Preparing supplementary quota items (supplementary unit-rate build-up schedules): trigger conditions, consumption measurement, base price composition, industry approval, and distinction from supplementary BOQ items
Where the budget quota norms do not cover a work item and no similar sub-item can be applied, prepare a supplementary unit-rate build-up schedule per the compilation principles and methods of the budget quota norms (supplementation is the last resort — prefer adjusted application of existing quotas or similar quota items first; the power industry requires approval by the quota administration; railway supplementary unit-price analyses are copied to the industry standards administration, and passenger station buildings etc. may adopt provincial local quota norms instead). Labour consumption = basic labour + extra-haulage labour + auxiliary labour + labour margin, measured by work-study recording / time measurement; materials = net quantity × (1 + wastage rate), turnover materials by amortized quantity; base price = labour cost + material cost + machinery cost, with management fee, profit, statutory levies and fees, and taxes added for the all-in unit rate. A missing BOQ item is a listing-level matter: supplementary item codes use the standard code + B + three digits (e.g., from 07B001) and are filed with the provincial administration.
Applicable Codes
- GB/T 51095-2015 建设工程造价咨询规范
- DL/T 5468-2013 输变电工程施工图预算编制导则
- DL/T 5591-2021 配电网工程建设预算编制导则
- TB 10801-2024 铁路基本建设工程设计概(预)算编制办法
- DB11/T 2382-2024 建设工程施工消耗量标准
- GB 50860-2013 构筑物工程工程量计算规范
- GB/T 50875-2013 工程造价术语标准
Topic Positioning
The complete workflow for preparing a supplementary quota item (supplementary unit-rate build-up schedule) where the budget quota norms do not cover a work item: trigger conditions and priority, compilation principles, measurement of labour/material/machinery consumption, base price and all-in unit rate composition, industry approval procedures, and the distinction from supplementary BOQ items.
Core Conclusions
① Trigger and priority: prepare a supplementary unit-rate build-up schedule only where the budget quota norms do not cover the item (GB/T 51095-2015 Clause 5.3.12). Supplementation is the last resort — first apply existing quotas adjusted for technical-condition differences, then apply similar-process quotas (the power industry prefers power quotas → other industry or local quotas, DL/T 5591-2021 Clause 4.1.10), compile from construction-drawing based budgets (pre-tender estimates) / settlement data of similar works, and only where no data exist compile per the works' specific technical conditions — in all cases per the quota compilation administration provisions and subject to approval by the industry quota administration (DL/T 5468-2013 Clause 4.1.4). ② Compilation principles: follow the budget quota norms' principles and methods (normal construction conditions, reasonable project execution plan (construction methodology and site organization)); item division, work content, and units of measurement consistent with the same volume; deliverable is the supplementary unit-rate build-up schedule (GB/T 51095-2015 Appendix C, Table C.0.11). ③ Labour consumption = basic labour + extra-haulage labour + auxiliary labour + labour margin, on the 8-hour workday, collected on site by work-study recording / time measurement, finalized after gross-error identification, adjustment coefficients, and random-error treatment (DB11/T 2382-2024 Clause 3.2). ④ Material consumption: main/auxiliary materials = net quantity × (1 + wastage rate), wastage covering transport, processing, operation, and storage losses (DB11/T 2382-2024 Clause 3.3); turnover materials by amortized quantity; incidental materials as a percentage of material cost. ⑤ Base price = labour cost + material cost + machinery cost; the all-in unit rate additionally includes management fee, profit, statutory levies and fees, and taxes (GB/T 51095-2015 Clause 5.3.9).
Applicable Boundaries
Applies to consumption measurement of conventional-process items not covered by the budget / preliminary estimate quota norms; where existing quotas can be applied with adjustment, do not supplement (adjust and apply first); consumption must be supported by field measurement or reliable data — experience-based guesses are not acceptable. Railway specifics: passenger station buildings, station complexes, canopies, and footbridges may adopt the provincial local quota norms of the works location, with labour/material/machinery prices and norms for on-costs and expenses adopted in matching sets (TB 10801-2024 Clause 2.4.2); railway supplementary unit-price analyses are copied to the industry standards administration (Clause 2.4.3). Note the distinction: a missing BOQ item is a listing-level matter — supplementary items are coded as standard code + B + three digits (structures from 07B001, no duplicate codes), with name, item description (work item specification), unit of measurement, method of measurement, and work content attached, filed with the provincial or industry cost administration (GB 50860-2013 Clause 4.1.3) — not the same thing as a supplementary quota item at the rate build-up level.
Further Reading
See GB/T 51095-2015 Clauses 5.3.12, 5.3.9 and Appendix C Table C.0.11; GB/T 50875-2013 Section 2.3 (labour/material consumption definitions); DL/T 5468-2013 Clauses 4.1.4, 4.1.12; DL/T 5591-2021 Clause 4.1.10; DB11/T 2382-2024 Clauses 3.2, 3.3; TB 10801-2024 Section 2.4; GB 50860-2013 Clause 4.1.3.
Keywords
Cited By
- ←
Data-taking rules of earthwork and rockwork budget quotas: classifying trenches and pits against general earthwork, classifying dry and wet soil, muck and frozen soil, items already comprehensively included in the quota and not adjustable, determination and successive-multiplication rules for efficiency-reduction conversion coefficients (wet soil, excavation within shoring, excavation between piles, local deepening, deep excavation, vertical soil transport, dynamically compacted ground, etc.), uphill-haul efficiency reduction and allowable over-excavation, and dewatering and shoring to be calculated separately
Earthwork quota data-taking starts with three preliminary steps: (1) classify trench or pit (base width up to 7 m and base length over 3 times the base width, or base length up to 3 times the base width and base area up to 150 m2 - beyond these limits, and not being site levelling, it is general earthwork); (2) split dry and wet soil at the normal groundwater level given in the geological survey data - where dewatering is adopted, the post-dewatering level is the normal water level and dewatering costs are calculated separately; (3) first remove items already comprehensively included and not adjustable (machine excavation already includes manual cleaning of residual layers up to 0.30 m thick on base and slopes, efficiency reduction for loaded uphill hauls at gradients up to 15%, and pipe laying already includes ordinary trench-side shoring). Efficiency reductions then follow the quota coefficients: wet soil by hand labour x1.18; wet soil by machine labour and machines x1.15; hand-dug trenches and pits within shoring x1.43 on labour; soil between piles x1.25 on labour under hand quotas (x1.10 on labour and machines under machine quotas); locally deepened trenches and pits x1.25 on labour and machines; vertical soil transport by hand x1.50; excavation on dynamically compacted ground x1.15; hand excavation beyond 6 m x1.15 per additional metre; where two coefficients coexist they are multiplied successively. Coefficients are taken from the notes of the quota volume actually applied and must not be mixed across volumes.
- ←
Selecting quota items for TDF (integral thin-sheet-steel flange) ducts and treating the fabrication part: dedicated items first, borrowing and conversion rules where none exist, the main-material treatment of corner clips and spring clips, and the cost-gap make-up against angle-steel flanges
TDF ducts take the dedicated 'TDF duct fabrication and erection' items first (DB11/T 2382-2024 Table C.7.16, C7-2-87~C7-2-91, per m2, work content already including 'fitting corner clips and spring clips', fabrication and erection in one) - the fabrication part is never borrowed out. Systems without dedicated items run the like flanged-duct items per the volume notes (SJG 111.3-2022 clause 4.1.7 note 8: 'where flange-less connection items are used, no adjustment'), never self-applied experience factors; conversion factors come only from the notes' express text (tapered uniform-supply ducts labour x 2.50, air-curtain ducts labour x 3.00, curved ducts labour and materials x 1.12); true gaps borrow from similar processes with a paper trail or compile supplementary unit-rate build-up schedules for approval. Ducts, valves, diffusers and other main materials list in brackets, never as the base of sundry-material rates.
- ←
Quota application for the erection cost of vertical storage tanks (metal oil tanks) built by the reverse jack-up method with hydraulic lifting: line-item selection by construction form and capacity class, measurement by shell metal weight in t, lifting gear and temporary stiffening to preliminaries, and NDT and the water filling test charged separately
The reverse jack-up method has no standalone line item in the erection consumption quota: the item is selected by 'tank type x shell construction form (lap-jointed / butt-jointed) x capacity class' and measured by shell metal weight in t (no deduction for the area of openings in the shell, and including bottom plates, shell plates, roof plates, curb angle, stiffening rings, wind girders, and shim and reinforcement plates); where only one tank is built on one site, labour and plant consumption is multiplied by 1.25 (materials not). Neither the plant schedule nor the work content of the items contains a lifting step, so the hydraulic lifting devices and the temporary stiffening of the reverse method are charged as preliminaries; the work content stops at 'leak testing' - shell weld NDT, the water filling test and foundation settlement monitoring are outside the items and must be listed separately.
- ←
Determining missing items not listed in the BOQ appendices and setting supplementary items: the three-element comparison search path, the discipline-code + B coding rule (from 01B001), the five required accompanying elements, the tender-document explanation / filing requirements, and the boundary of error when fitting near-match items
Under GB/T 50854-2024 Clause 4.1.4, for items not covered in Appendices A~R the compiler may add supplementary items, coded with this standard's code 01 plus B and three Arabic numerals, numbered sequentially from 01B001, and must attach the item name, item description, unit of measurement, quantity take-off rule and work content (for preliminaries that cannot be measured: name, work content and scope of inclusion). The determination is a three-element comparison (item description + work content + unit of measurement with calculation rule): so long as any element can be carried by an existing appendix item, the existing item must be applied forward and the difference expressed in the item description, and no supplementary code may be created; work content lists only principal operations, auxiliary content such as plant movement and material transport is deemed included, and operations may not be split out and listed separately unless specifically stated. The 2024 editions (GB/T series) say 'may add' and no longer require filing; instead GB/T 50500-2024 Clause 3.1.3 requires the supplementary basis to be explained in the tender and contract documents; the 2013 compulsory national standards required 'shall add + file with the provincial or industry construction cost administration institution', and local standards may still retain the filing requirement.
- ←
Re-derivation of the all-in unit rate when a changed construction method makes the quota machine-shift consumption inapplicable: the three-path quota conversion test, the hierarchy of bases for recalculating plant consumption, the requirements for recasting the all-in unit rate analysis sheet, and the procedure for confirmation by the employer
Changes of construction method and plant usage are factors expressly listed in GB/T 50500-2024 Clause 8.9.1 as changes of item description or construction condition that can trigger adjustment of the all-in unit rate, but conversion must step down level by level: a conversion line item within the same chapter (DL/T 5468-2013 Clause 4.1.4 item 1: 'where the technical conditions prescribed by the quota (index) differ materially from the actual conditions of the works, the applicable quota (index) may be adjusted and applied according to the technical conditions of the works and the provisions of the quota') -> an express quota coefficient -> borrowing a similar process -> building up a rate from supplementary consumption (GB/T 51095-2015 Clause 5.3.12; TB 10801-2024 Clause 2.4.3); with no express coefficient, none may be invented. The hierarchy for recalculating machine-shift consumption is: contractor's in-house norms (GB/T 50875-2013 Clause 2.3.3) -> construction quotas (Clause 2.3.5) -> budgets or final accounts of similar works, or site measurement records certified by both parties (DL/T 5468-2013 Clause 4.1.4 item 2). After conversion, the all-in unit rate analysis sheet must be recast (GB/T 51095-2015 Clause 5.3.9; GB/T 50500-2024 Clause 6.2.12 and Annex E Table E.2.2-1) and submitted to the employer under the 'submission, checking, review, re-examination and confirmation' procedure (Clauses 8.1.2 and 8.1.3; for additional works, the project execution plan or implementation scheme and the priced offer must also be submitted before execution, Clause 8.10.2). The original quota line item must never be applied in departure from the approved construction scheme.
- ←
Fixing the number of amortisation cycles for turnover steel in excavation retention works - steel struts, steel wales, inserted H sections - and the pricing deduction basis where 'the quota amortises but the site hires'
The steel member material consumption of struts and inserted / extracted H sections is fixed from the design drawings first; absent a design requirement it may be measured on 4 amortisation cycles (DB11/T 2382-2024 clauses 4.3.15, 4.3.6). In Appendix item A-2-52 the strut quantity 270.0000 kg/t is the amortised amount, and the removal item A-2-53 carries no turnover material; where the site hires instead, per the Jiangsu 2026 basis the corresponding amortised quantity is deducted from the item and the hire priced separately - amortisation quantity and hire fee are never taken together.
- ←
The twelve-digit rule for BOQ item codes: digits 1-9 unified per the appendices, digits 10-12 set by the compiler, the 01B supplementary code for gaps, the duplicate-check scope, and 2013 versus 2024 differences
BOQ item codes are twelve Arabic digits in five levels: discipline code (1-2), appendix class code (3-4), section code (5-6), work-item code (7-9), item-name code (10-12). Digits 1-9 must follow the appendices (national, no self-coding); 10-12 are set by the compiler from the item name and item description and may not duplicate within the same tendered works (GB 50854-2013 clause 4.2.2, mandatory; GB/T 50854-2024 clause 4.2.2 narrows to 'within the same single project of the tendered works'). Items absent from the appendices take supplementary codes 01B + three digits from 01B001 (the 2013 edition required filing with the provincial or industry cost authority; 2024 no longer requires it).
- ←
Pricing when design sizes exceed the top band of budget quota items (quota gap / over-range): over-range is a gap, not a conversion; proportional extrapolation is banned; four steps - express note, top band, borrowing similar-workmanship quotas, supplementary build-up for approval
Design sizes above the quota's top band are a quota gap, not a quota conversion: no linear extrapolation by diameter, section area or capacity, and no self-invented unfounded coefficients (review reads up-rating). Order: 1 check the volume / chapter notes for express over-range provisions and follow them (e.g. stated adjustment coefficients); 2 absent them, the top band is the ceiling - apply it and record the design difference honestly in the notes, no equivalent-quantity conversion or self-set coefficients; 3 borrow similar-workmanship quotas (cross-volume / discipline / region allowed), listing the borrowing basis, charging following the borrowed volume's rules; 4 compile a supplementary unit-rate build-up per quota compilation principles and submit for approval (GB/T 51095-2015 Article 5.3.12; DL/T 5468-2013 Article 4.1.4). Sizes below the bottom band likewise bar interpolation.
- ←
Amortisation formulas for formwork and turnover materials: the three railway-quota bases and the traditional turnover-use / recovery / make-up-rate basis
Per TB/T 10821-2024 Chapter 9, three classes: 1 steel formwork, timber and other track materials - per-use amortisation = first-use quantity / amortisation cycles; 2 combined-steel-formwork fittings and supports, plastic formwork and metal materials - per-use amortisation = first-use quantity / amortisation cycles + first-use quantity x site handling and operation wastage rate; 3 metal members and piping, rails and turnouts - amortisation = total used mass x per-erection loss rate + total used mass x annual charge rate x years of use (part-quarters rounding up to a quarter). The traditional basis computes separately: turnover use = first-use quantity x [1 + (cycles - 1) x make-up rate] / cycles; recovery = first-use quantity x (1 - make-up rate) / cycles; amortisation = turnover use - recovery x recovery discount rate.
- ←
Quota pricing route for micro-disturbance cement mixing piles (IMS piles): workmanship classification, quota-gap determination and cement-content conversion
Micro-disturbance cement mixing piles (IMS piles) are a workmanship variant of deep cement mixing piles (T/ZS 0141-2020 Article 2.1.1); pricing lands in the deep cement mixing pile items of the ground-treatment chapter, not a new pile type; because the rig and workmanship parameters differ from conventional triaxial practice (high-pressure air-assisted cutting shall not be used; dedicated combined augers), triaxial items cannot be casually applied, nor pin-type items misattributed - where no matching item exists, treat as a quota gap (first adapt the nearest similar workmanship, else compile a supplementary unit-rate build-up schedule on quota principles for approval); where the cement content differs from the quota basis, stack the per-additional-1%-cement or plus-minus-5-kg/m adjustment items instead of editing consumptions directly.
- ←
Choosing the pricing route and item attribution for electrical handholes / manholes under quotas (power cable chambers, street-lighting pull pits, telecom manholes / handholes, precast vs cast-in-place)
Pricing a cable working chamber first chooses between two routes: (1) whole-chamber comprehensive items (unit per chamber, work content covering the base, masonry or casting, rendered and waterproofed walls, covers and frames, even pit excavation and backfill outside - no further sub-items covered by them); (2) split combined items (blinding / masonry base / formwork / rendering / cover fabrication and installation / cover and seat listed separately, units m3 / m2 / set). Power (electric cable) chambers go to the power / cable line chapters (e.g. TB/T 10829-2024 Volume 8 DY-341 to DY-349 cable manhole fabrication); street-lighting pull pits and telecom manholes / handholes go to the telecommunications / ducting chapters (e.g. TB/T 10826-2024 Volume 5 TY-60 to TY-69 masonry manholes / handholes). Whether precast concrete chambers can be applied depends on the item's workmanship: DB11/T 2382-2024 Table F.1.5-2.3 standard concrete cable chambers is a cast-in-place work content and cannot be applied as precast; precast members and shafts are measured by volume / length per Articles 7.4.15 / 7.4.16, and where no precast chamber item exists it is a gap requiring a supplementary quota and approval.
- ←
Splitting rules for applying consumption items to framed partitions: framing and boards set apart, infills charged separately as insulation, double-faced boards doubled, fire rating never a selection basis (Beijing DB11/T 2382-2024 chapter 4.13 and Annex A.12)
Applying consumption items to fire rock-wool board partitions turns on the build-up and board type, never the fire rating (no "fire partition" subject exists; fire endurance is a design requirement): framed partitions itemise framing and boards separately per DB11/T 2382-2024 clause 4.13.16 item 2; rock-wool and like infills sit outside the partition items per 4.13.20 and execute under 4.11.1 to 4.11.10 (insulation); boards are determined per face, doubled where two-faced, per 4.13.16 item 3; partition quantities per 4.13.27 compute on the frame envelope area without deducting single holes of 0.30 m2 or less.
- ←
Wall and column plaster items in TB/T 10831-2024 Railway Works Budget Quota Manual Volume 10 (building works) - general plaster FY-1346 to 1358, decorative plaster FY-1359 to 1376 - the missing wall levelling screed, and plaster measurement rules
Volume 10 "section 2 wall and column works" sets only (1) general plaster (FY-1346 to FY-1358) and (2) decorative plaster (FY-1359 to FY-1376) - no standalone "wall levelling screed" item; general plaster content already includes "multi-coat levelling and finish trowelling", and only decorative backing runs on FY-1374 "decorative plaster, backing and levelling, 15 thick". Levelling a wall with no finish is a quota gap - never borrow FY-1189 to FY-1193 floor levelling screeds or roof screeds (position, process and measurement all differ).
- ←
Pricing归属 of foundation probing (rod probing/tamping) in Beijing: already综合 in the manual-excavation item work contents, not itemized separately
Beijing DB11/T 2382-2024, 4.2.2: "manual excavation consumption is determined by soil class and shall include rod probing and bottom tamping" — foundation probing has no separate item; it is priced with the manual digging/pit items by soil class; with machine digging, hand trimming of the base (300mm where design is silent) uses the manual items, probing included (4.2.2(3), 4.2.15(2)). On the BOQ side, GB/T 50854-2024 makes base probing a "base treatment method" characteristic description, not a standalone code. Genuine separate listing (e.g., subcontract caliber) is a missing item — compile a supplementary unit-price estimate and guard against double pricing with the manual digging items.
- ←
Handling specifications beyond a quota item's largest step (over the top band): no proportional extrapolation - a four-step ladder of volume-note wording first, analogous items next, supplementary quota last
A specification over the top band is a "quota gap", not a "quota conversion" - conversion stands only where the quota text expressly allows it; beyond the largest step no band exists, and extrapolation by capacity ratio or diameter ratio, or "unsupported coefficients", is strictly barred (that is over- and mis-application). The correct order: (1) check the volume / chapter notes for express wording (execute under another volume or discipline; multiply the stated coefficient beyond stated conditions; execute under same-class items for other types / bands); (2) take the band within - never extrapolate; (3) borrow analogous construction-process quotas (across volumes or sectors / regions, listing the basis and taking on-costs per the borrowed volume); (4) with nothing analogous, compile a supplementary unit-rate build-up schedule and obtain approval / file it (power requires approval of the quota authority; railway files with the sector standard authority and may substitute provincial local quotas).
- ←
Quota application for tile-and-stone grout sealing on floors: the tiling items' work content ends at joint wiping and pointing, excluding grout sealing - it needs its own item; the grout item is chosen in three steps: dedicated item first, then a tile-finish table item carrying sealant consumption, else a supplementary quota or market rate build-up
The work content of tiling items ends at "joint wiping / pointing" (cement slurry or jointing compound fill) and excludes grout sealing; two-component sealants and epoxy coloured sand are separate workings needing separate items or description in the bill item descriptions. Choose the grout item in three steps: (1) where the region has a dedicated "grout sealing" item, apply it (e.g. Hunan 2024 (2025 edition in the source data) A11-200 tile grout sealing, m2); (2) else where the tile-finish table holds an item with sealant consumption, apply that (e.g. Beijing DB11/T 2382-2024 A-11-67: all-in labour Grade I 0.0240 workday/m2, two-component sealant 400 ml 0.1040 set/m2, other materials 1.5%, plant 2%, unit m2); (3) else compile a supplementary quota or build up from market labour and materials, confirmed by the employer / quota authority. Red lines: tiling items already contain wiping / pointing - never add a pointing item on top; never over-apply movement-joint caulking or curtain-wall silicone items.
- ←
Deciding the quota items for pre-laid bond waterproof sheets: taking foundation sheet waterproofing under Beijing DB11/T 2382-2024 as the example, separating the "pre-laying method" items from the "torch-on method" items by construction process, with item work content, consumption and the companion measurement rules
Pre-laid bond (polymer self-adhesive film sheets) takes the "pre-laying method" items: Beijing DB11/T 2382-2024 foundation sheet waterproofing A-9-243 (HDPE self-adhesive film sheet, pre-laying, raft single layer, all-in labour Grade II 0.0630 workday/m2, HDPE film waterproof sheet 1.2 mm 1.3760 m2/m2) and A-9-244 (flat slab single layer, labour 0.0600 workday/m2, sheet 1.2510 m2/m2); the torch-on items must not be used. Basis: DB11/T 2382-2024 clause 4.10.8 "sheet waterproofing shall be itemised and determined by construction process"; the commentary to GB/T 51310-2018 clause 16.3.2 states plainly "cold-applied self-adhesive sheets must not be laid by the torch-on method".
- ←
Quota application and material attribution for stone-plastic composite (SPC) elevator door linings: classify by material into plastic decorative materials, take the finished door-and-window lining item with the main material swapped, or take the plastic decorative moulding and plastic decorative board finish items per the site detail
Stone-plastic composite (SPC - SPC boards, SPC mouldings) is a man-made composite finish material extruded from PVC resin and stone powder, belonging to the "plastic decorative materials" class - neither stone nor ceramic tile. It must not take the stone door-and-window lining items (e.g. Beijing DB11/T 2382-2024 Annex A table A.8.8, A-8-66 "door and window linings, stone", whose main material is locked to "finished stone 20 mm") nor the tile-finish items; the iron rule is "classify by the actual material, not by the stone-like pattern or the word 'stone' in the name". Current quotas carry no standalone "stone-plastic" item (absent in Beijing 2024, railway TB/T 10831-2024 Volume 10 and Hunan 2025) - a new-material gap: apply the item with "same process, similar material" and swap the main material (marking the conversion "converted"); where nothing is analogous, compile a supplementary unit-rate build-up schedule for approval. Finished SPC door linings take the "door and window linings" finished-set installation item (e.g. Beijing A-8-64, 0.0770 workday/m2 + finished timber door lining 1.000 m2/m2), swapping the finished timber lining for the finished SPC lining; moulding assembly takes the decorative moulding items (railway FY-1949 to FY-1957 plastic decorative mouldings); board adhesion takes the plastic decorative board finish items (Beijing A-12-176). Quantities by developed area at design-shown dimensions (Beijing 4.9.12; railway Volume 10 volume notes IX.7).
- ←
Determining wastage rates of decoration materials: the quota back-calculation formula, value-determination paths, and typical values (stone/tiles/wood veneer)
Wastage rate = (norm resource consumption − net quantity) ÷ net quantity; budget preparation directly applies the norm resource consumption (already including on-site handling and operation wastage, no further addition), while material preparation/procurement separately counts net quantity x (1 + wastage rate). Typical values: wet-laid stone and tiles about 2%, dry-hung stone 2%~5% (when measured by frame peripheral area the consumption can be below 1), wood veneer panels 5%~11%. Values are governed by the current quota line items of the executing region.
- ←
Whether conversion is allowed when the actual construction process differs from the quota norms: general principle, permitted situations, prohibited red lines, and the step-down path for missing items
General principle: quota norms are compiled on the basis of a rational project execution plan (construction methodology and site organization) and normal conditions; except where the quota norms expressly allow conversion, no change to the quota norms is permitted because the project execution plan, operating method, or material consumption differs from the quota norms (DB63/T 2013-2022 Clause 5.5). Permitted conversions require express written rules (strength grades per mix-ratio tables; dry-to-wet mortar at 1.75 t + 0.3 m3 water = approx. 1.0 m3 wet mix plus deduction of the tank mixer shift; fair-faced wall labour cost coefficients 1.15/1.30; admixtures counted separately; ready-mixed concrete deducts the mixing equipment); different mix ratios, cement types, or machinery types/specifications are never convertible. Where conversion is impossible, step down: adjusted application -> quota of similar processes -> compiling a supplementary quota item submitted for approval.
- ←
How to build up rates for additional works with no applicable quota norms: the progressive path of apply → convert → cost-plus-profit → market price enquiry
For additional works or variation items with no quota norms to apply, rate build-up follows the progression "identical items use the contract unit rate → similar items are converted and adjusted → quota norms for similar technology are adjusted in applying quota items, or supplementary quota items are compiled → rates are re-derived on a cost-plus-profit basis → confirmed by market price enquiry → a supplementary agreement is negotiated and signed by both parties"; the order of price sources is contract-agreed information sources → published price information (government guidance prices) issued by the construction cost administration or industry bodies (tax-exclusive) → contractor procurement unit prices confirmed by both parties; additional works are works outside the contract and are not necessarily bound by the original contract unit rates — submit for review before implementation, with the contractor bearing the burden of proof.
- ←
BOQ and quota item selection for compact package unit substations (prefabricated substations): the mainstream principle of billing the complete unit per set; splitting into transformer plus HV/LV panels only for non-package supply, missing quota bands or contract-required splits; with commissioning and handover-test interfaces and a Beijing / Shenzhen / railway / national-standard comparison
For package unit substations (compact / prefabricated substations) the principle is to bill the complete unit: apply one installation item per set by capacity band, the work content already covering positioning, wiring and checking, earthing and individual commissioning, with no split into transformer plus HV/LV panels; only non-package supply, missing quota bands or contract-required splits justify splitting, split and unsplit being mutually exclusive with strictly no double counting of included content. Beijing DB11/T 2382-2024 clause 6.4.19 (one container body counts as one unit), Shenzhen SJG 181.7-2024 (measured per set) and GB/T 50856-2024 (switchgear installation 030402 covers prefabricated substations; clause 3.0.11 - equipment installation includes commissioning of the equipment itself) are consistent; railway TB/T 10829-2024 splits installation (DY-1074 to DY-1084) and commissioning (DY-1407 to DY-1410) into two items per unit, likewise without splitting the body.
- ←
Building the contractor's in-house norms and actual-consumption databases: division of labour between the two databases, the consumption fact-table model, and the self-growth loop
The contractor's in-house norms database and the actual-consumption database have a "finished product - raw material" relationship: first collect real actual consumption per the consumption fact table (project identifier + process granularity + labour/material/machinery detail + time + source + comparison against budget quantities), then refine it into the contractor's in-house norms through sample cleaning and statistics, for use in tender (priced offer) and cost management; relying on smart-site automatic collection, a "collect -> refine -> apply -> review" self-growth loop forms; the two calibres — quota line item content (content per quota unit) and BOQ actual consumption (not divided by quantity) — must never be confused.
- ←
Bases, procedure, and content elements for preparing construction material procurement plans (GB/T 50430-2017, GB/T 50326-2017)
Procurement plans are prepared on the bases of the design documents, current national standards, and the construction contract, following the four-step flow "demand plan → inventory offsetting → procurement plan → approval and implementation"; the content must include five elements: work scope, procurement information, inspection methods, supplier qualification review, and control targets; total material quantities are allocated per the master construction schedule (GB/T 50502-2009, Clause 4.4.5), delivering materials on demand with rolling adjustment as progress advances.
- ←
Handling path for missing quota items: similar-process application -> compilation from similar-project data -> compilation from technical conditions -> approval/filing (including power and railway industry differences)
Missing quota items are handled in step-down order: (1) preferentially refer to quotas of similar construction processes (power first refers to similar power quotas, then cross-industry/local ones with matching fee standards); (2) with no similar sub-item but similar-project budget/settlement data available, compile the supplementary quota therefrom; (3) with no data, compile per the project's specific technical conditions; (4) submit the supplementary quota to the quota administration agency for approval before use; in railway, file a copy with the industry standard administration agency. Railway passenger station buildings, canopies, and overpasses may borrow the provincial local quota at the project location with matching fee standards. Unapproved supplementary quotas do not stand in settlement and audit.
- ←
Composition and determination of the work content of quota sub-items / BOQ items: main processes + auxiliary content included by default, under "unlisted not separately counted, auxiliary must be included, processes not split"
The work content of a quota sub-item = the listed main construction processes + auxiliary content included by default (machinery movement, material transport, etc.), executing the three rules "unlisted not separately counted, auxiliary must be included, processes not split"; items considered as finished products include the fabrication content when precast on site; the work content boundary corresponds one-to-one with the composition of labor consumption (basic labor / auxiliary labor / over-transport-distance labor / labor differential allowance).
- ←
Applying quotas to highway signs and pavement markings: composition of sub-items 5-1-4 signs and 5-1-5 pavement markings, quantity rules, and finished-price points (JTG/T 3832-2018 Part 5)
For highway signs apply 5-1-4 signs (steel-plate signs split by single-post/double-post/single-cantilever/double-cantilever/gantry, each further split into post and panel sub-items, priced at finished-product rates excluding reflective sheeting); for markings apply 5-1-5 pavement markings (ordinary, hot-melt, rumble, two-component markings, colored surfacing, reflective road studs, rubber speed humps, etc.). Metal sign posts and panels are each computed by total mass; pavement markings by net marked area.
- ←
Determining quota material consumption: net quantity + loss composition, determination by four material classes, and the construction consumption formula
Material consumption = net quantity + unavoidable wastage (including transport, processing, operating and storage wastage); main and auxiliary materials per net quantity × (1 + wastage rate); turnaround materials per amortized quantity (one-time use ÷ number of reuses (amortization cycles)) or rental quantity; sundry low-value materials estimated as a proportion of material cost; data collected by field observation, with gross errors rejected and random errors averaged. Based on GB/T 50875-2013, DB11/T 2382-2024 §3.3, TB/T 10821-2024.
- ←
Checklist of permitted quota-conversion situations and prohibited red lines: when conversion is allowed and how to convert
Quota conversion takes "express permission in the quota provisions" as the sole premise (DB63/T 2013-2022 §5.5): only prescribed situations may be converted — strength grades per mix-ratio tables; stabilized-soil base mix ratios per Ci=[Cd+Bd×(H−H0)]×Li/Ld; compaction thickness over the limit with layered machinery shifts ×2.0; dry/wet mortar interchange (1.75 t dry mix + 0.3 m3 water ≈ 1 m3 wet mix); labor coefficients for structural differences such as fair-faced walls/arcs/extra height; supply modes such as ready-mixed concrete/centralized mixing; admixtures counted separately; missing items compiled as supplementary quotas submitted for approval. Actual mix ratios (unless the notes allow), cement types, and machinery types/specifications are never convertible; after conversion, mark the item number with "converted" for traceability.
- ←
Determination of the loose-laying coefficient (compaction coefficient) and the paving wastage rate of asphalt mixtures
The loose-laying coefficient (= loose-laying thickness / compacted thickness) is a construction control parameter, preferably determined by a trial section; without data, machine-paved asphalt concrete takes 1.15~1.35 and hand-laid 1.25~1.50; the wastage rate (= (norm resource consumption - net quantity) / net quantity) is a pricing/stockpiling parameter — for pricing, norm resource consumption already includes paving wastage, so apply the quota item directly on design area x compacted thickness without adding further wastage; only stockpiling/procurement multiplies by the wastage rate (generally 1%~3%).
- ←
Railway 2024 quotas — erecting concrete poles: item selection by pole type + pole height (TB/T 10829-2024 Volume 8 power works, DY-25~DY-35)
In TB/T 10829-2024 Volume 8, Chapter 1 overhead power lines, Section 2 pole and tower erection, concrete poles step by "pole type (tapered / uniform-diameter / strut) + pole height" (DY-25~DY-35), not by weight; quantities per design count in "poles". Pole main-material consumptions are bracketed — items carry no material cost or weight; book main materials separately per design. Heights beyond the steps (tapered >18 m, uniform-diameter >21 m) have no item — handle by the supplementary-quota procedure.
- ←
Decision path for selecting quota line items: item description matching -> direct application -> adjusted application -> similar construction process -> supplementary quota item submitted for approval
Applying a quota line item starts with matching "item description (work item specification) + work content": where fully consistent, apply directly (labour/material/machinery consumption taken from the line item, prices taken as market prices at the compilation date, on-costs per the matching norms for on-costs and expenses); where technical conditions differ greatly, apply with adjustment per the quota provisions; for missing items, preferentially refer to quota norms for similar construction processes (cross-industry/local allowed); where no reference exists, compile a supplementary quota item per the project's technical conditions and submit it to the quota administration agency for approval. Red lines: applying a higher-grade quota item and splitting processes for double counting are prohibited.
- ←
How a contractor builds its own labour, material and machinery consumption database: three-level structure, data sources, error handling and self-growth
Per T/ZBD 100.1-2022, a contractor's consumption database is organised as a three-level tree — specialty works → work sections/work-section items → work items (process level) — with each node recording the all-in unit rate + labour/material/machinery consumption + factor prices; labour consumption is measured on site by work-study recording / time measurement (basic + extra-haulage + auxiliary labour + margin); materials are back-derived by the four-quantity ledger check (actual consumption = opening stock + deliveries − closing stock − returns − scrap recovery) or net quantity × (1 + wastage rate); machinery by machine-shift operation records (actual machine-shifts = quantity ÷ actual output per machine-shift); data are hierarchically aggregated → gross errors removed → adjustment coefficients applied → random errors averaged, then calibrated against local quota norms, moving towards self-growth through automated collection on smart construction sites.
- ←
Rules when quota plant differs from the plant actually used on site: machine-shift consumption locked, adjustment for price differentials, and three legitimate paths
Where the type or specification of plant differs from that actually used in construction, the machine-shift consumption (quantity) is locked and no conversion is permitted — higher or lower actual plant efficiency is no ground for adjusting the quantity; the only permissible routes are three: (1) plant adjustments expressly laid down in the quota norms (e.g. layered compaction machine-shifts x 2.0, dry-mixed to wet-mixed mortar deducting mixer machine-shifts, switching to ready-mixed concrete deducting batching-plant machine-shifts); (2) where technical conditions differ materially, adapting and applying a similar quota; (3) where the machine-shift cost quota does not cover the item, compiling a supplementary machine-shift cost quota. Price differences are dealt with through adjustment for price differentials, with the quantity untouched: plant usage cost differential = quota machine-shift consumption x (machine-shift rate per machine-shift at the compilation date - machine-shift rate per machine-shift at the base date).
- ←
Market-inquiry pricing when no applicable quota exists: the two-step method (multi-source inquiry → labor/material/machinery pricing) and traceability/audit requirements
A missing quota does not mean missing pricing rules: the all-in unit rate structure (labor/materials/machinery + management fee + profit + statutory fees + taxes) stays unchanged, with labor/material/machinery prices obtained instead from multi-channel market inquiries (online platforms / telephone / site visits / similar-project benchmarks), and consumption referenced from similar quotas with correction, manufacturer technical parameters, or field measurement. Inquiries must be multi-source and benchmarked, consistent with design parameters, and must not directly pick published prices; records are countersigned and a ledger kept; fees still accrue per the fee standards. The priority of price bases is contract agreement > price confirmed by both parties > published price > market inquiry — inquiry-based pricing is the last resort and requires employer / auditor acceptance with traceability (inquiry-verification report, preparation notes, all-in unit rate analysis sheets).
- ←
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-construction forecast calculation of works costs based on the construction drawing design documents, per prescribed procedures, methods and bases (GB/T 50875-2013, Clause 3.2.8). Preparation main line: lock the pricing bases → measure quantities per the quota norms' method of measurement → rate build-up (all-in unit rate = labour cost + materials + plant and small tools cost + management fee + profit + statutory levies and fees + taxes and duties; prepare supplementary unit-rate build-up schedules for work items not covered by the quota manuals) → apply on-costs → summarize → explanatory notes of the estimate → check and review; review main line: five methods (comprehensive / standard / grouping / comparison / key-item review, GB/T 51095-2015, Clause 5.1.5), focusing on quantities, labour/material/plant prices, pricing by applying quota line items, and on-cost application; deliverables follow three-level management (preparation–review–approval) with two-level review, and the recheck ratio is generally no less than 10%.
- ←
Quota borrowing rules: other industry/specialty quotas may be borrowed for missing items; cross-region borrowing is limited to exceptions (railway station buildings, power review verification, etc.)
Borrowing quotas of other industries/regions for missing items is a legitimate step-down path, subject to triple constraints: (1) process similarity with priority to one's own industry quota; (2) fees follow the borrowed quota system (per the corresponding industry authority's provisions; mixing fee regimes is prohibited); (3) procedural records (power verifies at budget review; railway files a copy with the industry standard administration agency). Cross-region borrowing is inapplicable by default, with express exceptions: railway passenger station buildings etc. may borrow the provincial local quota at the project location (with matching labor/material/machinery prices and fee quotas), and power may directly reference and apply local quotas.
- ←
Positioning, distinguishing, and linking target cost, responsibility cost, and planned cost (the GB/T 50326-2017 Clause 11.2.4 procedure)
The three form a chain of "targets passed down level by level, responsibilities compacted level by level": target cost sets the envelope (enterprise-level total target) → planned cost sets the path (the concretization of target cost, total ≤ target cost) → responsibility cost sets the responsible persons (planned cost cut by responsibility scope, sum = planned cost). The linking procedure is the six steps of GB/T 50326-2017 Clause 11.2.4: forecast cost → set the overall cost target → prepare the overall cost plan → decompose by responsibility scope → formulate control measures → hierarchical approval (the project management responsibility statement). For control, the planned cost serves as the target value of construction cost for periodic comparison and correction (GB/T 50502-2009 Clause 2.0.15).
- ←
BOQ item selection for cast-in-place concrete drainage ditches: structures channel (trough) 070109 vs structures pool 070101 vs building floor trench 010507003
A drainage ditch is a long, linear water-carrying structure — first exclude "structures pool" (070101 suits integral enclosed-wall structures like storage/water tanks and septic tanks); then choose by independence from buildings: an independent external channel (plant/site) -> GB/T 50860-2024 Appendix A.9 channel (trough) 070109 (subdivided into base slab / slab rebar / slab formwork); an internal or attached floor trench (workshop cable trench / equipment trench) -> GB 50854-2013 Table E.7 "cable trench, floor trench" 010507003 (measured in m by centerline length). Basis: the structures standard's note "channel (trough) means a channel or trough independent of and external to buildings".
- ←
Red-line checklist of situations where norm resource consumption must not be adjusted: no adjustment except where conversion is expressly permitted; adjusting quantity is not adjusting price
Quota norms are compiled on the basis of a rational project execution plan and normal construction conditions; except where conversion is expressly permitted, the consumption must not be changed merely because the actual project differs from the quota provisions. Red lines: differing project execution plan (construction methodology and site organization), operating methods, actual mix proportions, cement types, or machinery types/specifications must not be adjusted; content already comprehensively covered — such as on-site material loss and small machinery/tool costs (already in overheads (company and site)) — must not be double-counted; concrete/mortar quantities already listed per the standards must not be recalculated. Unit prices may be adjusted per compilation-period prices, but consumption is a quantity standard that does not vary with price fluctuations — adjusting price is not adjusting quantity.
- ←
Determining labour consumption in quota norms: composition, time-study methods and data-processing flow
Labour consumption in quota norms = basic labour + auxiliary labour + excess-haul labour (on-site small handling) + labour margin allowance (GB/T 50875-2013 simplifies this to basic labour + other labour; railway TB/T 10821-2024 uses basic + auxiliary + on-site small handling, without a separate margin allowance). It is determined on site by the realistic-work-record analysis method / chronometry, then processed through gross-error rejection -> adjustment coefficients -> random-error treatment -> computation of basic work time per unit product -> addition of other work times, converted at 8 hours per workday, and expressed as composite labour classes I/II/III.