Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Whether the side faces of door/window openings in decoration works are measured separately: no addition for plaster, inclusion of actually tiled block faces for tiling, and expanded area for door/window trim (GB/T 50854-2024 / TB/T 10831-2024 / SJG 111.2-2022)

Whether the side faces of door/window openings are measured separately depends on the finish: for general plaster, after deducting the opening the side-face area is not added (GB/T 50854-2024 Table M.1.1, TB/T 10831-2024 Volume 10 volume explanation, and SJG 111.2-2022 Volume 2 Clause 5.2.2 agree); block/tile finishes include the actually tiled side faces into the wall face at the post-tiling surface area; door/window trim (jamb linings) is listed separately at expanded area and already contains the side-face decoration without duplication; plaster on wardrobes, cupboards, bay-window slabs, AC brackets, radiator covers, pools, flower beds, bay windows protruding from the wall, cantilevered slabs, and scattered wall/column faces <=0.5 m2 are listed as miscellaneous plaster (Appendix M.2) / miscellaneous tiling (011204).

Applicable Codes

  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
  • SJG 111.2-2022 城市地下综合管廊工程消耗量标准(Vol. 2)

Topic Positioning

Answers "whether the side faces of door/window openings in decoration works should be measured separately" — by finish type in three calibers (plaster/tile/trim), a high-incidence point of "double counting and omission" in decoration takeoff; also answers the applicable scope of miscellaneous plaster/miscellaneous tiling, and the consistency of the "side faces not added" principle across building, railway building, and utility tunnel works.

Core Conclusions

  1. General plaster: wall plaster deducts the door/window opening area, and the side-face area is NOT added. GB/T 50854-2024 Standard for Measurement of Building and Decoration Works Quantities, Table M.1.1 (011201 wall/column plaster) deducts door/window openings, side faces not added; TB/T 10831-2024 Railway Engineering Budget Quota, Volume 10, Building Works, volume explanation on plaster rules, original text: "interior wall and dado plaster area shall deduct door and window openings ... and the side-face area of door/window openings and holes is likewise not added"; SJG 111.2-2022 Consumption Standard for Urban Underground Utility Tunnel Works (Volume 2, Tunnel Architecture and Decoration Works) Clause 5.2.2, same caliber: "deduct the area occupied by door/window openings and empty circles with a single area greater than 0.3 m2 ... and the side-face area of door/window openings, empty circles and holes is likewise not added; the side-face plaster of attached columns shall be merged into the wall plaster quantity". Never "deduct the opening and then add back the side faces" (double counting). Attached-column side plaster merges into the wall face; with a suspended ceiling, interior plaster height to the ceiling soffit plus 100 mm; column plaster at structural section perimeter x plaster height.
  2. Block/tile finishes: computed at the post-tiling surface area shown on the design (Table M.3.1); the actually tiled portion of opening side faces merges into the corresponding wall-face tiling quantity; where the door/window trim is already listed separately, the side faces it covers must not be counted into the wall-face tiling again.
  3. Door/window trim/jamb linings: listed separately at expanded area per the design dimensions (Table H.8.1, code 010808); the jamb lining already includes the opening side faces and front decoration, excluding trim moldings, which are executed under the decorative molding items.
  4. Miscellaneous-item boundary: plaster on wardrobes, cupboards, bay-window slabs, AC brackets, radiator covers, pools, flower beds, bay windows protruding from the wall, and cantilevered slabs, and small scattered wall/column face plaster <=0.5 m2, are listed under the miscellaneous plaster items of GB/T 50854-2024 Appendix M.2 (Appendix M Clause 8.4, original text); tiling on eaves, window sills, around door/window trim, and small scattered wall/column faces <=0.5 m2 are listed under miscellaneous tiling (011204) (Appendix M Clause 8.9). The "miscellaneous plaster" items of TB/T 10831-2024 Volume 10 likewise apply to wardrobes, cupboards, bay-window slabs, AC brackets, radiator covers, pools, flower beds, and plaster works <=0.50 m2.
  5. Window sill boards: computed at area = design length x width; where the drawings do not state dimensions, length = window frame peripheral width plus 100 mm on both sides, and the width protruding from the wall at 50 mm outside the wall face (railway quota).

Applicable Boundaries

Applies to decoration BOQs of building works (GB/T 50854-2024 Appendices H/M) and the budget quota for railway building works (TB/T 10831-2024 Volume 10), and to architecture and decoration works of urban underground utility tunnels (SJG 111.2-2022 Volume 2 Clause 5.2.2 — the wall plaster deduction/inclusion rules are consistent with building works). "Side faces not added" is limited to plaster-type finishes (including decorative plaster, and paint/coatings merged into wall faces on the same caliber); glued/dry-hung vitrified tiles are executed under the face-tile items with the same rules as tiling. Whether side faces are counted first requires confirming whether the design includes finish at that position — positions not designed must not be counted; the 0.30 m2 opening threshold applies only to decoration-interface deductions; formwork and other works have their own rules.

Further Reading

GB/T 50854-2024 Standard for Measurement of Building and Decoration Works Quantities, Appendix M Table M.1.1 (011201 wall/column plaster), Table M.3.1 (011203 wall/column tiling), Appendix M Clause 8.4 (miscellaneous plaster listing), Clause 8.9 (miscellaneous tiling), Appendix H Table H.8.1 (010808 door/window trim); TB/T 10831-2024 Railway Engineering Budget Quota Volume 10 Building Works, volume explanation Section 2 Wall/Column Face Works (including decorative molding plaster developed width 300~400 x coefficient 1.33, 400~500 x 1.67, column caps and bases merged into column area with additional labor, etc.), Section 4 Door and Window Works; SJG 111.2-2022 Consumption Standard for Urban Underground Utility Tunnel Works, Volume 2, Clause 5.2.2 wall/column face decoration works.

Keywords

Cited By