Work-item BOQ listing for pools/chimneys in structures works: GB 50860-2013 Table A.1 pools (070101) and Table A.6 chimneys (070106) — codes, characteristics, and measurement boundary rules
Pools per GB 50860-2013 Appendix A Table A.1 (code 070101) have 5 BOQ items (floor slab/wall/roof slab/internal columns/partition walls); chimneys per Table A.6 (070106) have 4 items (foundation/shaft/insulation/lining); concrete parts measured in m3 by design dimensions, without deducting reinforcement, embedded parts, and holes <= 0.3 m2 each; table-note boundary rules (wall-base-beam boundary, splayed footing, column capital/pedestal merging, shaft-seat attribution) must be executed verbatim; reinforcement borrows GB 50854 items; formwork per 4.2.7 chooses once per bid section between merging into concrete unit prices and separate preliminary items (m2).
Applicable Codes
- GB 50860-2013 · Code for Measurement of Quantities of Structures Works (Table A.1 池类070101、Table A.6 烟囱070106、第4.2.1条强制性条文、第4.2.7条、App. A.14.1/B.6.1)
- GB 50854-2013 · Code for Measurement of Quantities of Building and Decoration Works (钢筋项目借用)
- GB/T 50860-2024 · Standard for Measurement of Quantities of Structures Works (住建部公告2024年第191号,自2025-09-01实施,替代GB 50860-2013)
Topic Positioning
The complete method for setting up work-item BOQs for pools and chimneys in structures works under GB 50860-2013 "Code for measurement of structures works": item codes, characteristics, units, calculation rules and table-note boundary rules for Appendix A Table A.1 pools (070101) and Table A.6 chimneys (070106), plus companion handling of reinforcement (borrowing GB 50854) and the two formwork pricing modes.
Core Conclusions
General rule of BOQ compilation (4.2.1, mandatory): "The BOQ shall be compiled per the item codes, item names, item characteristics, measurement units, and measurement rules specified in the appendices." The five elements — code, name, characteristics, unit, quantity — are all indispensable in a work-item BOQ.
Pool -> Table A.1 pools (070101), 5 items:
Code Item Characteristics (must describe) Unit & rule 070101001 Pool floor slab Pool shape, depth; bedding type, thickness; concrete type; strength grade m3, by design dimensions, volume, no deduction of reinforcement, embedded parts, or holes <= 0.3 m2 each 070101002 Pool wall Pool shape, depth; concrete type; strength grade; wall thickness same 070101003 Pool roof slab Pool shape; slab type; concrete type; strength grade same 070101004 Pool internal column Concrete type; strength grade; column shape and section same 070101005 Pool partition wall Partition material type/spec; strength grade; wall thickness same (work content adds mortar making/transport, block laying and pointing)
Table A.1 note boundary rules (key to quantity take-off, execute verbatim): (1) pool shape means circular or square; (2) with a wall-base beam, take the beam bottom as the boundary — above is pool wall, below is floor slab; without one, a conical bottom counts to the slope top surface and the splayed footing at the wall's lower part goes into the floor slab volume; (3) for a flat-slab roof, the enlarged top of the wall goes into the roof slab; for a ribbed slab, primary and secondary beams go into the roof slab; for a spherical cap, bounded by the wall top surface, the side beams go into the roof slab; (4) internal column height runs from floor-slab top to roof-slab bottom; column capitals and pedestals merge into column volume.
- Chimney -> Table A.6 (070106), 4 items:
Code Item Characteristics Unit & rule 070106001 Chimney foundation Height; top inner diameter; foundation type; concrete type; grade m3 by design dimensions, no deduction of reinforcement, embedded parts, holes <= 0.3 m2; RC chimney foundation includes the base slab and shaft seat; above the shaft seat is the shaft wall 070106002 Chimney shaft wall Height; top inner diameter; concrete type; grade same 070106003 Chimney insulation Height; top inner diameter; insulation material type/spec m3 by design dimensions 070106004 Chimney lining Height; top inner diameter; lining material type/spec m3 by design dimensions
Table A.6 note: chimney height means the height from foundation top to shaft-wall top.
- Companion handling (easily missed): (1) Reinforcement is not listed here: Appendices A.14.1 and B.6.1 provide that "reinforcement works follow the relevant items of the current GB 50854" — borrow GB 50854's cast-in-place reinforcement items and list separately. (2) Formwork — two modes, choose one (4.2.7; unified per bid/contract section): mode 1, the tenderer does not list formwork separately — cast-in-place concrete work content includes formwork, its cost merged into the concrete unit price (concrete in m3); mode 2, list cast-in-place concrete formwork items under preliminary items (m2, separate unit price), and then concrete items exclude formwork. If the tenderer did not list formwork items in the bill of preliminaries, formwork is not separate and its cost is included in concrete unit prices.
Applicable Boundaries
- Applies to work-item BOQ compilation for concrete pools and chimneys in structures works (concrete structures per Appendix A; masonry structures per Appendix B tables).
- Boundary rules must follow the table notes verbatim — no self-devised member attribution (wall-base-beam boundary, splayed footing into floor slab, capitals/pedestals into columns, shaft seat into foundation), otherwise double counting or omissions follow.
- Distinction from neighboring items: long linear independent water-passing structures (drainage channels etc.) use channels (troughs) 070109, not pools 070101; internal or attached trenches in buildings use GB 50854 trench items (see referenced cards).
- Currency note: MOHURD Announcement No. 191 of 2024 approved GB/T 50860-2024, effective 2025-09-01, abolishing GB 50860-2013. This card is based on the 2013 text; new projects compiled after 2025-09-01 must use GB/T 50860-2024 and re-verify codes, characteristics, units and rules (the 2024 edition no longer contains mandatory provisions).
Further Reading
- GB 50860-2013 4.2.1 (mandatory), 4.2.7 (formwork dual track); Appendix A Table A.1 (070101 pools), Table A.6 (070106 chimneys); A.14.1, B.6.1 (reinforcement per GB 50854).
- Reinforcement details: GB 50854-2013 "cast-in-place reinforcement"; current editions are GB/T 50854-2024 and GB/T 50860-2024 (both effective 2025-09-01).
- Distinctions among pools 070101, channels 070109, building trenches 010507003, and structures vertical transport (per unit/volume) — see referenced cards.