BOQ item selection for cast-in-place concrete drainage ditches: structures channel (trough) 070109 vs structures pool 070101 vs building floor trench 010507003
A drainage ditch is a long, linear water-carrying structure — first exclude "structures pool" (070101 suits integral enclosed-wall structures like storage/water tanks and septic tanks); then choose by independence from buildings: an independent external channel (plant/site) -> GB/T 50860-2024 Appendix A.9 channel (trough) 070109 (subdivided into base slab / slab rebar / slab formwork); an internal or attached floor trench (workshop cable trench / equipment trench) -> GB 50854-2013 Table E.7 "cable trench, floor trench" 010507003 (measured in m by centerline length). Basis: the structures standard's note "channel (trough) means a channel or trough independent of and external to buildings".
Applicable Codes
- GB/T 50860-2024 构筑物工程工程量计算标准
- GB 50854-2013 房屋建筑与装饰工程工程量计算规范
Topic Positioning
BOQ item selection for cast-in-place concrete drainage ditches: deciding among structures channel (trough), structures pool, and building floor trench.
Core Conclusions
First exclude "structures pool" (070101): pools suit storage (oil) pools, sewage pools, septic tanks and other integral enclosed-wall structures; a drainage ditch is a long linear water-carrying structure — not a match. Then choose by independence from buildings: (1) Channels external to and independent of buildings (plant/site open or covered drainage channels) -> GB/T 50860-2024 Appendix A.9 channel (trough) 070109, subdivided into base slab, base-slab rebar, and base-slab formwork (m3, t, m2); (2) Internal or integral floor trenches (workshop cable trenches, equipment trenches, attached drainage ditches) -> GB 50854-2013 Table E.7 cable trench, floor trench 010507003, measured in m by centerline length. Basis: the structures standard's note "channel (trough) means a channel or trough independent of and external to buildings". The concrete base slabs, cover slabs, and sand filling of masonry channels (troughs) (070203) follow Appendix A.9.
Applicable Boundaries
Applies to linear water-carrying channels; enclosed-wall pools excluded. The current BOQ standard is the 2024 edition (the 2013 edition repealed): the 2024 edition splits channel (trough) into base slab/rebar/formwork sub-items, whereas the 2013 edition listed it integrally. Quota sub-items follow the current local quota volumes.
Further Reading
GB/T 50860-2024, Appendix A.9 Table A.9.1 (070109), Appendix A.1.1 (070101) Notes 1-4, Appendix B.3.1 (070203); GB 50854-2013, Table E.7 (010507003).