base price (reference price for adjustment)
Concept Guide
Concept
In Chinese construction pricing, the base price (reference price for adjustment) is the locked unit rate for labour, materials or machinery entered in the tender or contract. It is drawn from the GB 50500 system and from published price information issued by local cost authorities. The contractor compares this base price with the market price at an agreed reference point, often shortly before tender submission; movement within a stated risk band is borne by the contractor, and movement beyond it is adjusted. Adjustment is normally initiated by the contractor's claim, reviewed by the employer or cost consultant, and paid as a price difference in interim or final payments. The risk band, adjustable elements and source of the base price should be stated in the particular conditions.
FIDIC Mapping
| Chinese term | FIDIC term | Relation | Note |
|---|---|---|---|
| base price (reference price for adjustment) | Base Date (Sub-Clause 1.1.4) | adjacent | FIDIC fixes a date, not a unit rate; no adjustment threshold |
| risk band | Adjustments for Changes in Cost (Sub-Clause 13.7) | absent | No self-borne band; index movement from Base Date adjusts directly |
| cost index base | Schedule(s) of cost indexation (Sub-Clause 13.7) | adjacent | Both use indexation; FIDIC uses coefficients a, b, c… and indices Ln, En, Mn |
| published price information / quota norms | published price information / quota norms | distinct | China often uses government-published prices; FIDIC relies on the contract schedule |
Key differences lie in trigger, data source, risk allocation and procedural rigidity. Under Sub-Clause 1.1.4 the Base Date is 28 days before the latest date for tender submission. Under Sub-Clause 13.7, if a schedule of cost indexation is included, amounts are adjusted for rises or falls in cost. The fixed coefficient a represents the non-adjustable portion, while b, c, d… represent estimated proportions of cost elements. If no schedule is included, Sub-Clause 13.7 does not apply.
Caution: do not equate the Chinese base price with FIDIC Base Date. One is a unit rate with a risk band; the other is a date. Without a contract index schedule, 13.7 gives no adjustment route.
| Chinese Term | English Term | FIDIC Term | Relation | Notes |
|---|---|---|---|---|
| 基准价 | base price (reference price for adjustment) | Base Date (Sub-Clause 1.1.4) | adjacent | FIDIC 用基准日锁定投标截止前 28 天的状态,不设要素基期单价;中国基准价是具体人工/材料单价并与风险幅度联动,超出幅度才调,FIDIC 指数自基准日变动即调。 |
| 风险幅度 | risk band | Adjustments for Changes in Cost (Sub-Clause 13.7) | absent | FIDIC 13.7 无自担阈值带,合同含指数表时按公式直接加扣;中国风险幅度是承包人自担波动区间,制度逻辑不同。 |
| 指数基期/造价指数 | cost index base period / cost index | Schedule(s) of cost indexation (Sub-Clause 13.7) | adjacent | 均以指数调差,但 FIDIC 用固定系数 a 与 b、c、d… 及 Ln、En、Mn 指数,总系数不超过 unity;中国常用地方造价信息价,数据源与刚性不同。 |
| 基准日 | Base Date | Base Date (Sub-Clause 1.1.4) | distinct | Base Date 是日期锚点,用于判断法律与物价变化;中国基准价是价格锚点。两者名称相近但语义不同,不可互换。 |
Updated 2026-09-13
- 01
Choosing among the three bases of material price adjustment (bid price / base-period published information / jointly confirmed price): statutory sources, defaults, difference-rate versus risk-band linkage and item-by-item locking (GB/T 50500-2024 term 2.0.21, Appendix A.2, G.2.1)
Per GB/T 50500-2024 Appendix A.2.1, the base price C0 is 'the market pri…
GB/T 50500-2024 术语第2.0.21条(合同基准日)GB/T 50500-2024 App. A.2.1(基准价三来源与价差公式)GB/T 50500-2024 App. A.2.2(暂按信息价计算后按实调整)2026-10-25 - 02
The step chain of adjusting on published price information: fix the adjustable list -> lock base price C0 -> take period prices Ci -> difference x adjustable quantity Q -> adjust the excess over the risk band -> book into progress and settlement, with fallbacks for missing periods and items and the Q test (GB/T 50500-2024 Appendix A.2; against superseded GB 50500-2013 Appendix A.2)
Six steps: (1) fix the adjustable material / labour list (2024: 3.3.5 it…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.3.5 条、第 8.7.2 条、第 8.7.4 条、第 8.7.6 条、第 8.1.6 条、第 9.4.6 条GB/T 50500-2024 App. A.2.1~A.2.5(价格信息调差法)GB/T 50500-2024 App. G Table G.2.1-1、Table G.2.1-22026-10-25 - 03
Direction-specific base rules in the price adjustment method based on published price information when the contractor's tender price deviates from the base price (GB/T 50500-2024 Annex A.2.4, corresponding to Section 9.7 of the superseded GB 50500-2013): rises judge on the higher of the two prices, falls on the lower, a two-way disadvantage that blocks arbitrage, with the selection boundary against the Annex A.1 index method
Under GB/T 50500-2024 Annex A.2.4, the published-price-information adjus…
GB/T 50500-2024 建设工程工程量清单计价标准 App. A.2.4(价格信息调差法 报价偏离基准价的涨跌幅判定基数)GB/T 50500-2024 App. A.2.1(价差公式与基准价、计量周期价格、数量、风险幅度系数定义)GB/T 50500-2024 App. A.2.3(计量周期多个市场价格的取定方法)2026-10-25 - 04
Rules for determining the material adjustment base price (C0): base date, one-of-three sources and the adjustment computation base (GB/T 50500-2024)
The base price C0 = the market price level 28 days before the bid closin…
GB/T 50500-2024 建设工程工程量清单计价标准 App. A.2.1GB/T 50500-2024 术语2.0.21GB/T 50500-2024 App. A.2.42026-09-25 - 05
Can published price information directly serve as the basis for material price adjustment: legality + three preconditions (listing / beyond band / tax) (GB/T 50500-2024)
Published price information (government guidance prices) is a price sour…
GB/T 50500-2024 建设工程工程量清单计价标准2026-09-25 - 06
Three-layer playbook for locking in the prices of bulk materials: contract-side price-adjustment mechanism + procurement-side price-locking methods + material-differentiated strategy (GB/T 50500-2024)
Locking the price of bulk materials = on the contract side, first fix th…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50358-2017 建设项目工程总承包管理规范DB37/T 5096-2017 建设工程项目管理咨询规范2026-09-25 - 07
Overview of material price adjustment in construction works: applicable conditions, base price (reference price for adjustment), risk band, and calculation methods (GB/T 50500-2024 Sections 3.3/8.7 and Appendices A, G)
Four indispensable elements of material price adjustment: ① adjustable s…
GB/T 50500-2024 建设工程工程量清单计价标准T/ZBD 100.5-2023 建设工程结算审核作业指引建设部令第107号 建筑工程施工发包与承包计价管理办法2026-09-25 - 08
Handling rules when the price-information issue and the construction month are misaligned (GB/T 50500-2024 Appendix A adjustment)
Price-information adjustment takes the issue corresponding to the measur…
GB/T 50500-2024 App. A.2.1~A.2.5GB/T 50875-2013 第2.1.16条T/ZBD 100.1-2022 第7.2.3条2026-09-25 - 09
Which period's published price applies to settlement material prices: the two-date system — base price locked at the contract base date (28 days before bid closing) plus period-by-period pricing per measurement cycle (GB/T 50500-2024 Annex A.2 price-information method)
Settlement material prices are not taken from a single period (completio…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.21条、第3.3.5条、第8.7.1~8.7.4条、第10.2.3条、第10.2.7条、第10.3.2条、App. A.2.1~A.2.4、App. G.2T/ZBD 100.5-2023 · Work Guideline for Settlement Audit of Construction Works 第3.1.7条2026-09-25 - 10
Price-taking time point for the tender price ceiling: the latest issue of price information published as at the date of completion of preparation; "28 days before the tender deadline" is the adjustment base price time point, not the price-taking time point
The tender price ceiling (employer's maximum acceptable price) takes pri…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51290-2018 建设工程造价指标指数分类与测算标准GB/T 50875-2013 工程造价术语标准2026-09-25 - 11
GB/T 50500-2024 rules for determining the base date: agreement first; tendered works = 28 days before the tender deadline, non-tendered works = 28 days before contract signing (term 2.0.21)
The base date (GB/T 50500-2024 term 2.0.21) is the date on which the con…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.21条、第8.7.1条、第8.8.1条GB/T 50500-2024 App. A.1.6、A.2.1、A.2.42026-09-25 - 12
Price reference time point for final account: adjust period by period per each measurement period's published price information (government guidance prices) during construction and aggregate; interim settlements by construction stage (China's 2020 milestone-based interim settlement system; no exact international equivalent) are incorporated without recomputation (not a single issue at the month of completion)
A final account has no 'single settlement-period price information': con…
GB/T 50500-2024 建设工程工程量清单计价标准 App. A.2、Ch. 10、App. E.6.1GB/T 50875-2013 工程造价术语标准T/ZBD 100.1-2022 建设工程造价数据建设通用标准2026-09-25 - 13
Rules for determining the construction-period price (measurement-period market price Ci) in material adjustment (GB/T 50500-2024 appendix A.2)
The construction-period price is the measurement-period market price Ci…
GB/T 50500-2024 App. A.2.1~A.2.5GB/T 50500-2024 第8.7.2/8.7.4条GB/T 50500-2024 App. A.1.52026-09-25 - 14
Overview of the full-chain use rules for construction cost published price information: nature, price calibers, stage-by-stage pricing, and frequent misconceptions
Published price information means reference guide prices issued by cost…
GB/T 50875-2013 工程造价术语标准GB/T 50500-2024 建设工程工程量清单计价标准TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25