explanatory notes of the estimate
- 01
Full workflow for preparing the tender bill of quantities: preparing entity and object, the seven bases of preparation, itemisation with the five elements and item description, the four-part BOQ composition, deliverables and appendix forms, error liability, and the interface with the tender price ceiling
Chapter 4 of GB/T 50500-2024 provides: the bill of quantities is prepare…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 3.1.2、3.1.6、3.1.8 条,第 4.1.1~4.1.7 条,第 4.2.1~4.2.7 条,第 5.1.1、5.2.1、5.2.3、5.2.6、5.2.10 条,第 6.1.7 条,第 7.2.1 条,第 8.2.1、8.2.3 条,第 8.9.1~8.9.2 条GB/T 50500-2024 App. B Table B.1.1、App. C Table C.1.1、App. D Table D.4.1、App. E Table E.1.1/E.2.1/E.2.3/E.3.1/E.3.2/E.3.4/E.4.1/E.4.2/E.4.3/E.4.4/E.4.5/E.5.1、App. G Table G.1.1GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第 4.1.2、4.1.4、4.2.1、4.2.2、4.2.4、4.2.5 条及App. A~App. Q2026-10-25 - 02
Constituent documents of the final account (cover / signature page / contents / compilation notes / tiered summary tables and their standard sources) and the list of compilation bases (GB/T 51095-2015, GB/T 50326-2017, DB37/T 5130-2018 etc.)
Per GB/T 51095-2015 Article 8.2.2, final account documents shall include…
GB/T 51095-2015 · Code for construction cost consultation 第8.2.2条(文件组成)、第8.2.4条(编制依据)、App. F(清单计价成果文件表式)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works App. D Table D.3.1(竣工(过程)结算编制(审核)说明)GB/T 50500-2024 第10.3.1、10.3.2、10.3.8、10.3.12条2026-10-25 - 03
Composition of highway estimate and budget documents: cover/title page/contents/explanatory notes/computation tables, Group A/Group B division and table computation order (JTG 3830-2018 section 2.3)
Per clause 2.3.1 of JTG 3830-2018, highway estimate and budget documents…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.3节 文件组成《公路工程基本建设项目设计文件编制办法》2026-09-25 - 04
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-con…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 05
Rapid completeness review of a budget document: four-layer quick check — document set integrity, scope consistency, inter-table cross-checks, and content elements
Review budget completeness with a four-layer quick check: ① document set…
GB/T 51095-2015 建设工程造价咨询规范T/ZBD 100.5-2023 建设工程结算审核作业指引DL/T 5591-2021 20kV及以下配电网工程建设预算编制导则2026-09-25