item description (work item specification)
- 01
Attributing the ironmongery of proprietary doors and windows (hinges, locks, handles, closers, coordinators): the list basis folds it into the door's all-in rate with no separate item, while quota bases split by their door-and-window chapter notes - 'proprietary with ironmongery / hinges only / ordinary in, special out' - with special ironmongery on separate items
Two bases decide 'included or not': the list basis (GB/T 50854-2024 Appe…
DB11/T 2382-2024 建设工程施工消耗量标准 第4.9.1~4.9.21条、App. A Table A.8.11 特殊五金安装GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、App. H Table H.1.1、第H.11.5条、第H.11.6条GB/T 50500-2024 建设工程工程量清单计价标准 第3.3.3条2026-11-04 - 02
Separating conduit, trunking wiring and cable laying in the BOQ: GB/T 50856-2024 Annex D codes (030412/030409) against the 2013 old codes (030411/030408), a three-column comparison of object measured x unit x item description, the tests for splitting conduit and cable segments of one circuit, and the quota chapter mapping
Under the 2024 edition, 'electrical conduits and trunking' are itemised…
GB/T 50856-2024 通用安装工程工程量计算标准 App. D Table D.12.1(配管、配线,code 030412)、Table D.9.1(电缆安装,code 030409)、Table D.8.1(滑触线装置安装,code 030408)、Table D.11.1(10kV及以下架空配电线路,code 030411)、Table D.17.3-1~Table D.17.3-8(预留长度及附加长度)GB 50856-2013 通用安装工程工程量计算规范 Table D.8(电缆安装,code 030408)、Table D.11(配管、配线,code 030411)(已被 GB/T 50856-2024 替代)GB/T 50857-2024 市政工程工程量计算标准 App. H Table H.4.1(配管、配线工程,code 040804)2026-10-25 - 03
The depth standard for describing item descriptions in the bill of quantities: describe item by item per the appendices, satisfy the needs of fixing the all-in unit rate, and never substitute the quota work content (trades)
The item description is the pricing parameter that fixes the all-in unit…
GB/T 50500-2024 建设工程工程量清单计价标准 第2.0.5条、第2.0.27条GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 第4.1.2条、第4.2.4条、App. ETable E.1.1、第E.7.1条GB 50860-2013 构筑物工程工程量计算规范 第4.2.4条(强制性条文)及条文说明2026-10-20 - 04
Reviewing tender bills of quantities: methods and criteria for detecting omissions, errors, and duplications
Check the BOQ against four baselines—tender documents, construction draw…
GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 05
Overview of bills of quantities: composition, compilation, item descriptions and handling of errors/omissions (GB/T 50500-2024)
A bill of quantities comprises four sections — trade items, preliminarie…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25 - 06
Quality control of AI-generated budgets: a systematic framework against quota misapplication and quantity omissions
Preventing quota misapplication relies on "verifying quota codes back ag…
GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 07
Measurement units for landscape plant installation (plant/m/m2/clump), plant specification terminology, and item-characteristic description essentials (GB/T 50858-2024)
Plant installation measurement units are fixed by category and planting…
GB/T 50858-2024 · Standard for Measurement of Quantities of Landscape and Greening WorksGB/T 50500-2024 · Standard for bills of quantities and valuation for construction worksCJJ 82 · Code for Construction and Acceptance of Landscape and Greening Works2026-09-25 - 08
Determining quantities where drawing dimensions are incomplete: three-tier fallback plus provisional quantities at the tender/preparation stage; re-measurement plus five-tier progressive determination at the settlement stage
Where drawings are incomplete, quantities are determined along two track…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50861-2013 城市轨道交通工程工程量计算规范T/ZBD 100.4-2023 建设工程造价鉴定作业指引2026-09-25 - 09
Decision path for selecting quota line items: item description matching -> direct application -> adjusted application -> similar construction process -> supplementary quota item submitted for approval
Applying a quota line item starts with matching "item description (work…
GB/T 50860-2024 构筑物工程工程量计算标准GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则2026-09-25 - 10
Item description vs method of measurement in the BOQ: the item description column must not stipulate the method of measurement; supplementary rules belong in the BOQ calculation-rules statement and apply as contractual agreement
Item description and method of measurement are two parallel, independent…
GB 50860-2013 · Code for Measurement of Quantities of Structures Works 第4.2.1、4.2.4、4.2.5条(强制性条文)GB/T 50854-2024 · Standard for measurement of building construction and fitting out works 第4.2.6条GB/T 50500-2024 · Standard for bills of quantities and valuation for construction works 第4.1.7条、第7.1.1条、App. D D.4.12026-09-25 - 11
Work-item BOQ listing for pools/chimneys in structures works: GB 50860-2013 Table A.1 pools (070101) and Table A.6 chimneys (070106) — codes, characteristics, and measurement boundary rules
Pools per GB 50860-2013 Appendix A Table A.1 (code 070101) have 5 BOQ it…
GB 50860-2013 · Code for Measurement of Quantities of Structures Works (Table A.1 池类070101、Table A.6 烟囱070106、第4.2.1条强制性条文、第4.2.7条、App. A.14.1/B.6.1)GB 50854-2013 · Code for Measurement of Quantities of Building and Decoration Works (钢筋项目借用)GB/T 50860-2024 · Standard for Measurement of Quantities of Structures Works (住建部公告2024年第191号,自2025-09-01实施,替代GB 50860-2013)2026-09-25 - 12
A seven-step process for systematically checking BOQ errors and omissions (BOQ defects) and defect-liability handling
With tender drawings, the calculation-standard appendices, and the tende…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50860-2013 构筑物工程工程量计算规范DBJ51/T 040-2015 四川省工程建设项目招标代理操作规程2026-09-25