all-in unit rate
Concept Guide
Concept
In the Chinese bill-of-quantities pricing system, the all-in unit rate (zonghe danjia) is the core pricing unit. It is the sum of labour, materials, construction plant and machinery, enterprise overheads, profit, and a defined allowance for risk, all bundled into a single rate for one measured unit of a work item or a preliminaries item. The mechanism dates from the bill-of-quantities valuation standards introduced from 2003 onwards: the employer supplies the bill of quantities and bears responsibility for its accuracy, while tenderers fill in a rate for each item, producing the priced bill of quantities from which the tender total is aggregated.
Three features define the mechanism. First, quantity and price are separated: quantities are given by the employer, prices are competitively set by tenderers, so quantity risk sits with the employer and price risk with the contractor. Second, the rate is fully bundled: unlike the older quota-based approach, which listed labour, materials, plant, overheads and profit separately, the all-in unit rate merges them, and overheads and profit are no longer shown as separate lines in the bill or compared separately in tender evaluation. Third, the rate is adjustable: contracts commonly provide that where actual quantities deviate from billed quantities beyond an agreed threshold, where material prices fluctuate beyond an agreed risk band, or where a variation changes the item's characteristics, the rate may be adjusted or re-rated.
The all-in unit rate is therefore both a pricing device and a risk-allocation device: a defined band of risk is absorbed into the rate in advance, while risk beyond that band flows back into the contract price through the adjustment mechanism.
FIDIC Mapping
Under FIDIC contracts, the closest functional equivalent is the all-in unit rate entered in the bill of quantities (BOQ). In the Red Book framework, tenderers fill in rates and prices item by item, and the BOQ must be formed so that those rates cover, without duplication or omission, the total work to be carried out and all other obligations of the contractor under the contract. The bundling logic therefore runs in the same direction as the Chinese all-in unit rate.
The differences are substantive. First, the pricing route differs: the Chinese rate is built and reviewed against a national or regional quota system, with a strong regulatory flavour, whereas FIDIC rates and prices are set by the contractor on a self-priced basis, with no contractual quota, and both evaluation and payment follow the contractor's own filled rates. Second, adjustment differs: FIDIC handles re-rating through its variations and adjustments mechanism, under which a new rate is derived first from relevant rates or prices in the BOQ with reasonable adjustments, and only where no relevant rate exists is it derived from reasonable Cost plus profit; Chinese adjustment instead relies more on contractual deviation thresholds and external references such as published information prices and quotas. Third, the risk band differs: the "defined range of risk" inside a Chinese all-in unit rate is usually fixed by local valuation rules or special conditions, while under FIDIC risk allocation is set by the Conditions of Contract and Particular Conditions together, and the contractor must absorb foreseeable risk within its own rates.
Usage warning: in international tender or project documents, a literal word-for-word rendering of the Chinese term should not be used, as it is not the idiom of international BOQ practice. Use all-in unit rate, or rates and prices where the context is the BOQ itself, and state the cost composition where necessary so that the rate is not mistaken for one excluding overheads or profit.
| Chinese Term | English Term | FIDIC Term | Relation | Notes |
|---|---|---|---|---|
| 综合单价 | all-in unit rate | all-in rate / rates and prices | adjacent | 功能相近但组价路径不同:中国综合单价依托定额与计价规范组价并含约定风险包干,FIDIC 的 rates and prices 由承包商自主填报、无定额参照,风险分配由合同条件界定。 |
| 工程量清单 | bill of quantities (BOQ) | Bill of Quantities | adjacent | 两者均为量价分离的载体,但中国清单由招标人提供并承担工程量准确性责任,FIDIC 下 BOQ 的编制与计量程序由序言及合同约定,承包商填报单价时须自行覆盖全部义务。 |
| 变更计价 | valuation of variations | Variations and Adjustments | adjacent | FIDIC 下新单价优先由 BOQ 中相关单价推导并作合理调整,无相关单价时基于合理成本加利润;中国综合单价的调整更多依赖合同约定的偏差幅度与信息价、定额等外部参照。 |
| 综合单价调整 | re-rating of unit rates | new rate or price | adjacent | 两者都触发单价重定,但触发条件不同:中国以工程量偏差幅度、材料价格波动幅度和项目特征不符为主要触发点,FIDIC 以变更指示及单价不再合理为主要触发点。 |
Updated 2026-09-13
- 01
Constituent requirements of BOQ item descriptions and the three common defects (vague description / missing measurable parameters / disconnect from the work process), with corrected drafting (GB/T 50500-2024 clauses 2.0.5, 2.0.27, 4.1.7, 4.2.2, 4.2.4; GB/T 50854-2024 clause 4.1.2)
An item description, by definition (GB/T 50500-2024 clause 2.0.5), is 'a…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.5条、第2.0.27条、第4.1.4条、第4.1.7条、第4.2.2条、第4.2.4条、第6.1.6条、第6.1.7条、第8.2.1条、第8.9.1条GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第4.1.2条、App. E Table E.2.1(现浇混凝土构件,code 010502)2026-11-08 - 02
Attributing the ironmongery of proprietary doors and windows (hinges, locks, handles, closers, coordinators): the list basis folds it into the door's all-in rate with no separate item, while quota bases split by their door-and-window chapter notes - 'proprietary with ironmongery / hinges only / ordinary in, special out' - with special ironmongery on separate items
Two bases decide 'included or not': the list basis (GB/T 50854-2024 Appe…
DB11/T 2382-2024 建设工程施工消耗量标准 第4.9.1~4.9.21条、App. A Table A.8.11 特殊五金安装GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、App. H Table H.1.1、第H.11.5条、第H.11.6条GB/T 50500-2024 建设工程工程量清单计价标准 第3.3.3条2026-11-04 - 03
Reading published price information as tax-inclusive or net, and the de-taxing conversion: de-tax by element (goods 13%, transport 9%, levy rate 3%), then custody, then into the all-in unit rate - with the order-bias test and double-tax prevention
Published prices are often tax-inclusive or freight-inclusive: read the…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、3.1.6、3.2.11、8.4.1条JTG 3830-2018 公路工程建设项目概算预算编制办法 第3.1.1、3.1.2条TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.2节2026-10-25 - 04
Whether a site instruction record confirming quantities equals approved payment: layered test of evidentiary force, routes for fixing the unit rate, agency effect of sign-off beyond authority, and the settlement treatment of ratification or refusal (including the clause requirements of GB 50500-2013 section 9.14)
It does not. A site instruction record confirming quantities settles onl…
GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works 第9.1.1、9.3.1、9.6.2、9.14.1~9.14.4条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第8.9.1、7.5.5、12.2.1条GB/T 51262-2017 · Code for Construction Cost Appraisal 第5.9.1~5.9.3条2026-10-25 - 05
Cost items expressly excluded from the all-in unit rate in BOQ-based pricing (VAT, statutory levies and fees, main contractor's attendance and coordination provisions, provisional sums, employer-borne costs, statutory safety provisions), the correct billing position of each, and audit identification of mixed allocation
Under GB/T 50500-2024 Clause 2.0.9 the all-in unit rate 'includes labour…
GB/T 50500-2024 第 2.0.9、2.0.13、2.0.17 条GB/T 50500-2024 第 3.1.6、3.2.2、3.2.4、3.2.5、3.2.9、3.2.11、3.6.1、3.7.4 条GB/T 50500-2024 第 4.2.6 条、第 6.2.4 条、第 8.3.1 条、App. E Table E.4.5、App. G.1 Table G.1.12026-10-25 - 06
Labour cost pricing basis within the all-in unit rate: norm-based labour cost (base-period workday rate) versus current-period published labour price information and labour market prices, the applicable rules at the tender price ceiling and tender stages, and the test that the labour cost differential and the labour cost inside the all-in unit rate are not adjusted twice
Labour cost in the all-in unit rate = norm (budget) labour consumption x…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、3.1.6、3.3.5、5.2.1、5.2.4、5.2.8、6.1.1、6.1.3、6.2.1、8.6.3、8.7.1条,App. A.2.1、A.2.4GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条、App. CTB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.1.1~3.1.5条、第4.1.1~4.1.2条2026-10-25 - 07
Attribution of quantity gaps between BOQ quantities and quota quantities, and the rate conversion: all-in unit rate P = Sum(Tn) / Q, four destinations of quantity gaps (into the BOQ quantity / into the rate / into quota consumption / into the risk allowance), and conversion points for typical work items
BOQ quantities and quota quantities must be kept on two separate tracks…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第3.1.6条、第3.3.3条、第6.1.6条、第8.2.1条、第8.9.2条GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. A Table A.2.1(基础土石方 010102)GB/T 50857-2024 市政工程工程量计算标准 App. J J.2.12026-10-25 - 08
Choosing the format of the all-in unit rate analysis sheet, its mandatory preparation requirements, and its roles across tendering, settlement and audit (GB/T 50500-2024 Appendix E, tables E.2.2-1 and E.2.2-2)
GB/T 50500-2024 Appendix E provides that detailed all-in unit rate analy…
GB/T 50500-2024 第2.0.9条GB/T 50500-2024 第3.1.7条GB/T 50500-2024 第3.2.2条2026-10-25 - 09
The relationship between the risk allowance inside the all-in unit rate and contractual price adjustment for fluctuation: within the band the risk allowance absorbs the movement, beyond the band only the excess is adjusted, and the two are never counted twice
The risk allowance and contractual price adjustment are a two-stage allo…
GB 50500-2013 建设工程工程量清单计价规范 第2.0.8条(综合单价)、第2.0.9条(风险费用)、第3.4.3条、第5.2.2条、第6.2.2条、第9.8.1~9.8.3条、App. A.2.3、App. L.2/L.3GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条、第3.1.6条、第3.2.2条、第3.3.1条、第3.3.3条、第3.3.5条、第8.7.2条、第8.7.6条、App. A.1、App. A.2.4、App. G.22026-10-25 - 10
The rate build-up path from quota line items to the all-in unit rate of a BOQ item and the cost calculation procedure: divisional work item cost as BOQ quantity x all-in rate, sum of quota line item amounts / BOQ item quantity (3 decimal places for quantities, 2 for rates), the three pricing methods, the analysis sheet identical to the BOQ rate, and the taxed versus tax-exclusive cost structures
The all-in unit rate of a BOQ item is converted as 'sum of quota line it…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第 2.0.9、2.0.10、3.1.5、3.1.7 条GB/T 51095-2015 · Code for construction cost consultation 第 5.3.8、5.3.9 条及App. CGB/T 50875-2013 · Standard glossary of project costs 第 2.3.6 条2026-10-25 - 11
The depth standard for describing item descriptions in the bill of quantities: describe item by item per the appendices, satisfy the needs of fixing the all-in unit rate, and never substitute the quota work content (trades)
The item description is the pricing parameter that fixes the all-in unit…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.5条、第2.0.27条GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、第4.2.4条、App. ETable E.1.1、第E.7.1条GB 50860-2013 构筑物工程工程量计算规范 第4.2.4条(强制性条文)及条文说明2026-10-20 - 12
Whether the all-in unit rate includes statutory levies and taxes: comparison and determination between BOQ-based pricing (non-fully-loaded) and the fully loaded all-in rate
Whether the all-in unit rate includes statutory levies and taxes depends…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准GB/T 51095-2015 建设工程造价咨询规范2026-10-01 - 13
GB/T 50500—2024 Cost composition of the all-in unit rate (labour + materials + plant and small tools cost + management fee + profit + risk cost, excluding VAT)
Per GB/T 50500—2024 (Clauses 2.0.9, 3.1.6, 3.2.2), the all-in unit rate…
GB/T 50500—2024 · National Standard of Construction Quantity Bill PricingGB 50500—2013 · Code of Valuation with Bill Quantity of Construction Works2026-09-29 - 14
Pricing channels for works outside the contract scope and unforeseen works: recognising and pricing additional works, when dayworks apply, and the rules for using provisional sums
Where the contractor, at the employer's request, completes additional wo…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.10.1条GB/T 50500-2024 第7.5.2条GB/T 50500-2024 第8.3.2条2026-09-26 - 15
GB/T 50500-2024 VAT pricing basis: all-in unit rates are fully inclusive prices excluding VAT, with VAT listed and assessed separately
BOQ item all-in unit rates and their totals are fully inclusive prices e…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.1.6条、第3.2.11条GB/T 50875-2013 工程造价术语标准 第2.2.58条2026-09-25 - 16
Definitions, cost composition and applicable conventions of the direct-cost rate, the all-in unit rate and the fully loaded all-in rate compared (Order No. 107 of the Ministry of Construction, GB/T 50500-2024, GB/T 51095-2015, etc.)
The three rate conventions widen in scope in turn: the direct-cost rate…
《建筑工程施工发包与承包计价管理办法》(建设部令第107号)第五条《建筑工程施工发包与承包计价管理办法》(住房和城乡建设部令第16号,2014年施行;建设部令第107号的现行替代版本)GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第2.0.9条、第3.1.6条、第3.1.7条2026-09-25 - 17
Pricing-attribution rules for equipment foundations, secondary grouting, and vibration-isolation devices: BOQ caliber vs quota caliber
Equipment concrete foundations belong to civil works and are priced sepa…
GB/T 50856-2024 通用安装工程工程量计算标准SJG 111.3-2022 城市地下综合管廊工程消耗量标准TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程2026-09-25 - 18
Why the all-in unit rate under GB/T 50500-2024 excludes VAT: price-exclusive tax character, separation of net price and VAT, the rationale for listing taxes and duties (VAT under the current standard) separately, and practical reasons
Under GB/T 50500-2024, the all-in unit rate = labour cost + material cos…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction worksGB/T 50875-2013 · Standard glossary of project costs2026-09-25 - 19
Three-dimensional cost analysis method for billed (BOQ) items: quantity, price, and fee (quantity recheck → price reasonableness → fee composition)
Split the cost of a single billed (BOQ) item into three independent dime…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准TB 10801-20242026-09-25 - 20
Determining labour cost in the all-in unit rate: the two-step "norm resource consumption × labour unit price" method and its standard basis
Labour cost in the all-in unit rate is determined in two steps as "norm…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9、8.6.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9、7.4.2条TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 第3.1节2026-09-25 - 21
Full-process handling rules for prime cost (PC) sums for materials included in the all-in unit rate across tender, performance and settlement (GB/T 50500-2024)
For prime cost (PC) sums for materials (tax-exclusive unit prices), tend…
GB/T 50500-2024 建设工程工程量清单计价标准中华人民共和国招标投标法实施条例T/ZBD 100.5-2023 建设工程结算审核作业指引2026-09-25 - 22
GB/T 50500-2024 rules for adjusting price differences, management fee, and tax after the actual price of provisionally priced materials/equipment is determined (Section 8.4)
Per GB/T 50500-2024 Section 8.4, once the actual price of provisionally…
GB/T 50500-2024 第 8.4.1、8.4.5、8.4.6 条GB/T 50500-2024 第 2.0.14、3.2.11、8.1.8 条2026-09-25 - 23
Derivation of new (built-up) rates when a design change changes the construction process (construction method): qualifying the source + the three-tier path of GB/T 50500-2024 clause 8.9.1
"Change of construction method" is a price-impact factor of "item descri…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.9.1条、第8.9.2条、第8.9.3条GB/T 51095-2015 建设工程造价咨询规范 第5.3.9条DB11/T 382-2017 北京市建设工程造价管理暂行规定 第5.3.2条2026-09-25 - 24
Six-step labour-material-plant analysis for the all-in unit rate: apply quota line items -> take consumption and compilation-period unit prices -> add management fee and profit -> fill the all-in unit rate analysis sheet
Labour-material-plant analysis splits the all-in unit rate by "consumpti…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25 - 25
Unbalanced bidding: definition, common tactics, risks for both employer and contractor, and response paths
Unbalanced bidding is a tender-pricing method that adjusts the unit pric…
GB/T 50875-2013 工程造价术语标准GB/T 50500-2024 建设工程工程量清单计价标准DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 26
Disallowance grounds on final-account review for double counting of earthwork haul distance: the all-in unit rate cost envelope under GB/T 50500-2024 + the "disposal of surplus (excavated) material" itemisation basis in the measurement standards
Earthwork loading and haulage costs are already included in the correspo…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准2026-09-25 - 27
Distinguishing the basis of the all-in unit rate from that of the fully loaded all-in rate (incl. taxes and specified on-costs): composition differences, applicable scenarios, and risks of mixed use
Narrow-sense all-in unit rate = labour cost + material cost (including e…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准2026-09-25 - 28
Market-inquiry pricing when no applicable quota exists: the two-step method (multi-source inquiry → labor/material/machinery pricing) and traceability/audit requirements
A missing quota does not mean missing pricing rules: the all-in unit rat…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 29
Avoiding mispricing when material names are similar but specifications differ: three lines of specification-checking defense across preparation, pricing, and audit
The three forms of mispricing (specifications missing from item characte…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 30
Three bases for the composition of the construction price: cost elements, BOQ-based pricing, and final-account listing
The construction price (cost of works (construction and installation)) h…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准2026-09-25 - 31
GB/T 50500-2024 vs GB 50500-2013 edition change: all-in unit rate composition changes and the repositioning of statutory levies and fees and taxes and duties in the BOQ-based pricing system
The 2024 edition removes "statutory levies and fees" entirely from the B…
GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works (住房城乡建设部公告 2024 年第 212 号,2025-09-01 实施)GB 50500-2013 · Code of Valuation with Bill Quantity of Construction Works (已废止)2026-09-25 - 32
Overheads (company and site) within the all-in unit rate vs. site management fee within lump-sum preliminaries: distinction and prevention of duplicate charging
Overheads (company and site) are on-costs (indirect costs) in nature and…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25 - 33
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-con…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 34
GB/T 50500-2024 Appendix E pricing cost summary: Table E.1.1 summary hierarchy (project → single project → unit work) and aggregation rules for billed items, preliminary items, other charges and VAT
GB/T 50500-2024 Appendix E contains a single general summary table — Tab…
GB/T 50500-2024 建设工程工程量清单计价标准 App. E(Table E.1.1/E.5.1/E.6.1)GB/T 50500-2024 第3.1.6条GB/T 50500-2024 第2.0.9条术语 综合单价2026-09-25 - 35
Whether one work content can apply multiple quota items: multi-sub-item rate build-up for BOQ items is allowed; duplicate application for the same process is prohibited
Determined in two layers: (1) one BOQ item applying multiple quota sub-i…
GB 50860-2013 构筑物工程工程量计算规范GB/T 50860-2024 构筑物工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准2026-09-25 - 36
Master framework for cost review, re-check, and anomaly identification: the cross-footing main line, three-layer progression, six focus points, and three axioms
The first principle of anomaly identification is the cross-footing relat…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 51095-2015 建设工程造价咨询规范GB/T 51262-2017 建设工程造价鉴定规范2026-09-25 - 37
Determining the pricing risk scope within the all-in unit rate: contract agreement first + statutory fallback of GB/T 50500-2024 Sections 3.3/8.7
Risk-scope determination follows 'contract agreement first, statutory fa…
GB/T 50500-2024 建设工程工程量清单计价标准 第3.3.1~3.3.6条GB/T 50500-2024 第8.7节GB/T 50500-2024 App. A2026-09-25 - 38
Definition and cost composition of the all-in unit rate (GB/T 50500-2024 Clause 2.0.9, GB/T 50875-2013 Clause 2.2.58)
All-in unit rate = labour cost + material cost (including engineering eq…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.9条GB/T 50875-2013 工程造价术语标准 第2.2.58条2026-09-25 - 39
Determining material cost within the all-in unit rate: the two-step norm resource consumption × material unit price method, special situations, and the tax-exclusive boundary
Material cost = norm material consumption × norm-based material price fo…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准GB/T 51095-2015 建设工程造价咨询规范2026-09-25