Guidance price vs market price: definition sources, essential difference and role positioning (official term definitions + three-channel classification rule)
The guidance price (construction cost information) is the labor/material/plant-shift price information plus cost indices and indicators periodically published by cost management agencies — a reference, guidance price (GB/T 50875-2013 clause 2.1.16); the market price is the actually transacted price, acquired mainly through transactions. The two differ essentially; per T/ZBD 100.1-2022 clause 7.2.3 they must be developed as data under the three channels market/guidance/vendor-quotation prices, strictly never mixed. Guidance prices serve maximum bid prices, adjustment base prices and dispute fallbacks; market prices serve actual procurement cost verification, filling gaps of materials without guidance prices, and — after joint confirmation — as settlement bases.
Applicable Codes
- GB/T 50875-2013 工程造价术语标准
- T/ZBD 100.1-2022 建设工程造价数据建设通用标准
- GB/T 51095-2015 建设工程造价咨询规范
Topic Positioning
Answers "what is the difference between guidance price and market price": compares the two on official definition, acquisition channel, essential difference and role positioning — for correct price selection in budget compilation, adjustment and settlement price confirmation.
Core Conclusions
- Definition and source: the guidance price is "construction cost information" — price information on labor, materials, engineering equipment and construction-plant shifts plus cost indices and indicators published by construction cost management agencies (GB/T 50875-2013 clause 2.1.16), a reference/guidance price; the market price is the price actually agreed by market transacting parties, mainly from transaction prices, supplemented by inquiry records, provisional-price determinations and other process data.
- Essential difference: per T/ZBD 100.1-2022 clause 7.2.3, element prices should be acquired through the three channels — market, guidance and vendor-quotation prices — developed as classified data and never mixed: guidance prices exist objectively but essentially differ from actual market prices (broad collection, statistical lag, often prior-period composites with averaging), while market prices fluctuate with supply and demand in real time, reflecting the current actual transaction level.
- Role positioning: guidance prices are used to compile maximum bid prices, contract-agreed adjustment bases, and dispute fallbacks; market prices are used to verify actual procurement costs of materials and equipment and to fill gaps of materials without guidance prices, becoming settlement bases after joint confirmation. Settlement price priority is generally: contract agreement > joint confirmation > guidance price > market inquiry.
Applicable Boundaries
Applies nationwide to understanding price-selection calibers and price-data development; not to any region, project or specific price values. Publication cycle, issue number and VAT inclusion of guidance prices follow the local agency's current release; price review of bulk main materials, equipment and plant shifts leans toward prices obtained by market investigation (GB/T 51095-2015 clause 7.4.2).
Further Reading
GB/T 50875-2013 "Standard for construction cost terminology" clause 2.1.16 (definition of construction cost information); T/ZBD 100.1-2022 "General standard for construction cost data development" clause 7.2.3 (three-channel acquisition and classified development); GB/T 51095-2015 "Code for construction cost consultancy" clause 7.4.2 (price determination caliber); see the card "priority of price bases in settlement" for the settlement linkage.
Keywords
Related Cards
- →
Six-step cleaning of historical cost data and three cost-forecasting paths (price-source classification / four-dimension tagging / index adjustment)
Historical cost data cannot be used directly for forecasting: first apply six-step cleaning (source classification, completeness and deduplication, outlier handling, caliber normalization, four-dimension tagging, average-level adjustment), then choose a forecasting path — the consumption-indicator + current-price method is the most stable; the index-adjustment method uses base date 2017-01-01 with index 1000; use the analogy method when samples are insufficient; mixing market prices/published prices/vendor quotations, different cost types, or different regions is strictly forbidden.
- →
Priority of price bases for construction payment settlement: contract agreement > price confirmed by both parties > published price information > market price enquiry (purchase contract / invoice prices require the employer's approval of material prices)
Bases for settlement by priority: ① contract-agreed price (fundamental basis); ② price confirmed by the employer and contractor (certified record of agreed material prices — report quantity and unit price to the employer for verification before purchase; deemed approval upon lapse of the response period); ③ published price information (base price for adjustment / dispute fallback); ④ market price enquiry (for provisional sums and materials without published prices). Purchase contract prices and invoice prices only prove actual cost and become a basis for settlement only after the employer's approval of material prices.
- →
Building an enterprise material-price database: a three-channel-separated price fact table, collection-and-review workflow, and dynamic maintenance mechanism
An enterprise database holds "tradable, voucher-backed real prices" rather than published prices: build market prices/published prices/vendor quotations as three separately classified channels, never mixed, dominated by transaction prices; the core is a traceable price fact table (material identifier + price attributes + region and period + source voucher + quality status), supported by a material master-data table, a supplier table, and an inquiry ledger; transaction data updates in real time, estimate/approximate-estimate libraries adjust monthly/quarterly, and prices without vouchers are not entered.
Cited By
- ←
Labour cost pricing basis within the all-in unit rate: norm-based labour cost (base-period workday rate) versus current-period published labour price information and labour market prices, the applicable rules at the tender price ceiling and tender stages, and the test that the labour cost differential and the labour cost inside the all-in unit rate are not adjusted twice
Labour cost in the all-in unit rate = norm (budget) labour consumption x the current-period labour rate (published price information or a market price confirmed by the parties): consumption is locked to the quota manual while the rate is opened to the current-period market (GB/T 51095-2015, clause 5.3.9). The base-period workday rate published with the quota manuals is not itself the pricing input for BOQ rate build-up; it is a component of norm-based labour cost and the comparison base of the labour cost differential. At the tender price ceiling stage the published labour rates / published price information take precedence (GB/T 50500-2024, clauses 5.2.1 and 5.2.8); the tender is priced freely by the tenderer on its in-house norms and the market, but not below cost and not above the tender price ceiling (clauses 6.1.1, 6.1.3, 6.2.1). Differentials caused by changes in costs carry VAT only, not overheads or profit (clause 3.3.5); the same labour differential may be taken once only, in either the current-period-price pricing system or the base-period-price-plus-differential system, and must not be stacked on the labour cost already inside the all-in unit rate.
- ←
Pricing and clawback of over- and under-supply of employer-provided (free-issue) materials: at the supply-contract price, not published price information or market price (GB/T 50500-2024 clause set 3.6)
Contractor-caused over-drawing of free-issue materials is charged at the corresponding supply contract's unit price on the over-drawn quantity and deducted from interim or final payments - neither at published price information nor market price; over-quantity = drawn quantity - drawing-derived quantity x (1 + effective wastage), the derivation being actual quantities from the construction drawings for unit-rate contracts and reasonable quantities from the contract drawings for lump-sum, variations excluded. Employer-caused short supply, non-conforming delivery or delay falls on the employer - extension per chapter 8 plus losses including profit; on a switch to contractor purchase, prices come from joint tendering or market enquiry, published price information serving only provisionally where no period market price exists or the dispute is large.
- ←
Settlement pricing when the confirmed price of a provisionally priced material differs from published price information: the procedurally formed confirmed price (net award price, or employer-confirmed enquiry price) replaces the provisional sum, published prices serving only as the contractually agreed base or a provisional fallback in disputes
Settlement follows the confirmed price formed under the contractual procedure - for mandatory-tender items, the net-of-VAT material award price replaces the provisional price; otherwise the employer-confirmed (or jointly enquired) net price does (GB/T 50500-2024 clauses 8.4.1, 8.4.5); published price information neither replaces the confirmed price nor caps or floors it - it applies only where the contract makes it the base, or where a period market price is missing or the dispute is large, provisionally, 'to be trued up in later payments against actual market prices' (Appendix A clause A.2.2). The difference adjusts only the material provisional price (net) within the all-in unit rate, other cost heads unchanged, carrying VAT but never overheads or profit (clauses 8.4.6, 3.3.5 item 4).
- ←
Can published price information directly serve as the basis for material price adjustment: legality + three preconditions (listing / beyond band / tax) (GB/T 50500-2024)
Published price information (government guidance prices) is a price source expressly recognized for price adjustment (for fluctuation) (Appendix A.2.1: both the base price C0 and the measurement-period price Ci may adopt the current published price information issued by the cost management agency; A.2.4: where published price information serves as both base price and current price, adjust within the agreed risk band), but adjustment is not unconditional and full-scope: (1) the material must be listed in the contract annex "schedule of price-adjustable key materials" (Table G.2.1-1; not listed, not adjusted); (2) only the portion beyond the contract-agreed risk band is adjusted to actual, the band being contractor-borne; (3) where the contract sets no band, fluctuation beyond 5% is the fallback trigger (8.7.2). The price difference carries value added tax (VAT) only, not management fee or profit (3.3.5).
- ←
Published price information vs actual procurement price: issuing body, basis and timeliness, settlement effect (practice comparison)
The published price information is a regional statistical composite price periodically issued by cost management agencies (monthly/quarterly issues, lagging, excluding brand, batch, haul distance and payment terms); the actual procurement price is the enterprise's real current transaction price (including brand/model, batch, haul distance and freight, payment terms, VAT rate, bargaining power and other specifics) — either can be higher or lower: batch purchase plus cash payment is often below the published price information, while small-batch urgent purchase or long-distance haul is often above. The published price information is used for tender price ceilings, contract-agreed adjustment base prices and dispute fallback references; the procurement contract price and the invoice price only prove actual cost and must first be confirmed by the employer as an agreed material price (certified record of agreed material prices) before being upgraded to a basis for settlement.
- ←
Scope of the "delivered price" basis of published material price information: the mainstream basis includes the material price at source, freight and handling charges, transport wastage and purchasing and custody charges, but exceptions exist by region and category; read the notes of the current issue before use, and never count twice charges already included
The mainstream basis of published price information is the "delivered price" - it includes the material price at source, freight and handling charges, transport wastage and purchasing and custody charges (GB/T 50875-2013 defines the material unit price as the comprehensive average price formed from the source of the building material to the site warehouse up to issue from stock). But the basis is not uniform nationwide: Beijing Construction Cost Information states that steel members exclude freight and handling charges, which may be increased on the facts where transport conditions are constrained. The notes of the current issue must be read before use, and freight and handling charges or purchasing and custody charges already included must not be counted again in the rates.
- ←
Composition of multi-month construction material published price information (government guidance prices): three methods for determining multiple market prices within a measurement period (GB/T 50500-2024 Appendix A.2.3 — arithmetic mean / quantity-weighted / price for the main consumption period)
Multi-month construction does not automatically mean weighting: when measuring monthly (or per agreed measurement period), each period takes its own market price Ci, differences computed and accumulated period by period — no prior weighting needed; only when one measurement period spans multiple price issues (e.g., quarterly measurement, monthly published price information (government guidance prices)) is Ci composed per A.2.3's three methods: (1) arithmetic mean, (2) weighted average with completed quantities, (3) price during the main-consumption construction period — method and priority order must be contractually agreed. Method choice directly flips threshold triggering — the same data can show +8.75% (arithmetic, exceeds the 5% risk band, adjustable) vs +4.13% (weighted, within the risk band, no adjustment); the composed Ci enters dP = sum[(Ci - C0(1 +/- r)) x Q] x (1 + VAT rate), with price differences subject to value added tax (VAT) only, not management fee or profit (3.3.5).
- ←
Price adjustment (for fluctuation) calculation for ready-mixed (commercial) concrete: whole-factor adjustment per m³, adjustment to actual beyond the risk band, and tax treatment (GB/T 50500-2024 Appendix A.2 adjustment based on published price information)
Ready-mixed concrete is adjusted as one whole adjustable factor per m³ (the published price information (government guidance prices) already includes raw-material cost; cement, sand/gravel, and admixtures must not be adjusted separately again, to avoid double counting), using the GB/T 50500-2024 Appendix A.2 adjustment based on published price information: beyond-band unit price difference = Ci - C0×(1+r) on a rise, or C0×(1-r) - Ci on a fall; adjustment amount = unit price difference × Q; the agreed risk band (no-adjustment tolerance, e.g. ±5%) prevails; where not agreed or unclear, fluctuation beyond 5% is the fallback trigger (8.7.2); the price differential attracts value added tax (VAT) only, not management fee or profit (3.3.5); where the tender price differs from the base price (reference price for adjustment), apply the A.2.4 cross-base rule against arbitrage. Worked example: C0=480 CNY/m³, Ci=530 CNY/m³, r=5%, Q=1000 m³; fluctuation 10.4% triggers; beyond-band unit difference 26 CNY/m³; adjustment 26,000 CNY; including 9% VAT the tax-inclusive amount is 28,340 CNY.
- ←
Matching material specifications in price information with actual materials: four-element matching, grade/unit conversion, and adjustment-specification locking
Price-taking from price information matches precisely by the four elements name + specification + model + unit (the GB/T 50500-2024 Appendix G adjustment table is listed accordingly); with no same specification, convert by the adjacent grade or grade price difference with records (marked "converted"); inconsistent measurement units are converted first (e.g., rebar in t vs kg/m using theoretical weight); missing items are filled by market inquiry (>=3 suppliers); when adjusting per price information, lock the specification caliber at contract signing via the adjustable main materials table (Appendix G.2.1) and match one-to-one at settlement; where the current issue lacks the corresponding specification, provisionally compute per the current price information and adjust later per actuals (Appendix A.2.2).
- ←
Whether published price information includes VAT: the code caliber is a tax-exclusive price, while regional publications mix tax-inclusive and tax-exclusive in practice
Under the code caliber, price information as a pricing basis should be a tax-exclusive price excluding deductible input VAT (GB/T 50500-2024 Clause 3.1.6, T/ZBD 100.2-2022 Clause 4.4.2, TB 10801-2024 general principles), with VAT = tax-exclusive cost x tax rate (9% under general taxation) listed separately; however, the actual calibers of regionally published price information mix tax-inclusive and tax-exclusive — always verify against the current issue's publication notes before use; provisional prices of specialty works are tax-inclusive as an exception.
- ←
Adjustment of the contract price (GB/T 50500-2024 Chapter 8): eleven triggering events, mechanism by section, and FIDIC mapping
Adjustment of the contract price is the mechanism for changing the contract price during performance. GB/T 50500-2024 Cl. 8.1.1 lists eleven triggering events: BOQ errors, provisional sums, PC sums (provisional estimates), contractor's services, dayworks, changes in costs, changes in laws and policies, variations, additional works, claims, and other events agreed by the parties; the procedure runs submit, check, re-check, review and confirm (8.1.2). Key mechanics: BOQ errors and variations share one re-rating ladder (identical items at contract rates; analogous items converted; different items negotiated), with a 15% quantity boundary for re-rating (8.2/8.9); provisional sums are controlled by the employer and any unused balance reverts at final account (8.3); PC-sum items are replaced by tender prices — materials pre-VAT, specialist works VAT-inclusive (8.4); dayworks are measured under 7.5 (certified dayworks records) and priced at the BOQ daywork rates (8.6, with deemed approval if verification is overdue, 7.5.5); changes in costs are adjusted beyond the agreed band — 5% by default — by index-based (formula) adjustment or adjustment based on published price information (8.7 + Annex A), the differential carrying VAT only; changes in laws pivot on the base date, adjusting price and/or time for enactments, amendments, repeals or new interpretations after it, with no upward adjustment during contractor-caused delay (8.8); additional works may follow contract rates or freshly negotiated rules under a supplementary agreement (8.10); claims cover events outside 8.2-8.10 — compensatory, not punitive, and mutual, with profit added for eight categories of employer-risk events (8.11). FIDIC counterparts sit scattered across Clause 13 (variation valuation 13.3, provisional sums 13.4, changes in laws 13.6, changes in cost 13.7 — 2017 numbering) and Clause 20 claims (28-day hard time bar): adjacent institutions, not chapter-for-chapter equivalents.
- ←
Handling rules when the price-information issue and the construction month are misaligned (GB/T 50500-2024 Appendix A adjustment)
Price-information adjustment takes the issue corresponding to the measurement period (the month of completion), not the publication time; where the current issue is unpublished, provisionally use the nearest published issue and refund or supplement the difference later per actual prices (A.2.2); a measurement period spanning multiple issues uses the arithmetic mean / weighted mean / price of the main-consumption period (A.2.3); the base price C0 is locked 28 days before the bid submission deadline and does not drift with construction (A.2.1, A.2.4).
- ←
Building a material published-price-information vs actual purchase-price comparison table: four-segment table structure, deviation analysis, and the four-party certification and sign-off process
The comparison table = base segment (name/specification precise to the grade, unit, work location and period) + price segment (published price information stating the issuing agency, period, and tax-inclusive/delivered basis; purchase price on the same basis, side by side) + analysis segment (deviation rate = (purchase price − published price information)/published price information × 100%, each deviation explained and checked against the contract risk band) + signature segment (applicant/supervision/employer signatures and seals). Based on the GB/T 51095-2015 Appendix E.0.4 enquiry (price verification) form, extended with "published price information (agency + period)" and "deviation rate" columns; process: ≥ 3 enquiries → comparison → supervision price verification → employer confirmation before purchase (failure to reply within the time limit deemed acceptance) → contract at the approved price → archive into the price library. The signed and sealed comparison table is the certified record of agreed material prices — a basis for preparing the settlement.
- ←
Priority of price bases for construction payment settlement: contract agreement > price confirmed by both parties > published price information > market price enquiry (purchase contract / invoice prices require the employer's approval of material prices)
Bases for settlement by priority: ① contract-agreed price (fundamental basis); ② price confirmed by the employer and contractor (certified record of agreed material prices — report quantity and unit price to the employer for verification before purchase; deemed approval upon lapse of the response period); ③ published price information (base price for adjustment / dispute fallback); ④ market price enquiry (for provisional sums and materials without published prices). Purchase contract prices and invoice prices only prove actual cost and become a basis for settlement only after the employer's approval of material prices.
- ←
Tender pricing strategy: market price enquiry as the primary basis with published price information as auxiliary cross-validation — bidders price independently and are not compelled to use published price information
Tender pricing takes market price enquiry as primary and published price information as auxiliary cross-validation: GB/T 50500-2024 Clauses 6.1.1/6.2.1 require bidders to price independently per their own conditions; published price information (a reference price) has no mandatory binding force at the tendering stage; the cost floor and competitiveness can only be measured by actual enquiries — published price information is used to check abnormal enquiry results, supplement references for rare materials, and support explanations when comparing with the tender price ceiling; provisional sums and employer-supplied/specified brands follow the tender documents; enquiries must unify the basis of pricing and keep records.
- ←
Alternative adjustment paths when price information lacks the specification: mutually confirmed price / purchase price / awarded-bid price fallbacks + the same-caliber red line for C0 and Ci (GB/T 50500-2024 Appendix A.2)
Price information is only one of the Ci sources listed in A.2.1; lacking the specification does not mean adjustment is impossible: determine Ci per (1) contract agreement, (2) the market price of the measurement period confirmed by both parties, (3) the purchase price determined by the employer (submitted before purchase; deemed accepted upon overdue silence), (4) the awarded bid price of the trading center for similar works under similar conditions in the same period; C0 takes prices by the same rules; where information is temporarily missing, provisionally account per the published price and settle later. Red lines: C0 and Ci must be of the same caliber; the alternative price must represent the market price level of the measurement period; keep a full trail of certified records of agreed material prices.
- ←
Price-taking time point for the tender price ceiling: the latest issue of price information published as at the date of completion of preparation; "28 days before the tender deadline" is the adjustment base price time point, not the price-taking time point
The tender price ceiling (employer's maximum acceptable price) takes prices at the price level of the preparation period: use the latest issue (month/quarter) of construction cost price information published as at the date of completion of preparation, noting the issue in the deliverable; where a difference from actual construction-period conditions exists, adjust reasonably (GB/T 50500-2024 Clause 5.2.9). "28 days before the tender deadline" (for works not subject to tendering, 28 days before the date of contract signing) is the lock-in time point for the contractual adjustment base price C₀ in Appendix A.2.1, used for adjustment for cost fluctuation after award, and is unrelated to price-taking for the tender price ceiling.
- ←
Pricing rules for materials without published price information: market price enquiry + pre-purchase price approval + order of determination in dispute appraisal
Materials without published price information are priced by market price enquiry: enquire with no fewer than 3 suppliers, compare, and take a representative price; submit to the employer for approval of the material price before purchase (silence within the agreed period constitutes deemed acceptance) and keep a ledger for the record; awarded contract prices for similar works in the same period, market prices adopted in the tender price ceiling, and industry price information may serve for cross-validation; in dispute appraisal, prices are determined in the order approved-and-signed price > contractually agreed price > mutually agreed price. Market prices, published price information, and manufacturer quotations must be used by classification and strictly never mixed.
- ←
Whether published price information / base-period prices include freight and miscellaneous charges: price-caliber determination (ex-factory caliber excludes, delivered-to-site caliber includes) and the A/B/C classification of railway base-period prices
Whether price information includes transport charges depends on the publication caliber: the ex-factory/market-price caliber excludes freight and miscellaneous charges (to be listed separately when compiling budgets), while the delivered-to-site caliber includes them (usable directly for price assembly). Railway base-period prices per TB 10813-2024 fall into three classes: Class A = original price x (1 + procurement-and-keeping rate) and Class B = comprehensive ex-factory price x (1 + procurement-and-keeping rate) both exclude freight and miscellaneous charges; only Class C = (original price + freight-and-miscellaneous charges within the price) x (1 + procurement-and-keeping rate) includes them. Always read the current issue's publication notes to confirm the caliber before use.
- ←
Whether published price information / base-period prices include the procurement and keeping fee: caliber determination (railway base-period prices fully include, most provincial price information excludes, highway adds separately)
The procurement and keeping fee is added by rate and not merged into the material original price. Railway base-period prices (TB/T 10813-2024), Classes A/B/C, all include the procurement and keeping fee (rates per TB 10811-2024 Table 2.2.2); the price information published by most provinces and cities uses the market-price caliber and excludes the fee, so it must be added separately when compiling budgets; a few publish "comprehensive prices including the fee", which must not be double-counted. Highway JTG 3830-2018 adds the fee separately on the basis of (original price + freight and miscellaneous charges + off-site transport loss). Always read the current issue's publication notes before use.
- ←
Price-taking rules when one material has multiple published prices / original prices: weighted average by supply quantity at compilation, three agreed methods at adjustment, unified caliber
When one material has multiple prices, take prices by scenario: at compilation, original prices from multiple origins/supply channels are determined by weighted average per supply proportions (TB 10811-2024 Clause 2.2.1 — neither the high nor the low); at adjustment, multiple market prices within the same measurement period use one of the three contractually agreed methods and its priority — arithmetic mean, weighted mean with completed quantities, or the price of the main-consumption construction period (GB/T 50500-2024 Appendix A.2.3); for multi-agency publications with no agreement, follow the caliber of the agency at the project location; before taking prices, unify the tax-inclusive/exclusive, delivered/ex-factory, and specification-grade calibers; market prices, published prices, and manufacturer quotations are used by classified channels and strictly never mixed.
- ←
Framework of causes for the gap between quota norms and actual market construction costs: social-average vs contractor-specific levels, base-period vs market prices, six source dimensions, and practical responses
Quota norms are a pricing benchmark compiled under normal construction conditions, social-average consumption levels, and base-period prices — not a mirror of a contractor's actual cost. The gap is normal, not anomalous, and arises from six dimensions: social-average vs contractor-specific levels; base-period price vs market price (bridged by adjustment for price differentials); normal conditions vs actual working conditions; generous vs actual measured quantities (wastage-rate/margin differences); mechanisation and organisation level; and market competition and supply-demand. Profit margin = quota norm price − contractor's actual cost; settlement allows no reimbursement at actuals — follow the contract's clauses on price differentials / published price information (government guidance prices).
- ←
Price reference time point for final account: adjust period by period per each measurement period's published price information (government guidance prices) during construction and aggregate; interim settlements by construction stage (China's 2020 milestone-based interim settlement system; no exact international equivalent) are incorporated without recomputation (not a single issue at the month of completion)
A final account has no 'single settlement-period price information': contractual agreement takes precedence; where adjustment is agreed, base price C0 locks the price for the period 28 days before the tender deadline (= FIDIC Base Date) (for non-tendered works, 28 days before contract signing), while measurement-period price Ci is taken period by period using the published price information (government guidance prices) issued for the corresponding construction completion period (month/quarter), adjusted and accumulated period by period; confirmed interim settlements by construction stage are incorporated directly into the final account without re-measurement or re-pricing; where the published price information for a given period has not been issued, that period's published prices may be used provisionally, with subsequent payments adjusted on an actual basis.
- ←
Rules for determining the construction-period price (measurement-period market price Ci) in material adjustment (GB/T 50500-2024 appendix A.2)
The construction-period price is the measurement-period market price Ci in the adjustment formula — the same three source options as the base price C0 (market price confirmed by both parties / the cost agency's current guidance price / same-period analogous winning-bid prices at the trading center) and must represent the current price level of the measurement period; multiple prices within a period take the arithmetic mean, the quantity-weighted average against completed quantities, or the price for the main-usage period, the order agreed by the parties; absent price information, adjust provisionally by the guidance price and true up later; the procurement-price method requires reporting to the employer for confirmation before purchase, non-response within the agreed time deemed acceptance; on schedule delay, take the higher of the planned and actual progress-date prices where the employer is at fault, the lower where the contractor is.
- ←
Handling paths when published price information clearly deviates from actual market prices: unify the bases of comparison first to exclude illusions, then correct by scenario (temporary adjustment with later true-up / price certification / expert assessment as fallback)
Published price information is only a reference guide price issued by the cost management agency (GB/T 50875-2013 Clause 2.1.16), not a mandatory price. On deviation, first unify the bases of comparison — VAT-inclusive/exclusive, delivered/ex-works, specification and unit — to exclude illusions; where an adjustment dispute is significant, temporarily use the current published price information and true up later against actual market prices, refunding the excess or paying the shortfall (GB/T 50500-2024 Appendix A.2.2); absent agreement or where the agreement is unclear, substitute the price confirmed by mutual market price enquiry and certify the price before purchase (deemed approval upon lapse of the response period, A.2.5); construction cost expert assessment ranks the certified-and-approved price > contract-agreed price > mutually agreed price (GB/T 51262-2017 Clause 5.6.4). Enquiries from >= 3 suppliers with records in a register; adjust only beyond the agreed risk band (5% if not agreed).
- ←
Overview of the full-chain use rules for construction cost published price information: nature, price calibers, stage-by-stage pricing, and frequent misconceptions
Published price information means reference guide prices issued by cost management agencies, running through the whole chain "price-limit compilation - bid verification - adjustment base - settlement fallback". Five iron rules: contract agreement first; caliber unification (tax-inclusive/exclusive, delivered/ex-factory, procurement-keeping fee); period alignment (base price locked 28 days before the bid deadline, measurement price matched to the measurement period); adjust only beyond band (±5% if not agreed); confirmation with records (submit to the employer before purchase, silence deemed acceptance).