water 1.17 in drums and 1.00 in tankers; timber at unit gross mass (logs 0.750 t, sawn timber 0.650 t); straw bags 0.004 t. For drummed asphalt, petrol and diesel, one used petrol drum per tonne is amortised as packaging cost (not recovered). Where a material has two or more supply points, freight is computed as the weighted average of the different haul distances, volumes and rates.
Applicable Boundaries
- Applies to material pricing in highway works estimates and budgets (JTG 3830-2018) and feasibility-stage cost estimates (JTG/T 3820-2018); other sectors use different bases (e.g. railway TB 10801/10811 fold wastage into purchasing and custody charges, with the formula (price at source + freight and handling included in the material price) × (1 + purchasing and custody charges rate)) — they must not be mixed.
- The 500 km adjustment covers only the case of "motor transport + bagged cement"; it does not apply to bulk cement or to rail and water transport.
- The off-site transport wastage rate is one component of the norm-based material price, and is a different matter from the on-site haulage and operational losses contained in the norm resource consumption; it must not be charged twice on top of the norm resource consumption when compiling documents.
- The specific values of Tables 3.1.2-1/3.1.2-2 are governed by the officially published tables when compiling documents.
Further Reading
- "Administrative compilation rules for estimates and budgets of highway construction projects" (JTG 3830-2018) clause 3.1.2, Table 3.1.2-1 "Gross-mass coefficients and unit gross mass of materials", Table 3.1.2-2 "Material off-site transport wastage rate table" and its notes.
- "Administrative compilation rules for feasibility-stage cost estimates of highway construction projects" (JTG/T 3820-2018) clause 3.1.2, Table 3.1.2-2 (same note); since the "Highway Works Estimating Indicators" (JTG/T 3821) already account for the characteristics of site access roads and include "minor haulage on site", the same rules apply in cost estimates: no adjustment coefficient on the average motor-haul distance, and no additional on-site haulage distance.
- Rules for determining the material price at source are likewise given in clause 3.1.2 of both sets of rules: purchased materials are determined by combining prices published by the transport authority of the administrative region concerned with surveyed market prices; self-quarried sand, stone, clay and the like are calculated at the extraction unit rates in the norms plus auxiliary production on-costs and mineral resource tax (if any).
Keywords
- 场外运输损耗率
- 袋装水泥
- 500km
- norm-based material price for estimating
- JTG 3830-2018
- 材料毛质量系数
- freight and handling charges
- 公路工程概算预算