Master framework for cost review, re-check, and anomaly identification: the cross-footing main line, three-layer progression, six focus points, and three axioms
The first principle of anomaly identification is the cross-footing relation — data must bear quantitative relations to other data; breaking a cross-footing relation creates suspicion. The general approach progresses in three layers: machine cross-footing (closure/equality/mutual-verification checks) -> statistical outlier screening (sorting/deviation/dispersion/indicator ranges) -> evidence re-check (final determination per calculation rules and the chain of evidence); anomalies concentrate in six places: prices, quantities, labour, machinery, materials, and periods. Suspicion is not a verdict, a single piece of evidence is untrustworthy, and procedure matters as much as substance.
Applicable Codes
- GB/T 50500-2024 建设工程工程量清单计价标准
- GB/T 51095-2015 建设工程造价咨询规范
- GB/T 51262-2017 建设工程造价鉴定规范
- T/ZBD 100.5-2023 建设工程结算审核作业指引
- DB37/T 5161-2020 建设工程造价数据交换及应用标准
Topic Positioning
This card is the master methodology for "review, re-check, and anomaly identification" of construction costs: find flaws in data self-consistency, and finalize with the chain of evidence. Applicable to tender review and normalization (arithmetic and compliance check), progress measurement, final account review, construction cost expert assessment (judicial appraisal), and more.
Core Conclusions
The first principle of anomaly identification is the cross-footing relation — no datum is isolated; it necessarily bears quantitative relations to other data: all-in unit rate = labour + materials + machinery + overhead + profit (VAT excluded); actual consumption = opening + entry - closing - returns - scrap; cost aggregation must synchronize with physical progress and output-value statistics (accrual basis). The general approach progresses in three layers: (1) machine cross-footing — hard quantitative closure checks (equality, mutual verification), screening the full volume in seconds; (2) statistical outlier screening — sorting, deviation, dispersion, indicator ranges, narrowing to dozens of items; (3) evidence re-check — finalizing item by item per calculation rules and the chain of evidence. Anomalies concentrate in six places: prices, quantities, labour, machinery, materials, and periods. Three axioms: suspicion is not a verdict — reductions must be recalculated per rules with basis; a single piece of evidence is untrustworthy — only cross-verification is valid (two ledgers agreeing is hard to overturn); procedure and substance matter equally — the 28-day time bar for claims, measurement certification and sign-off, and three-level review signatures: losing procedural rights is as fatal as substantive error.
Applicable Boundaries
Applies to cost review, re-check, and anomaly identification under the pricing on a bill of quantities (BOQ) basis (GB/T 50500-2024), covering tender review and normalization (arithmetic and compliance check), stage settlement during construction, final account, and construction cost expert assessment (judicial appraisal). This card is a general framework; specific red-line values (deviation ranges, wastage rates, review ratios) must be grounded in each industry's quota norms and contract provisions; cross-footing and statistics only circumscribe suspects and cannot directly serve as reduction basis.
Further Reading
See GB/T 50500-2024 Clause 2.0.9 (all-in unit rate definition), Section 8.11 (28-day dual-node time bar for claims), Clauses 10.2.3/10.3.12 (validity of stage settlement during construction and final account); DB37/T 5161-2020 Clause 5.2.3 (unit-price closure check Price=Labour+Material+Machine+Overhead+Profit); GB/T 51095-2015 Clauses 3.3.2, 3.3.4 (three-level management with two-level review, review ratio no less than 10%); GB/T 51262-2017 Clauses 5.6.4, 5.9.1 (material price and site instruction / variation record dispute assessment rules); T/ZBD 100.5-2023 (final account review scope, interfaces, provisional sum for specified materials / nominated works, free-issue materials review points).
Keywords