billed (BOQ) items
- 01
Three-dimensional cost analysis method for billed (BOQ) items: quantity, price, and fee (quantity recheck → price reasonableness → fee composition)
Split the cost of a single billed (BOQ) item into three independent dime…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准TB 10801-20242026-09-25 - 02
Composition and determination of the work content of quota sub-items / BOQ items: main processes + auxiliary content included by default, under "unlisted not separately counted, auxiliary must be included, processes not split"
The work content of a quota sub-item = the listed main construction proc…
GB/T 50860-2024 构筑物工程工程量计算标准GB/T 50857-2024 市政工程工程量计算标准GB 50860-2013 构筑物工程工程量计算规范2026-09-25 - 03
Classifying BOQ items suited to high vs low pricing in unbalanced bidding, and the three-dimensional decision logic
Whether to bid high on an item turns on three dimensions: early-stage it…
GB/T 50500-2024 建设工程工程量清单计价标准工程建设项目施工招标投标办法(30号令)DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 04
BOQ item selection for cast-in-place concrete drainage ditches: structures channel (trough) 070109 vs structures pool 070101 vs building floor trench 010507003
A drainage ditch is a long, linear water-carrying structure — first excl…
GB/T 50860-2024 构筑物工程工程量计算标准GB 50854-2013 房屋建筑与装饰工程工程量计算规范2026-09-25