Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Overview of the full-chain use rules for construction cost published price information: nature, price calibers, stage-by-stage pricing, and frequent misconceptions

Published price information means reference guide prices issued by cost management agencies, running through the whole chain "price-limit compilation - bid verification - adjustment base - settlement fallback". Five iron rules: contract agreement first; caliber unification (tax-inclusive/exclusive, delivered/ex-factory, procurement-keeping fee); period alignment (base price locked 28 days before the bid deadline, measurement price matched to the measurement period); adjust only beyond band (±5% if not agreed); confirmation with records (submit to the employer before purchase, silence deemed acceptance).

Applicable Codes

  • GB/T 50875-2013 工程造价术语标准
  • GB/T 50500-2024 建设工程工程量清单计价标准
  • TB 10801-2024 铁路基本建设工程设计概(预)算编制办法
  • TB 10811-2024 铁路基本建设工程设计概(预)算费用定额
  • TB/T 10813-2024 铁路工程材料基期价格
  • T/ZBD 100.1-2022 建设工程造价数据建设通用标准
  • GB/T 51262-2017 建设工程造价鉴定规范

Topic Positioning

This card overviews the full-chain framework for using construction cost published price information (labor/material/machinery shift prices and cost indices issued by cost agencies) — definition, price calibers, stage-by-stage pricing rules, and landing actions — serving as the master index of "how to use published price information"; regulatory details of each link are expanded by the referenced topical cards.

Core Conclusions

(1) Nature: published price information means reference guide prices, not mandatory transaction prices; factor prices must be obtained through the three channels of market price / published price information / vendor quote, strictly avoiding confusion (GB/T 50875-2013 Clause 2.1.16; T/ZBD 100.1-2022 Clause 7.2.3). (2) Check four calibers before use: tax-inclusive/exclusive (general taxation prices tax-exclusive with VAT listed separately); delivered/ex-factory (railway base prices in classes A/B/C, only C including freight within price); procurement-and-keeping fee (included in railway base prices, mostly excluded in provincial published price information and added separately); four-element match of name + specification + model + unit. (3) Stage-by-stage seats: price limits take the latest issue at compilation; bids price mainly by market inquiry, published price information serving only as cross-check; the adjustment base price locks 28 days before the bid deadline (non-tendered: 28 days before contract signing) without drift throughout; measurement prices match the corresponding measurement period, temporarily adjusted if unpublished; the final account incorporates the signed process settlements without recalculation; dispute fallback follows contract agreement > mutual price confirmation > published price information > market inquiry. (4) Three preconditions for adjustment, all indispensable: the material is listed in the contract-annexed main adjustable-price materials table (Appendix G.2.1); fluctuation exceeds the agreed risk band (±5% fallback if not agreed); the difference carries VAT only, no management fee or profit.

Applicable Boundaries

Applies to general works pricing and settlement; railways overlay the TB 10801/10811 rules (material budget price = (original price + freight within price) x (1 + procurement-keeping rate), multi-source weighted by supply share). Not for single-point price lookup; published price information is a "benchmark", not "truth" — do not book purchase costs directly at it.

Further Reading

Nature and terms: GB/T 50875-2013 Clause 2.1.16, T/ZBD 100.1-2022 Clause 7.2.3. Budget price composition: TB 10801-2024 Clause 3.2.5, TB 10811-2024 Table 2.2.2, TB/T 10813-2024 Clause 1.0.4. Adjustment mechanism: GB/T 50500-2024 Appendix A.2 (adjustment based on published price information), Clause 8.7.2 (±5% fallback), Clause 3.3.5 (difference taxation), Appendix G.2.1 (adjustable materials table). Confirmation and disputes: Appendix A.2.5, GB/T 51262-2017 Clause 5.6.4.

Keywords

Cited By