Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Checklist of permitted quota-conversion situations and prohibited red lines: when conversion is allowed and how to convert

Quota conversion takes "express permission in the quota provisions" as the sole premise (DB63/T 2013-2022 §5.5): only prescribed situations may be converted — strength grades per mix-ratio tables; stabilized-soil base mix ratios per Ci=[Cd+Bd×(H−H0)]×Li/Ld; compaction thickness over the limit with layered machinery shifts ×2.0; dry/wet mortar interchange (1.75 t dry mix + 0.3 m3 water ≈ 1 m3 wet mix); labor coefficients for structural differences such as fair-faced walls/arcs/extra height; supply modes such as ready-mixed concrete/centralized mixing; admixtures counted separately; missing items compiled as supplementary quotas submitted for approval. Actual mix ratios (unless the notes allow), cement types, and machinery types/specifications are never convertible; after conversion, mark the item number with "converted" for traceability.

Applicable Codes

  • DB63/T 2013-2022 公路养护工程预算定额
  • DB63/T 2006-2021 公路钢筋混凝土装配式结构定额
  • TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程
  • TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
  • DL/T 5468-2013 输变电工程施工图预算编制导则
  • SJG 111.2-2022 城市地下综合管廊工程消耗量标准

Topic Positioning

Answers "under what situations quota conversion is possible": a checklist of common permitted conversion situations, conversion methods, and prohibited red lines, for judging whether a sub-item can be adjusted when applying budget/estimate quotas.

Core Conclusions

General principle: only situations expressly permitted by the quota provisions may be converted; all others are prohibited (DB63/T 2013-2022 §5.5; DB63/T 2006-2021 §4.3). Common permitted conversions: (1) Different strength grades: where the concrete/mortar or cement strength grade differs from the quota, convert per the mix-ratio tables (§5.6a); (2) Different design mix ratio of stabilized-soil base: convert per Ci=[Cd+Bd×(H−H0)]×Li/Ld (mix ratio linked with compaction thickness); (3) Compaction thickness over the limit requiring layered mixing and rolling (base/cushion layers over 15-20 cm): grader, mixer, and roller shifts ×2.0; thickness increments/decrements adjust material quantities per "per 1 cm increase/decrease"; (4) Supply modes: converting dry-mixed to wet-mixed mortar per 1.75 t dry mix + 0.3 m3 water ≈ 1 m3 wet mix, deducting mixer shifts and skilled-labor cost; changing site mixing to ready-mixed concrete deducts the quota concrete materials and mixing equipment, with ready-mixed concrete counted separately; changing dispersed to centralized mixing reduces labor by 2 workdays per 10 m3; (5) Labor coefficients for structural differences: common wall to single/double fair-faced wall labor ×1.15/1.30; masonry height over 3.6 m, the excess portion labor ×1.3; rubble slope protection over 4 m labor ×1.15; arc masonry labor ×1.10, materials ×1.03; column-surface insulation (compiled per walls) labor ×1.19, materials ×1.04; (6) Missing items: where technical conditions differ greatly from the quota, apply with adjustment; for missing items preferentially apply quotas of similar processes; with no similar sub-item, compile a supplementary quota per the project conditions and submit it to the quota administration agency for approval (DL/T 5468/5469/5464). Prohibited red lines: actual mix ratio differing from the quota table (unless the notes allow), different cement types (already comprehensively covered by the quota), and different machinery types/specifications are never convertible.

Applicable Boundaries

The above coefficients and formulas follow the specific provisions of each quota volume (railway, highway maintenance, power transmission/transformation, and local consumption standards differ from each other); the example values must not be applied across quotas; after conversion, the quota item number should be marked "converted" for traceability; amount-type adjustments (such as skilled-labor cost deductions) follow the local quota provisions.

Further Reading

DB63/T 2013-2022 Budget quota of highway maintenance works §5.5-5.8 and Appendix B.2.1; TB/T 10834-2024 Railway works budget quota Vol. 13 station works, volume notes Chapter 6 (mix-ratio conversion formulas and worked examples); TB/T 10831-2024 Vol. 10 volume notes Section 3 masonry works; SJG 111.2-2022 and SJG 84-2020 general provisions on dry/wet mortar interchange; DL/T 5468-2013 and DL/T 5469-2013 §4.1.4, DL/T 5464-2013 §4.1.5 on quota adjustment and supplementation.

Keywords

Cited By