taxes and duties (VAT under the current standard)
- 01
Whether the all-in unit rate includes statutory levies and taxes: comparison and determination between BOQ-based pricing (non-fully-loaded) and the fully loaded all-in rate
Whether the all-in unit rate includes statutory levies and taxes depends…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准GB/T 51095-2015 建设工程造价咨询规范2026-10-01 - 02
GB/T 50500-2024 VAT pricing basis: all-in unit rates are fully inclusive prices excluding VAT, with VAT listed and assessed separately
BOQ item all-in unit rates and their totals are fully inclusive prices e…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.1.6条、第3.2.11条GB/T 50875-2013 工程造价术语标准 第2.2.58条2026-09-25 - 03
Highway 2018 quota-norm system — taxes and duties: VAT output tax listed separately; taxes and duties = (direct cost + permanent equipment procurement cost + preliminaries + overheads (company and site) + statutory levies and fees + profit) × construction VAT rate (JTG 3830-2018 clause 3.1.10)
Per clause 3.1.10 of JTG 3830-2018 "Administrative Compilation Rules for…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.10条(税金定义与公式)、第3.1.1条(价税分离)财政部 税务总局 海关总署公告2019年第39号(建筑业增值税税率9%)2026-09-25 - 04
GB 50500-2013 -> GB/T 50500-2024: changes to the clauses on statutory levies and fees, taxes and the mandatory health, safety and environmental (HSE) provisions — mandatory provisions withdrawn, the bills restructured into four parts, and the item renamed statutory safety provisions
2013 Clause 3.1.6, “statutory levies and fees and taxes must be calculat…
GB 50500-2013 第3.1.5、3.1.6条(强制性条文)GB/T 50500-2024 第3.1.2、3.2.5、3.2.11、2.0.9、3.1.6条建办〔2005〕89号《建筑工程安全防护、文明施工措施费及使用管理规定》2026-09-25