mix design adjustment
- 01
Quota application and the four-stage pricing and measurement method (mixing, haulage, spreading and rolling, curing) for cement-stabilised crushed stone (cement-stabilised base) base courses
Pricing a cement-stabilised crushed stone base starts from the mix sourc…
JTG/T 3832-2018 公路工程预算定额JTG/T 3821-2018 公路工程估算指标TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程2026-10-05 - 02
Whether conversion is allowed when the actual construction process differs from the quota norms: general principle, permitted situations, prohibited red lines, and the step-down path for missing items
General principle: quota norms are compiled on the basis of a rational p…
DB63/T 2013-2022 公路养护工程预算定额DB63/T 2006-2021 公路钢筋混凝土装配式结构定额SJG 111.2-2022 城市地下综合管廊工程消耗量标准2026-09-25 - 03
Checklist of permitted quota-conversion situations and prohibited red lines: when conversion is allowed and how to convert
Quota conversion takes "express permission in the quota provisions" as t…
DB63/T 2013-2022 公路养护工程预算定额DB63/T 2006-2021 公路钢筋混凝土装配式结构定额TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程2026-09-25 - 04
Triage rules when quota materials differ from actually used materials: variety/species per express quota rules or via design change; same material — adjustment for price differentials only
First triage the type of "different material": for a variety/species cha…
DB63/T 2013-2022 公路养护工程预算定额TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程TB 10801-2024 铁路基本建设工程设计概(预)算编制办法2026-09-25 - 05
Red-line checklist of situations where norm resource consumption must not be adjusted: no adjustment except where conversion is expressly permitted; adjusting quantity is not adjusting price
Quota norms are compiled on the basis of a rational project execution pl…
DB63/T 2013-2022 公路养护工程预算定额DB63/T 2006-2021 公路钢筋混凝土装配式结构定额TB/T 10821-2024 铁路工程基本定额2026-09-25