Door and window quantity calculation rules: BOQ by opening dimensions in area; key points for casings, windowsill boards, rolling shutter doors, and special doors (GB/T 50854-2024 Appendix H)
BOQ caliber (GB/T 50854-2024 Appendix H): wooden doors 010801, metal doors 010802, and metal windows 010807 are all calculated by area (sqm) per design-drawn opening dimensions; door/window casings 010808 by the developed area around the finish face; windowsill boards 010809 by length x width; metal rolling shutter doors by opening height plus 600 mm x actual width, electric devices by set; factory/special doors are listed under code 010804. Note that the BOQ "opening dimensions" differ from the "frame outer-periphery dimensions" of some quotas — BOQ quantity is not quota quantity.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
- SJG 111.2-2022 城市地下综合管廊工程消耗量标准(Vol. 2)
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
Topic Positioning
Quantity rules for door and window bodies: wooden doors / metal doors / metal windows / rolling shutter doors / casings / windowsill boards / factory and special doors, centered on the BOQ caliber of GB/T 50854-2024 Appendix H.
Core Conclusions
- The BOQ uniformly calculates by area (sqm) per design-drawn opening dimensions: wooden doors 010801, metal doors 010802, metal windows 010807 (Tables H.1.1/H.2.1/H.7.1); curved and special-shaped windows by developed area.
- Metal rolling shutter doors by opening height plus 600 mm x actual width in sqm; electric devices by number in sets; finished fire doors by opening dimensions in sqm.
- Door/window casings 010808 by the developed area around the finish face; windowsill boards 010809 by length x width — where not stated, the length is the outer-periphery width of the window frame plus 100 mm on both sides, and the protruding width is 50 mm outside the wall.
- Factory doors (plank steel doors, steel-wood doors, etc.) and special doors (cold-storage, thermal-insulation, sound-insulation, civil-defense, vault doors, etc.) are listed by type under 010804.
- Caliber difference: the BOQ uses opening dimensions, while some quotas (e.g., the railway building quota) use frame outer-periphery dimensions, and frameless doors the door-leaf outer periphery — BOQ quantity is not quota quantity; do not mix.
Applicable Boundaries
Applies to BOQ measurement and pricing of building works; local/industry quotas follow their own volume notes; does not cover opening-side-wall decoration (plastering not added, tiling merged by actual area, casings listed separately) or curtain walls 011206 — see the cited cards.
Further Reading
GB/T 50854-2024 Appendix H Tables H.1.1/H.2.1/H.7.1/H.8.1/H.9.1/H.4.1; SJG 111.2-2022 Clauses 6.2.1-6.2.3; TB/T 10831-2024 Volume 10, Section 4, door and window works.
Keywords
- 门窗工程量
- 洞口尺寸
- 木门
- 金属门
- 金属窗
- 卷帘门
- 门窗套
- 窗台板
- 厂库房大门
- 特种门