Special-region construction additions in highway estimates and budgets (plateau, wind-sand, coastal): region definition, charging base and rate sources (JTG 3830-2018 clause 3.1.6 item 4, Appendix F)

The highway special-region construction addition holds only plateau, wind-sand and coastal items: plateau starts at 2000m altitude; wind-sand follows Appendix F's three zones and nine classes (semi-arid / semi-humid = zone 1; arid and extremely arid-cold = zone 2; extremely arid-hot = zone 3; cover over 50% fixed, 10%~50% semi-fixed, under 10% shifting); the coastal scope is set by the coastal provinces' transport authorities. All three charge on the sum of norm labour and norm plant of each works class, at the rates of Tables 3.1.6-4 / -5 / -6; a route crossing several altitude or wind-sand zones computes separately or weight-averages by quantity (route length). This system has no alpine-cold, remote-region or primeval-forest items.

Applicable Codes

  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.6条第4款
  • JTG 3830-2018 App. F《全国风沙地区公路施工区划》
  • JTJ 003—86《公路自然区划标准》

Positioning

The three components of the 'special-region construction addition' in highway estimates - plateau, wind-sand and coastal - their region definitions, charging base and rate sources, per JTG 3830-2018 clause 3.1.6 item 4 and Appendix F. Not the same standard as the railway system (whose special construction addition holds wind-sand, plateau, primeval forest, traffic interference and line blockade) or the building / municipal fee norms - never cross-apply.

Core conclusions

  1. Composition and nature (clause 3.1.6 item 4): 'The special-region construction addition comprises the plateau-region, wind-sand-region and coastal-region construction additions.'

1 Plateau: 'the extra cost of reduced labour and plant efficiency above 2000m altitude from climate and pressure.' A route passing two or more altitude zones computes the addition separately per zone or takes a quantity-weighted average rate for the whole line; 'base = norm labour + norm plant of each works class, at Table 3.1.6-4 rates.'

2 Wind-sand: 'the cost of wind and sand protection and climate measures, reduced labour and plant efficiency, and clearing and repairing sand accumulation and wind erosion, required in desert regions by the construction and acceptance codes for quality and safety.' Zoning: the national wind-sand highway construction zoning in Appendix F; 'where local meteorology and natural features differ materially from Appendix F, the provincial transport authority fixes the wind-sand zone from local data under the stated criteria'; a route crossing two or more zones weight-averages by route length; base as above, Table 3.1.6-5 rates.

3 Coastal: 'the extra cost of reduced labour and plant efficiency from sea wind, waves and tides in coastal construction. The applicable scope (regions) is set by each coastal province's transport authority.' Base as above, Table 3.1.6-6 rates.

  1. The quantified wind-sand classes (three zones, nine classes): from JTJ 003-86 (highway natural zoning), the desert-highway research reports and regional climate - semi-arid and semi-humid sandy land = zone 1; arid and extremely arid-cold desert = zone 2; extremely arid-hot desert = zone 3; each zone divides by cover (vegetation / gobi cover) into fixed (over 50%), semi-fixed (10%~50%) and shifting (under 10%) desert; 'cover is determined by the survey and design staff at design stage.'

  2. Key points: this system knows only plateau, wind-sand and coastal - no alpine-cold, remote or primeval-forest items; the three apply by actual location, may coexist, and never substitute one another. Plateau band rates are covered by the dedicated plateau card.

Applicable boundaries

  • For highway estimates and budgets compiled under JTG 3830-2018 only; railway, building and municipal works follow their own compilation rules and fee norms - different region types and bases.
  • The rates of Tables 3.1.6-4 / -5 / -6 must be read from the current text; they are banded by wind-sand class and altitude zone - never a single composite rate.
  • Plateau's 2000m is a hard quantitative threshold; the coastal regions have no national list - the coastal provinces' authority decides, and neither designer nor cost engineer may declare 'coastal' on their own.
  • Wind-sand zoning and cover are survey-and-design outputs; estimates presuppose the design documents - no self-zoning or borrowing of adjacent rates.
  • Other preliminaries are separate: e.g. the rainy-season addition excludes indoor, tunnel and installation works - its conditions never replace this item's regional applicability.

Further reading

JTG 3830-2018 clause 3.1.6 item 4 sub 1)-3) and Tables 3.1.6-4/-5/-6; Appendix F (national wind-sand highway construction zoning); JTJ 003-86; the cost-of-works composition in clause 3.1.1.