Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Highway 2018 quota-norm system — taxes and duties: VAT output tax listed separately; taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate (JTG 3830-2018 clause 3.1.10)

Per clause 3.1.10 of JTG 3830-2018 "Administrative Compilation Rules for Estimates and Budgets of Highway Construction Projects": taxes and duties mean the VAT output tax that state tax law requires to be included in the cost of works (construction and installation), and the formula is: taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate. Together with the clause 3.1.1 rule of separation of net price and VAT, all six bracketed items are computed at prices (rates) exclusive of deductible input VAT — input VAT enters no cost item and taxes and duties are listed separately in the project cost. The compilation rules do not lock the rate value; follow the finance and tax authorities — since 1 April 2019 the construction VAT rate under the general taxation method is 9% (MOF/STA/GAC Announcement No. 39 of 2019). Special costs (site construction fee, statutory work safety levy) do not enter the tax base.

Applicable Codes

  • JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.10条(税金定义与公式)、第3.1.1条(价税分离)
  • 财政部 税务总局 海关总署公告2019年第39号(建筑业增值税税率9%)

Topic Positioning

This card sets out the definition of "taxes and duties" in JTG 3830-2018 "Administrative Compilation Rules for Estimates and Budgets of Highway Construction Projects", the formula in clause 3.1.10, and how they are computed under the separation of net price and VAT rule — for use in compiling and reviewing highway estimates and budgets.

Core Conclusions

  • Definition (clause 3.1.10 verbatim): "Taxes and duties mean the VAT output tax that state tax law requires to be included in the cost of works (construction and installation)." — taxes and duties are solely this one item, the VAT output tax; surcharges, corporate income tax and the like are not included (they do not enter the estimate/budget cost composition).
  • Formula (clause 3.1.10): taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate. Direct cost = labour cost + material cost + plant and machinery cost (clause 3.1.2); the norm-based material price for estimating is built up as (material price at source + freight and handling charges) × (1 + off-site transport wastage rate) × (1 + purchasing and custody charges rate) − recoverable packaging value.
  • Separation of net price and VAT (clause 3.1.1): apart from special costs, the cost of works is calculated under the separation of net price and VAT rule, i.e. every cost is computed at prices (rates) exclusive of deductible input VAT — so all six bracketed items are net of VAT, input VAT enters no cost item, and taxes and duties are listed separately in the project cost. Total cost of works = direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit + taxes and duties + special costs.
  • Rate: the compilation rules lock no specific figure; the "construction VAT rate" follows the relevant finance and tax authority provisions — from 1 April 2019 the construction VAT rate under the general taxation method is 9% (MOF/STA/GAC Announcement No. 39 of 2019, reduced from 10%); current compilation uses 9%.
  • Special costs (site construction fee, statutory work safety levy) do not participate in the separation of net price and VAT and do not enter the tax base; the statutory work safety levy = cost of works (construction and installation) excluding the levy itself × percentage rate, the rate being taken as not less than 1.5% (clause 3.1.11).
  • Compilation tip: the notes to Form 03 (calculation sheet for the cost of works) compute taxes and duties as (direct cost + preliminaries + overheads + statutory levies and fees + profit) × rate (excluding permanent equipment procurement cost), a difference in basis from the clause 3.1.10 formula (which includes permanent equipment procurement cost) — follow clause 3.1.10 when compiling, and check projects with permanent equipment procurement cost carefully to avoid under-stating taxes and duties.

Applicable Boundaries

  • Applies only to the compilation of estimates and budgets for highway construction projects (JTG 3830-2018 quota-norm system); the pricing standards of other sectors (e.g. the building and municipal GB/T 50500 series, which levies tax on a BOQ basis) do not use this formula.
  • Taxes and duties are the VAT output tax listed as a separate item; urban maintenance and construction tax, education surcharges, corporate income tax, stamp duty and similar levies do not enter the estimate/budget composition of the cost of works.
  • This formula is on the general taxation method basis; the simplified VAT scheme and small-scale taxpayers follow finance and tax authority provisions separately.
  • The rate changes with finance and tax policy — use the rate in force at the time of compilation (9% since 1 April 2019).

Further Reading

  • JTG 3830-2018 clause 3.1.10 (definition and formula of taxes and duties), clause 3.1.1 (composition of the cost of works and the separation of net price and VAT rule), clause 3.1.2 (composition of direct cost; norm-based material price formula), clause 3.1.9 (profit at 7.42% of norm-based direct cost plus preliminaries plus overheads), clause 3.1.11 (special costs: site construction fee, statutory work safety levy, with the safety levy rate not less than 1.5%).
  • Rate basis: MOF/STA/GAC Announcement No. 39 of 2019 (construction VAT rate reduced from 10% to 9% from 1 April 2019).

Keywords

Cited By