Highway employer's (owner's) management fee rate coefficient adjustments: stand-alone tunnels / stand-alone super-major bridges x 1.3, offshore works x 1.2 (JTG 3830-2018 clause 3.3.2)
Per clause 3.3.2 of JTG 3830-2018: for stand-alone tunnels with twin-bore length over 5,000 m, and stand-alone super-major bridges such as cable-stayed bridges with water depth over 15 m and span >= 400 m and suspension bridges with span >= 800 m, the employer's (owner's) management fee is computed at the table 3.3.2-1 rate x 1.3; offshore works (monthly average working days under 15 d year-round in the construction period due to wind and waves) x 1.2; the two coefficients do not stack.
Applicable Codes
- JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.3.2条、Table 3.3.2-1、Table 3.3.2-2
- JTG 3370.1 · Specifications for Design of Highway Tunnels - Section 1: Civil Works (特长隧道分级口径对比)
Topic Positioning
This card explains the rate-coefficient adjustment rules for the employer's (owner's) management fee in JTG 3830-2018 clause 3.3.2: which works multiply by 1.3, which by 1.2, the definition of "stand-alone works" and the computation base — for direct application in estimate/budget compilation.
Core Conclusions
Per JTG 3830-2018 clause 3.3.2 (original text): "For stand-alone tunnels with twin-bore length over 5,000 m, and stand-alone super-major bridge works such as cable-stayed bridges with water depth over 15 m and span equal to or greater than 400 m and suspension bridges with span equal to or greater than 800 m, the employer's (owner's) management fee is computed at the rates in table 3.3.2-1 multiplied by 1.3; for offshore works [works whose monthly average working days over the whole year of the construction period (excluding freeze-up) are fewer than 15 d due to wind and wave effects], the employer's (owner's) management fee is computed at the table 3.3.2-1 rates multiplied by 1.2."
Points:
- The 1.3 tunnel threshold is "twin-bore length over 5,000 m" — not a generic "extra-long tunnel" (per JTG 3370.1 grading, extra-long means L > 3,000 m); tunnels of 3,000-5,000 m take the normal table 3.3.2-1 rates.
- Quantified conditions for stand-alone super-major bridges: cable-stayed bridges with water depth > 15 m and span >= 400 m; suspension bridges with span >= 800 m.
- "Stand-alone tunnels" and "stand-alone super-major bridge works" mean projects approved as independent items under the capital construction procedure — tunnels and bridges within route projects do not qualify for 1.3 even if the twin-bore length exceeds 5,000 m or the spans match.
- 1.3 (stand-alone tunnel / stand-alone super-major bridge) and 1.2 (offshore works) are parallel cases and do not stack.
- Computation caliber: the employer's (owner's) management fee is computed progressively at table 3.3.2-1 rates on the quota construction-installation cost, then multiplied by the coefficient.
- The same clause also fixes the project information fee (incl. whole-life BIM and related costs), computed progressively at the table 3.3.2-2 rates on the quota construction-installation cost.
Applicable Boundaries
- Applies only to works independently approved under the capital construction procedure; tunnels and bridges within route projects do not take 1.3.
- Offshore works test: monthly average working days under 15 d year-round in the construction period (excluding freeze-up) due to wind and waves.
- Works not meeting the conditions take the normal table 3.3.2-1 rates without coefficient.
- This card covers only the employer's management fee caliber at the estimate/budget stage (JTG 3830-2018), not other fees or other compilation measures.
Further Reading
- JTG 3830-2018 clause 3.3.2, table 3.3.2-1 (rate table, note 3 defining "stand-alone works"), table 3.3.2-2 (project information fee rates).
- Distinguish calibers: the "twin-bore length over 5,000 m" test here differs from JTG 3370.1's extra-long tunnel grading (L > 3,000 m) — do not conflate.
Keywords
- 建设单位管理费
- 业主管理费
- JTG 3830-2018
- administrative compilation rules for estimates and budgets
- 费率系数1.3
- 独立隧道
- 独立特大型桥梁
- 海上工程