Engineering Knowledge Cards.
Confidence HighUpdated 2026-11-04

Attributing the ironmongery of proprietary doors and windows (hinges, locks, handles, closers, coordinators): the list basis folds it into the door's all-in rate with no separate item, while quota bases split by their door-and-window chapter notes - 'proprietary with ironmongery / hinges only / ordinary in, special out' - with special ironmongery on separate items

Two bases decide 'included or not': the list basis (GB/T 50854-2024 Appendix H) holds hinges, pivots, handles, locks, latches, stops, closers, rollers and tracks, floor springs and the like as inherent to the door - folded into the all-in rate, never listed apart, save 'locks installed alone' at 010801006 per set; where the item description omits ironmongery, clause 4.1.2 ('deemed to include all work necessary') with GB/T 50500-2024 clause 3.3.3 bars both separate listing and claims. The quota basis reads the chapter notes of the volume applied: Beijing 4.9.3 - metal doors carry their matched ironmongery, fire doors exclude locks / closers / hinges / coordinators / concealed latches; Jiangsu and Shaanxi timber-door items carry hinges only, the rest on special-ironmongery items; Shenzhen's proprietary fire doors carry all - the same project may flip conclusions between systems.

Applicable Codes

  • DB11/T 2382-2024 建设工程施工消耗量标准 第4.9.1~4.9.21条、App. A Table A.8.11 特殊五金安装
  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、App. H Table H.1.1、第H.11.5条、第H.11.6条
  • GB/T 50500-2024 建设工程工程量清单计价标准 第3.3.3条
  • 江苏省建筑与装饰工程消耗量(2026版)第八章 门窗工程 说明及工程量计算规则
  • 陕西省新编消耗量定额(2024征求意见稿)第八章 说明八、九、十
  • SJG 111.2-2022 城市地下综合管廊工程消耗量标准(Vol. 2)第6.1.5、6.1.8、6.2.4条
  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程 第四节 特殊五金 FY-1659~FY-1665
  • TB/T 10813-2024 铁路工程材料基期价格 第一节 门窗及附件
  • 天津市装饰装修工程工程量清单计价指引(2025)表H.1、表H.2、表H.8

Positioning

Whether the ironmongery of proprietary doors and windows (timber and flush doors, metal doors, steel and timber fire doors, works and special doors, full-glass doors, civil-defence doors) - hinges, lever locks, handles, closers, coordinators, floor springs, latches, stops - already sits in the door price (proprietary unit price / quota item), and when a 'special ironmongery erection' item must run. The list-measurement logic and the quota logic stay separate - never infer one from the other.

Core conclusions

1. The two bases never interconvert

List basis: door ironmongery is inherent to the door item - always in the all-in rate, never listed apart.

  • GB/T 50854-2024 Appendix H note H.11.6: 'Door ironmongery covers hinges, pivots, handles, locks, latches, stops, closers, rollers and tracks, floor springs, corner brackets, screws and all fittings needed to complete the door.'
  • Table H.1.1 timber doors (010801) work content includes 'erection of ironmongery' (Tianjin 2025 decoration guide likewise: door (frame) erection, glazing, ironmongery erection, jointing and sealing).
  • The sole exception, note H.11.5: 'locks installed alone list under the lock-installation item' - locks not supplied with the door but fitted after, per 010801006 by sets as drawn (Tianjin combinable items 4-93~94 lock, 4-95 floor lock, 4-97 guard-plate, 4-100 electronic lock).
  • Descriptions silent on ironmongery: clause 4.1.2 - 'the work contents list the principal content only; save as provided, all work necessary to complete the item is deemed included' and 'the trades behind the work contents never split into separate items'; with GB/T 50500-2024 clause 3.3.3(3) - under unit-rate contracts the contractor bears 'all work needed to complete the BOQ and its item descriptions and the work contents of the measurement standards'. So an omission in the description yields neither a separate item nor a claim or adjustment.

Quota basis: inclusion reads only the chapter notes of the volume applied - the same project may flip between systems.

2. Attribution by door class (with verbatim notes)

Class Basis Key verbatim Units
Proprietary timber doors (ordinary ironmongery) volumes clash Beijing 4.9.1: 'timber items include ordinary ironmongery; special ironmongery excluded.' Jiangsu ch.8: 'timber leaf items (timber fire doors apart) include hinge erection only; other ironmongery per design runs the special-ironmongery items.' Shaanxi 2024 draft likewise doors m2; ironmongery per piece / set
Proprietary flush doors (with frame) frame with the door, never an architrave item Beijing 4.9.2: 'flush doors include the frame and architraves'; 4.9.7: 'integrated doors include the matched frame, hinges and lock.' Jiangsu: 'flush doors per leaf as drawn' Jiangsu per leaf; list m2
Metal doors (aluminium / uPVC / thermal-break) matched ironmongery in Beijing 4.9.3(2): 'metal doors include the matched ironmongery'; (3) 'aluminium sliding doors include tracks and rollers; other sliding doors exclude them.' Jiangsu: 'save floor springs, closers, door closers-mounts, pipe handles, locks, latches, stops and like special ironmongery, glass and ordinary ironmongery are in the unit prices, their erection labour in the items' m2
Steel / timber fire doors classic clash Beijing 4.9.3(5): 'fire doors exclude locks, closers, hinges, coordinators and concealed latches.' Shenzhen SJG 111.2-2022 6.1.5: 'proprietary fire-door items carry the ironmongery erection labour, the material cost inside the door price.' Jiangsu: timber fire doors proprietary with ironmongery; steel items' work includes ironmongery erection m2
Works and special doors erection labour in, ironmongery materials apart Beijing 4.9.5(1): 'works and special doors include ironmongery, rails and bearings.' Jiangsu: 'works-door items include the erection labour of ironmongery and steelwork, the materials running the matching items, adjusted per design where taken differently' door / leaf area
Full-glass doors floor spring only Jiangsu: 'full-glass leaf items include the floor spring's labour and material only; other ironmongery per design on special items' (Shaanxi alike) leaf area
Civil-defence doors all in the proprietary price Shaanxi draft: 'concrete and steel sealed civil-defence doors are proprietary with leaf and frame; ironmongery and embeds never computed apart, inside the price' opening area
Integrated architraves includes jambs, linings, making good Beijing 4.9.8(1): 'integrated architraves include jambs, linings and making good' developed area

3. Triggers for 'special ironmongery erection' items

  1. Notes expressly excluding: Beijing's Table A.8.11 items (A-8-79 lock per set - fire lock 1.0000, all-in labour II 0.1260 workdays; A-8-81 lock class), plus locks, closers, coordinators, hinges, concealed latches, floor springs and the like.
  2. Timber leaf items carrying hinges only (Jiangsu, Shaanxi): locks, handles, closers, stops, latches on special items.
  3. Full-glass doors beyond the floor spring.
  4. Works and special doors' ironmongery materials (erection labour inside).
  5. Motorised and auto-sensing units: Beijing 4.9.9 'doors, windows and external shading exclude motorised and auto-sensing units; per design run the matching items'; 4.9.16 'special ironmongery and motorised units count as drawn'.
  6. Steel fire-door making good and frame grouting: Beijing 4.9.10 runs them apart; Jiangsu converts grout materials per design.
  7. Sub-frames: Beijing 4.9.3(4) excludes them; 4.9.17 by length (Jiangsu by frame outer line, sub-frames apart).
  8. Proprietary metal doors, roller shutters and steel fire doors: SJG 6.1.8 - the ironmongery items serve 'only where existing doors take ironmongery fitted separately' - never double with the door item.

4. Not list-listed never equals not quota-itemised (the build-up key)

Tianjin puts it best: 010802001 metal doors' work content names no 'ironmongery erection', yet the combinable items list 4-25~28 aluminium ironmongery, 4-92 sliding tracks, 4-96~105 stops, eyes, springs, closers and the like. No separate list item, but the ironmongery items must combine into the door's all-in rate - listing the door item alone and omitting the ironmongery is the true omission; conversely, where 010801006 lists lock installation, the door rate never charges the lock again.

5. The fire-door closer clash across systems

  • Beijing: fire-door items exclude locks, closers, hinges, coordinators and concealed latches - always the special items (per piece / set).
  • Shenzhen: proprietary fire-door items include erection labour, materials inside the door price; 6.2.4 counts locks, handles, closers, coordinators, tower bolts and stops per piece (only for later fitting to existing doors).
  • Jiangsu 2026: timber fire doors proprietary with ironmongery; steel items include erection.
  • Railway TB/T 10831-2024 Vol.10 s.4 'special ironmongery' FY-1659~1665 (lever and fire locks, electronic and card locks, closers, coordinators, floor springs, door stays - per piece; work content grooving, drilling, fitting), base prices in TB/T 10813-2024 s.1 (class C). Conclusion: whether the fire-door closer charges follows the quota system in force alone - one region's 'apart' never transfers.

6. Lock-grade price differences: material substitution

Special-ironmongery items hold the fitting as a whole at 1.0000 sets (Beijing A-8-79 fire lock 1.0000 + 0.1260 workdays), compiled on a specific grade; differing design grades run material substitution - swap the unit price, keep the content (1 set), labour and plant unchanged; the Jiangsu / Shaanxi wording ('adjusted per design where taken differently') says so. Never adjust the item's labour for lock price, never top up the material where the door price already holds the ironmongery.

7. Timber doors with frames: flush doors versus architraves

  • Frames arriving with the leaf as proprietary flush doors: inside the flush item (Beijing 4.9.2, 4.9.7), no architrave item; Jiangsu per leaf, the list by opening area.
  • Site-made or separately procured architraves: a separate architrave item by developed area (Beijing 4.9.12; Tianjin Table H.8, 010808 - timber / metal / stone / proprietary; stone by bedding, dry-hanging per clauses 4.13.1~28).
  • Where architraves carried the jambs (side walls and face), no second charge for their plaster or tiling.
  • Sills by horizontal projection (4.9.13); pelmets, tracks and sliding-rail runs by length (4.9.15) - all separate from architraves.

8. With the measurement rules

Beijing 4.9.11: doors and windows by drawn opening area; outside-opening units by frame-perimeter developed area; bay windows by frame perimeter; sealed and blast doors and gates by frame (leaf) perimeter; wire gates and ornamental gates by frame (leaf) perimeter; revolving doors by count, telescoping by length; insect screens by screen-frame area; composite windows - opening sashes by sash perimeter, fixed by opening area less sashes. 4.9.14 roller and venetian blinds by developed area; 4.9.19 film by pasted area; 4.9.20 roller shading by width x height (box included). List and quota areas may differ - compute each on its own rule.

Applicable boundaries

  1. The table's conclusions hold only for the volume cited; regions and sectors never cross - the first act is always reading the applied volume's chapter notes.
  2. 'Not list-listed' and 'not quota-itemised' differ: the former governs item setting, the latter rate build-up - both stand; the ironmongery items combine into the rate without a list item.
  3. Shaanxi's texts are the 2024 draft - verify on release.
  4. Where the material cost sits in the proprietary door price (Shenzhen, Jiangsu), never add it again - though 'fitting to existing doors' items remain available (SJG 6.1.8).
  5. Jiangsu timber windows run on the ancient-works and garden tables (frames and leaves at proprietary prices), not this chapter.
  6. Motorised, auto-sensing and access-control units lie outside ironmongery - separate items.

Further reading

  • Beijing DB11/T 2382-2024 clauses 4.9.1~4.9.21 with Appendix A Table A.8.11 (A-8-79 and the like) and the 4.9.11 rules.
  • GB/T 50854-2024 clause 4.1.2, Appendix H Table H.1.1, notes H.11.5 / H.11.6; GB/T 50500-2024 clause 3.3.3.
  • Jiangsu 2026 ch.8 notes and rules; Shaanxi 2024 draft ch.8 notes 8-10; SJG 111.2-2022 clauses 6.1.5, 6.1.8, 6.2.4.
  • Railway TB/T 10831-2024 Vol.10 s.4 FY-1659~1665 with the volume notes; TB/T 10813-2024 s.1; Tianjin 2025 decoration guide Tables H.1, H.2, H.8 (the combinable-items column the best list-to-quota map).

Keywords