Red-line checklist of situations where norm resource consumption must not be adjusted: no adjustment except where conversion is expressly permitted; adjusting quantity is not adjusting price
Quota norms are compiled on the basis of a rational project execution plan and normal construction conditions; except where conversion is expressly permitted, the consumption must not be changed merely because the actual project differs from the quota provisions. Red lines: differing project execution plan (construction methodology and site organization), operating methods, actual mix proportions, cement types, or machinery types/specifications must not be adjusted; content already comprehensively covered — such as on-site material loss and small machinery/tool costs (already in overheads (company and site)) — must not be double-counted; concrete/mortar quantities already listed per the standards must not be recalculated. Unit prices may be adjusted per compilation-period prices, but consumption is a quantity standard that does not vary with price fluctuations — adjusting price is not adjusting quantity.
Applicable Codes
- DB63/T 2013-2022 公路养护工程预算定额
- DB63/T 2006-2021 公路钢筋混凝土装配式结构定额
- TB/T 10821-2024 铁路工程基本定额
- SJG 181.1-2024 市政工程消耗量标准
- GB/T 50875-2013 工程造价术语标准
Topic Positioning
This card answers "under what situations norm resource consumption cannot be adjusted": except for the few situations where the quota expressly permits conversion, no adjustment is allowed otherwise. It sets out the general catch-all principle, the red-line checklist of non-adjustable situations, and distinguishes "adjusting quantity" from "adjusting price".
Core Conclusions
Quota norms are compiled on the basis of a rational project execution plan and normal construction conditions; except where conversion is expressly permitted, no change is allowed because the specific project's project execution plan (construction methodology and site organization), operating methods, or material consumption differ from the quota provisions (highway maintenance quota DB63/T 2013-2022 general notes §5.5 and prefabricated-structure quota DB63/T 2006-2021 §4.3 share the same position). Red-line non-adjustable situations:
- Differing project execution plan (construction methodology and site organization) or operating methods — no adjustment whether more advanced or more backward; the quota is a quantity standard at the socially average level;
- Actual mix proportions differing from the quota mix-proportion table — unless the mix-proportion table notes allow conversion (mix design adjustment);
- Different cement types — the quota cement quantity already comprehensively covers type factors; no adjustment regardless of the cement actually used;
- Different construction machinery types or specifications — machinery is determined per a generally rational project execution plan; actual differences are not convertible;
- On-site transport and operational losses of materials are already included in the quota and must not be additionally increased; off-site transport loss and warehouse keeping loss should be considered within the norm-based material price for estimating — adjust price, not quantity;
- Content already comprehensively covered by the quota must not be double-counted: small construction machinery/tool use costs are already in overheads (company and site), the tunnel lining concrete construction working platform is already comprehensively covered, etc.;
- Concrete/mortar material quantities already listed in the quota per the standards must not be recalculated; for different strength grades, only mix-proportion table conversion (mix design adjustment) is allowed. Key distinction: at the implementation stage prices are determined by the market (railway basic (fundamental) quota manual TB/T 10821-2024 general notes), and labour/material/machinery unit prices may be adjusted per compilation-period published price information (government guidance prices) — "adjusting price" is not "adjusting quantity"; consumption does not vary with price fluctuations.
Applicable Boundaries
Applies to scenarios of compiling estimates/budgets, tender price ceilings, and final account reviews based on consumption quotas (resource norms); the general notes of various industry quotas (highway maintenance, railway, municipal, etc.) share a consistent position and can be cross-referenced. Note this card lists only the "non-adjustable" checklist: permitted situations such as genuinely large technical-condition differences and strength-grade/mix-proportion conversions per tables or formulas are covered by the corresponding quota notes; work items not covered by the quota manuals are outside the scope of adjustment and should be compiled as supplementary quota items per the compilation principles and approved by the administration agency.
Further Reading
- DB63/T 2013-2022 Budget quota of highway maintenance works, general notes §5.3, §5.5, §5.6, §5.8 and Appendix B stabilized-soil base mix-proportion conversion formulas;
- DB63/T 2006-2021 Quota for highway reinforced concrete prefabricated structures §4.3;
- TB/T 10821-2024 Railway basic (fundamental) quota manual, general notes (prices determined by the market; scope of small on-site handling, etc.);
- SJG 181.1-2024 Consumption standard for municipal works (road works), general provisions §0.1.5 (bases for determining labour/material/machinery consumption and prices);
- GB/T 50875-2013 Standard for construction cost terminology §2.3 (definitions of works consumption quota and material consumption).
Keywords
Related Cards
- →
Preparing supplementary quota items (supplementary unit-rate build-up schedules): trigger conditions, consumption measurement, base price composition, industry approval, and distinction from supplementary BOQ items
Where the budget quota norms do not cover a work item and no similar sub-item can be applied, prepare a supplementary unit-rate build-up schedule per the compilation principles and methods of the budget quota norms (supplementation is the last resort — prefer adjusted application of existing quotas or similar quota items first; the power industry requires approval by the quota administration; railway supplementary unit-price analyses are copied to the industry standards administration, and passenger station buildings etc. may adopt provincial local quota norms instead). Labour consumption = basic labour + extra-haulage labour + auxiliary labour + labour margin, measured by work-study recording / time measurement; materials = net quantity × (1 + wastage rate), turnover materials by amortized quantity; base price = labour cost + material cost + machinery cost, with management fee, profit, statutory levies and fees, and taxes added for the all-in unit rate. A missing BOQ item is a listing-level matter: supplementary item codes use the standard code + B + three digits (e.g., from 07B001) and are filed with the provincial administration.
- →
Conversion judgment and methods when a quota item's work content differs from site reality (no conversion for aggregated content; convert by difference type; supplementary valuation for missing items; "换" mark traceability)
Before converting, judge "whether conversion is allowed": content already aggregated in the quota (formwork support content aggregating steel/wood props, external scaffolding aggregating ramps/loading platforms, on-site handling already included) may not be adjusted even if inconsistent with reality; adjustment is allowed only where technical conditions differ significantly from the quota's basis. Convert by difference type: coefficient adjustment; strength grade / mix-proportion conversion (per mix tables or formulas); thickness increment/decrement items; material substitution (bracketed materials priced separately, ready-mixed concrete deducting mixing-equipment consumption). Missing items are not converted — prepare a supplementary unit valuation table per the quota compilation principles (GB/T 51095-2015 Clause 5.3.12); converted quota codes must carry the "换" mark for traceability.
- →
Audit of pricing by applying quota line items: identifying over-application, misapplication, and duplicate application via the three-way comparison
Identify problems of pricing by applying quota line items using the "three-way comparison": actual works (drawings / construction method statement) ↔ the work content of the quota line item ↔ the quota chapter notes and calculation rules. For over-application, check specifications, machinery, process, haul/height brackets, and unsupported coefficients; for misapplication, check cross-volume applications, wrong pairings, unsupported borrowings (missing items require supplementary unit-rate build-up schedules), conversions lacking the "换" (converted) mark, and superseded versions; for duplicate application, check work-content coverage (cast-in-place concrete already includes formwork, etc.), line-item splitting, and double-counted preliminaries. Rank items by amount to lock high-value items for focused audit.
Cited By
- ←
Weld-joint content rules of pipe installation quotas and handling of excess site welds: quotas do not measure by the number of weld joints and set no per-joint top-up clause (weld joints sit within the comprehensive consumption of labour, welding consumables and welding-machine machine-shifts); the actual weld count is verified as pipe-section butt joints (L/standard length - 1) + butt-welded fittings x2 + fixed and tie-in welds as executed; quantities above the quota determination are not adjustable under clause 3.1.19 - the only routes are a design variation swapping items or a supplementary quota submitted for approval; where fittings are already counted by number, or flanged connections count main materials only, weld joints must not be counted twice
Pipe installation items are not measured by the number of weld joints, and the standard sets no general clause topping up excess welds per joint: industrial piping is measured by pipe length (clause 6.8.18) and fittings by the quantities shown on the design (clause 6.8.25), the influence of weld joints being implicit in the comprehensive consumption of labour, welding consumables and welding-machine machine-shifts; more actual welds than the quota determination is a difference in construction conditions, and under clause 3.1.19 construction consumption shall not be adjusted except as clauses 4.1.1 to 10.7.31 provide otherwise - the only lawful routes are a design variation to swap items or a supplementary unit-price schedule compiled and submitted for approval. The site weld count verified as pipe-section butt joints (L/standard length - 1) plus butt-welded fittings x2 plus fixed and tie-in welds as executed is a practical accounting value and must not serve as a settlement basis; where fittings already run the fitting-installation item by number, or flanged fittings count main materials only, their weld joints must not be counted again.
- ←
Data-taking rules of earthwork and rockwork budget quotas: classifying trenches and pits against general earthwork, classifying dry and wet soil, muck and frozen soil, items already comprehensively included in the quota and not adjustable, determination and successive-multiplication rules for efficiency-reduction conversion coefficients (wet soil, excavation within shoring, excavation between piles, local deepening, deep excavation, vertical soil transport, dynamically compacted ground, etc.), uphill-haul efficiency reduction and allowable over-excavation, and dewatering and shoring to be calculated separately
Earthwork quota data-taking starts with three preliminary steps: (1) classify trench or pit (base width up to 7 m and base length over 3 times the base width, or base length up to 3 times the base width and base area up to 150 m2 - beyond these limits, and not being site levelling, it is general earthwork); (2) split dry and wet soil at the normal groundwater level given in the geological survey data - where dewatering is adopted, the post-dewatering level is the normal water level and dewatering costs are calculated separately; (3) first remove items already comprehensively included and not adjustable (machine excavation already includes manual cleaning of residual layers up to 0.30 m thick on base and slopes, efficiency reduction for loaded uphill hauls at gradients up to 15%, and pipe laying already includes ordinary trench-side shoring). Efficiency reductions then follow the quota coefficients: wet soil by hand labour x1.18; wet soil by machine labour and machines x1.15; hand-dug trenches and pits within shoring x1.43 on labour; soil between piles x1.25 on labour under hand quotas (x1.10 on labour and machines under machine quotas); locally deepened trenches and pits x1.25 on labour and machines; vertical soil transport by hand x1.50; excavation on dynamically compacted ground x1.15; hand excavation beyond 6 m x1.15 per additional metre; where two coefficients coexist they are multiplied successively. Coefficients are taken from the notes of the quota volume actually applied and must not be mixed across volumes.
- ←
Deciding the relation between bell-and-spigot joints and rubber-ring joint items: joint nature (rigid cement caulked / flexible rubber ring) -> quota basis (joint inside the pipe-laying metre, or a joint item counted per piece) -> whether the ring double-charges, split by pipe material (cast iron / reinforced concrete / plastic) and quota system
Bell-and-spigot is only an end construction, never a pricing basis: cement or asbestos-cement caulked joints (oakum packing included) are rigid; rubber rings, flanged gland plus ring, and clamp plus ring are flexible. Where the joint method is written into the pipe-laying item's name or work content, it is inside the metre-priced laying - never add a 'ring joint' item; only where the quota lists joints as items (railway pipe-jacking joints PY-407~PY-414; municipal collar joints / caulking) do joints count per piece or per ten. Rings as joint auxiliaries already sit in the item's materials (ductile iron laying lists rubber ring at 0, i.e. supplied none extra); pipe main materials outside the base price price separately per the annex table - rings never charge twice.
- ←
Recasting the concrete volume increment and the formwork contact-area increment after section-size changes to concrete members, why the two move out of step (volume is quadratic in size, formwork linear), the layered order of computation for linked rebar costs, and the tie-in with the 15% quantity-deviation clauses
Concrete is measured by design volume (m3) and formwork by contact area with the concrete (m2) - two independent BOQ items and two geometric functions, so they cannot move in step. With length unchanged, the concrete increment dV = (A_c1 - A_c0) x L; the formwork increment dA = (C1 - C0) x L + (A_b1 - A_b0). The section area b.h is homogeneous of degree 2 in the sizes while the section perimeter 2(b+h) is degree 1: scale the section by k on both sides and volume grows by k^2 but formwork by k - a column with both sides enlarged 5% gains about 10.25% volume but only 5% formwork. After the change, measurement = original BOQ quantity plus or minus the increment; whether the quantity change triggers rate renegotiation follows the 15% bands of GB/T 50500-2024 clauses 8.9.1/8.9.2.
- ←
Where material wastage is booked, and the double counting and omission tests: off-site transport and storage losses into the material unit price (price factor) versus site haulage and operation losses into the quota consumption (quantity factor), with the site warehouse / designated stockpile point as the boundary, plus a comparison of booking positions for typical work items and settlement audit checkpoints
Material wastage may enter only one of the material unit price (price factor) or the quota consumption (quantity factor); the dividing line is the site warehouse / designated stockpile point. Losses before the line (source to site warehouse) - transport loss and store-keeping loss - go into the material unit price (highway lists an off-site transport wastage rate separately; railway folds it into purchasing and custody charges; building works list a transport loss charge plus a storage loss); losses after the line (warehouse / stockpile point to the point of working or installation) - transport, processing, working and on-site stockpiling losses - go into the quota consumption. Since material cost = quota material consumption x norm-based material price, each factor carries only its own segment of wastage and nothing repeats: multiplying the same segment into both factors (overstating by roughly that wastage rate) is double counting; missing from both is omission. When applying quotas to compile a budget, the wastage rate must not be applied once more on top of the quota consumption (consumption = net quantity x (1 + wastage rate) is an algorithm at the level of quota compilation and measurement only).
- ←
Re-derivation of the all-in unit rate when a changed construction method makes the quota machine-shift consumption inapplicable: the three-path quota conversion test, the hierarchy of bases for recalculating plant consumption, the requirements for recasting the all-in unit rate analysis sheet, and the procedure for confirmation by the employer
Changes of construction method and plant usage are factors expressly listed in GB/T 50500-2024 Clause 8.9.1 as changes of item description or construction condition that can trigger adjustment of the all-in unit rate, but conversion must step down level by level: a conversion line item within the same chapter (DL/T 5468-2013 Clause 4.1.4 item 1: 'where the technical conditions prescribed by the quota (index) differ materially from the actual conditions of the works, the applicable quota (index) may be adjusted and applied according to the technical conditions of the works and the provisions of the quota') -> an express quota coefficient -> borrowing a similar process -> building up a rate from supplementary consumption (GB/T 51095-2015 Clause 5.3.12; TB 10801-2024 Clause 2.4.3); with no express coefficient, none may be invented. The hierarchy for recalculating machine-shift consumption is: contractor's in-house norms (GB/T 50875-2013 Clause 2.3.3) -> construction quotas (Clause 2.3.5) -> budgets or final accounts of similar works, or site measurement records certified by both parties (DL/T 5468-2013 Clause 4.1.4 item 2). After conversion, the all-in unit rate analysis sheet must be recast (GB/T 51095-2015 Clause 5.3.9; GB/T 50500-2024 Clause 6.2.12 and Annex E Table E.2.2-1) and submitted to the employer under the 'submission, checking, review, re-examination and confirmation' procedure (Clauses 8.1.2 and 8.1.3; for additional works, the project execution plan or implementation scheme and the priced offer must also be submitted before execution, Clause 8.10.2). The original quota line item must never be applied in departure from the approved construction scheme.
- ←
Pricing yardstick of the railway works budget quota manual for demolition works: counting only labour and machine-shift consumption multiplied by demolition coefficients by object category, excluding material cost, plus operating-height adjustment coefficients
The railway quota system sets no separate demolition line items: the corresponding installation line item is taken and multiplied by a demolition coefficient. The Volume 8 (Power Works) preamble Table 3 of TB/T 10829-2024 multiplies both labour and machine-shift consumption by 0.40 for lighting fittings, transformer and distribution boxes, control/power/lighting packaged cabinets (boxes), cable brackets, cable troughs and trays; 0.75 for concrete poles and foundations; 0.80 for angle-steel towers, steel-tube towers, beacon towers, light bridges, steel columns, busbar structures and their foundations; 0.50 for overhead lines and cables; 0.65 for underground cable routes. The information works and signal works volumes under Guotie Kefa [2017] No. 33 give 0.7 for wiring systems and outdoor/indoor cables and 0.5 for equipment and materials, and expressly count 'only labour and machine-shift consumption (excluding instruments and meters)' with no material cost.
- ←
The three rebar quantities (drawing quantity -> cutting quantity -> procurement quantity): stage-by-stage measurement bases, the quota chapter where the wastage rate is taken, and the conversion procurement quantity = budget quantity x (1 + wastage rate)
Drawing quantity = design centreline length x theoretical unit mass (includes anchorage and design laps; excludes construction laps / auxiliary bars / wastage); cutting quantity = drawing quantity + end hook growth values, bend deduction values (elongation as a deduction), stock-length laps and splice lengths, auxiliary bars and the inclined length of bent-up bars; procurement quantity = budget quantity x (1 + wastage rate), the wastage rate being taken item by item by bar type and splice method. In the railway system the reinforcement wastage rate is taken uniformly from Chapter 10 'on-site material handling and operation wastage rates' of the 'Railway basic quota manual' TB/T 10821-2024 (welding 1.5%, mechanical splices 1%, prestressing tendons 4% excluding the external-tensioning working length), not from the concrete chapter or the reinforcement fabrication chapter.
- ←
Treating unit-works pile foundation (bored pile) quantities below the quota table's listed amounts: labour and plant of the corresponding items x 1.25, with no separate small-works addition
Building and decoration consumption quotas handle 'unit-works pile quantities below the table thresholds' by quota-consumption conversion - labour and plant of the corresponding items x 1.25 (materials excluded) - not by creating a 'small-works addition' fee item; the two are different layers, and the same quantities may never take both the factor and the addition. The bored-pile measurement base differs by volume (quantities per the measurement rules / concrete from the cap interface to the toe excluding bore protection / placed concrete volume) - check the threshold table of the volume in use.
- ←
Adjusting and redesigning concrete mixes during construction (moisture conversion / minor admixture and sand-ratio tuning / redesign) and the opening-batch appraisal of first-use mixes: requirements, content and organisation
Construction-stage mix management has three tiers (TB/T 3275-2018 clause 8.2): 8.2.1 - before casting, adjust the water of the design mix to the actual moisture of the aggregates to fix the construction mix (every time, mandatory); 8.2.2 - where process and environment are essentially unchanged and raw-material quality fluctuates within compliance, the water-reducer and air-entrainer dosages, coarse-aggregate grading proportions and sand ratio may be tuned, the fresh properties still meeting design or construction requirements; 8.2.3 - on major changes of raw-material quality or process, the mix must be redesigned. First-use mixes require an opening-batch appraisal checking materials, strength, setting time and consistency against the design mix, at least once per mix (GB 50204-2015 clause 7.3.4); the appraisal covers five items - material consistency, fresh-workability consistency, strength, setting time and, where required, durability (GB 50666-2011 clause 7.4.5); on site it is organised by the supervising engineer.
- ←
Pricing when design sizes exceed the top band of budget quota items (quota gap / over-range): over-range is a gap, not a conversion; proportional extrapolation is banned; four steps - express note, top band, borrowing similar-workmanship quotas, supplementary build-up for approval
Design sizes above the quota's top band are a quota gap, not a quota conversion: no linear extrapolation by diameter, section area or capacity, and no self-invented unfounded coefficients (review reads up-rating). Order: 1 check the volume / chapter notes for express over-range provisions and follow them (e.g. stated adjustment coefficients); 2 absent them, the top band is the ceiling - apply it and record the design difference honestly in the notes, no equivalent-quantity conversion or self-set coefficients; 3 borrow similar-workmanship quotas (cross-volume / discipline / region allowed), listing the borrowing basis, charging following the borrowed volume's rules; 4 compile a supplementary unit-rate build-up per quota compilation principles and submit for approval (GB/T 51095-2015 Article 5.3.12; DL/T 5468-2013 Article 4.1.4). Sizes below the bottom band likewise bar interpolation.
- ←
Adjusting haul-distance changes in quota transport items: items are compiled as a base-haul band plus increment bands; cost is not proportional to distance, so scaling by distance ratio is forbidden
Quota transport items come in a banded ladder of a base haul band plus an increment band; each band's cost carries distance-independent fixed consumptions - loading and unloading, waiting, empty returns - so cost is not proportional to distance: a shortened haul must not be scaled by ratio (1 km cut to 200 m is not x 0.2); where a first band up to 200 m exists, apply that band directly; where the first band is 1 km or more, 200 m still falls within it and the base item applies without reduction; only beyond the first band does base item + increment item x number of increments stack, the count rounding at the half (a remainder under half an increment unit is dropped, at half or more it counts as one); adjusted items must carry a conversion mark on the item number.
- ←
Quota pricing route for micro-disturbance cement mixing piles (IMS piles): workmanship classification, quota-gap determination and cement-content conversion
Micro-disturbance cement mixing piles (IMS piles) are a workmanship variant of deep cement mixing piles (T/ZS 0141-2020 Article 2.1.1); pricing lands in the deep cement mixing pile items of the ground-treatment chapter, not a new pile type; because the rig and workmanship parameters differ from conventional triaxial practice (high-pressure air-assisted cutting shall not be used; dedicated combined augers), triaxial items cannot be casually applied, nor pin-type items misattributed - where no matching item exists, treat as a quota gap (first adapt the nearest similar workmanship, else compile a supplementary unit-rate build-up schedule on quota principles for approval); where the cement content differs from the quota basis, stack the per-additional-1%-cement or plus-minus-5-kg/m adjustment items instead of editing consumptions directly.
- ←
Quota conversion coefficients and item adjustment rules for masonry and vertical-surface insulation works (wall over-height, curved masonry, double fair-faced boundary walls, rubble slope protection over-height, curved wall / column-surface insulation labour and material coefficients)
TB/T 10831-2024 Volume 10 Buildings, volume notes: where masonry wall height exceeds 3.60 m, the quota labour on the excess quantity is multiplied by 1.3; brick, block and stone masonry are compiled for straight masonry - for curved masonry the corresponding quota labour is multiplied by 1.10 and the bricks, blocks, stone masonry and mortar (adhesive) by 1.03; double fair-faced boundary walls apply the single-face fair-faced wall items with quota labour x 1.15; rubble stone slope protection over 4 m high takes quota labour x 1.15; in vertical-surface thermal insulation, curved-wall surfaces take labour x 1.10 and column-surface insulation labour x 1.19 and materials x 1.04; insulation material mix proportions, nature and thickness may be converted where they differ from the design.
- ←
Quota application and the four-stage pricing and measurement method (mixing, haulage, spreading and rolling, curing) for cement-stabilised crushed stone (cement-stabilised base) base courses
Pricing a cement-stabilised crushed stone base starts from the mix source: with purchased commercial mix, only one base spreading-and-rolling item is applied - mixing is already in the priced material and is not itemised again, and curing is in the item's work content and not itemised; with site mixing (in-place road mixing / central plant mixing) the works split into mixing + haulage + spreading and rolling. Haulage stacks a base haul distance plus increment hauls; where the average haul exceeds 15 km the haulage cost is calculated at market rates; where the mix proportion differs, materials are converted by Ci = [Cd + Bd x (H - H0)] x Li / Ld; where the compacted thickness exceeds the limit and mixing and rolling are done in layers, grader and roller machine-shifts are doubled per the quota quantities (DB63 road base over 15 cm: doubled plus 1.5 workdays per 1000 m2; TB/T 10834 station surfaces over 15 cm and base and cushion courses over 20 cm: x 2.0 coefficient).
- ←
How quotas list plant fuel (and power) consumption and the "daily consumption" conversion: no standalone daily quota exists - the machine-shift fuel and power consumption governs (GB/T 51366-2019 Annex C, TB/T 10814-2024, and sector and local machine-shift cost quotas)
The quota system carries no standalone "daily consumption quota" heading; fuel and power list per machine-shift: petrol (kg per shift), diesel (kg per shift), electricity (kWh per shift), water (t per shift), gas (m3 per shift). One machine-shift = one working shift = 8 h, so the shift consumption is in substance one shift's fuel; daily use converts as daily = shift consumption x shifts worked per day (double shift x 2). Sources: MHURD Rules for Compiling Construction Plant Machine-Shift Costs (Jianbiao [2015] No. 34), carried by GB/T 51366-2019 Annex C table C.0.1 "energy use of common construction plant"; sector bases in TB/T 10814-2024 (railway - power cost split into petrol / diesel / electricity / gas / water) and JTG/T 3833-2018 (highway - items 5-7 variable costs); provincial machine-shift quotas and rules all carry a "labour and fuel-and-power quantities" column, priced at local budget or market rates.
- ←
Beijing 2024 consumption standard (DB11/T 2382-2024) waterproof mortar: sub-item selection cross-referenced by position and method - roof A-9-83/84/85/89, walls A-9-166/167, floors A-9-209
Under Appendix A.9 of the Beijing 2024 "Construction Consumption Standard" (DB11/T 2382-2024), waterproof mortar has independent sub-items set by "position + method" and they must not be applied across positions: within the roof rigid-waterproofing table, A-9-84 (with waterproofing agent), A-9-83 (SF polymer), A-9-85 (cementitious capillary crystalline), A-9-89 (waterproof concrete); walls A-9-166 (dry-mixed rendering mortar DP M10 + waterproofing agent), A-9-167 (SF polymer); floors A-9-209 (with waterproofing agent). All are measured in m2; the corresponding 2021-edition numbers are 9-84/9-83/9-85/9-89, 9-166/9-167 and 9-209 (the 2024 edition adds the "A-" prefix in one-to-one correspondence).
- ←
Railway 2024 quota norms (prescribed resource consumption standards; TB/T 10822-2024): subgrade slope smooth (pre-split) blasting and deep-hole blasting — application of quota items and dual area/volume overlay measurement rules
In the Railway 2024 quota norms, smooth (pre-split) blasting is an independent quota item family LY-58/59/60 (hole diameter 70-120 mm, unit of measurement 100 m2, measured by design slope area) that must be applied separately and 'shall be used in addition to other rock-excavation quota norms'; the main deep-hole blasting LY-46~51 is measured per the natural in-situ (undisturbed) volume inside the design excavation line (100 m3). The two are priced cumulatively, with quantities mutually non-deducting and each listed independently.
- ←
Railway bridge and culvert quota foundation excavation and pit pumping: excavation excludes pumping; pumping measured per wet-soil/pit volume with inflow-rate steps (TB/T 10823-2024, Volume 2)
In TB/T 10823-2024 "Railway works budget quota, Volume 2: bridge and culvert works", the excavation items (QY-1~23) have the work content "excavate and haul 10 m beyond the pit, including manual digging and hauling of the soil within 0.3 m of the pit bottom, and trimming of pit walls and bottom" — pumping is not included and must use the separate pit-pumping items. Pit pumping QY-35~37 is measured per "10 m3 of wet soil" (wet soil = the volume excavated below the standing groundwater table), stepped by design inflow rate (weak flow <=15, medium flow <=40, strong flow <=60 m3/h); QY-38 pumping of static water is per the designed pumped volume (applicable only to removing ponded water from ponds and pools). Where wellpoint dewatering is used, the excavation is always treated as water-free — no double counting with wet excavation or pit pumping; inflow rates above 60 m3/h have no step and must be separately assessed.
- ←
How tile/stone setting-out schemes (tile/slab layout drawings) affect wastage rates and material costs: layout rules, the quota's comprehensive determination basis and adjustable exceptions, and cutting labor coefficients
The setting-out scheme determines the actual wastage rate — the quota wastage rate (tiles/mosaics 2%) is determined on the basis of "reasonable layout", and layout quality can make the actual wastage float between 2% and 10%. Layout rules: floors start from the door line, walls from external corners, non-whole tiles concentrated at internal corners; no more than 2 columns of non-full tiles per wall, each ≥1/3 of the full width (DB/T 29-35-2017 Clause 7.1.4). The quota wastage is a comprehensively determined value not adjusted for layout (Beijing DB11/T 2382-2024 tile and stone finishes consumption 1.02 m²/m²); over-consumption costs are borne by the contractor (GB/T 50500-2024 Clause 3.6.3); where joint alignment, patterns, or artistic shapes cause wastage differing from the quota, the consumption may be adjusted (T SZCA 5-2022 Clause 0.1.15). Each ±1% change in wastage rate changes material cost by ≈ paved area × unit price × 1%.
- ←
Applying the railway subgrade controlled-blasting quota: class A/B/C judgment conditions and item selection (TB/T 10822-2024, Volume 1, Chapter 1)
The controlled-blasting quota applies only to rock excavation "near an existing railway where a second track is added and blasting must be controlled", classed A/B/C by construction conditions (A strictest: line spacing <=5 m, cut height >=8 m, cut thickness <=4 m, existing slope >1:0.5, sub-hard rock or harder; B: spacing <=10 m, thickness <=10 m, existing slope <=1:0.5; C: neither A nor B, but no natural screen within 50 m of the existing cut slope crest), judged in A->B->C order. The quota already includes possession-caused efficiency loss — no train-interference construction additional fee. Without an existing line (e.g., near villages only), controlled blasting does not apply: use deep/shallow-hole blasting (spoil or requiring crushing: LY-46/47/48/52/53/54; direct cut-to-fill: LY-49/50/51/55/56/57) or static blasting + rock breaking, plus the blast-coverage quota per the blast design.
- ←
Handling path for missing quota items: similar-process application -> compilation from similar-project data -> compilation from technical conditions -> approval/filing (including power and railway industry differences)
Missing quota items are handled in step-down order: (1) preferentially refer to quotas of similar construction processes (power first refers to similar power quotas, then cross-industry/local ones with matching fee standards); (2) with no similar sub-item but similar-project budget/settlement data available, compile the supplementary quota therefrom; (3) with no data, compile per the project's specific technical conditions; (4) submit the supplementary quota to the quota administration agency for approval before use; in railway, file a copy with the industry standard administration agency. Railway passenger station buildings, canopies, and overpasses may borrow the provincial local quota at the project location with matching fee standards. Unapproved supplementary quotas do not stand in settlement and audit.
- ←
Bill-of-quantities listing of railings, panels and handrails (GB/T 50854-2024 Annex Q table Q.3.1, code 011503) and mapping to the Beijing 2024 consumption standard quota items: glass panels, finished railings and cast-iron scroll railings, dual measurement by area and by length, and the rule that bend lengths enter the centreline length
Railing, panel and handrail decoration lists under GB/T 50854-2024 Annex Q table Q.3.1 (code 011503); material and post-cap differences go into the item description, not separate codes. Under Beijing DB11/T 2382-2024, railings (panels) are measured by area m2 at design-shown dimensions and handrails and accessibility railings by handrail centreline length m (bends included), with no addition for parts embedded in the structure; where railing / panel and handrail are installed as one unit, the railing / panel items execute and the handrail item does not. Item mapping: metal stair railings (panels) A-15-52 to A-15-61 mostly m2 (only A-15-60 accessibility railings by m), metal stair handrails A-15-62 to A-15-64 by m, hardwood handrails in the hardwood railing table A-15-67 to A-15-69 by m.
- ←
Concrete over-consumption coefficients and wastage rates for railway bored/cast-in-place piles: TB/T 10823-2024 bridge volume (+1m, no over-break, no over-consumption coefficient) vs TB/T 10831-2024 buildings volume (coefficients 1.15-1.30) and TB/T 10821-2024 cast-in-place concrete wastage rate 2%
Two regimes in the 2024 railway quotas: (1) bridge bored piles (TB/T 10823-2024): priced concrete = (design length + 1m) x design shaft area; "over-break shall not be included in the quantity" - no over-consumption coefficient; pile-head over-grout ring-cut removal priced separately per pile. (2) Building piles (TB/T 10831-2024): material contents already include over-consumption coefficient and wastage - impact-hole rigs 1.30, rotary/percussion 1.25, rotary/auger 1.20, driven-tube 1.15. (3) Site handling/operation wastage of concrete (TB/T 10821-2024 appendix): cast-in-place 2%, precast 1%; material consumption = priced volume x (1 + wastage rate).
- ←
Triage rules when quota materials differ from actually used materials: variety/species per express quota rules or via design change; same material — adjustment for price differentials only
First triage the type of "different material": for a variety/species change, non-load-bearing materials follow express quota conversion rules for consumption conversion (mix-proportion tables, stabilized-soil mix formulas, dry/wet mortar equivalent interchange, admixture/ready-mixed concrete adjustments), while load-bearing structural materials (rebar/sections/timber) must go through design change and equal-strength/equal-section substitution procedures — not quota conversion; changing only the price of the same material is purely an adjustment for price differentials (consumption fixed; price difference = quota consumption x (compilation-period price - base-period price)). Red lines: cement variety, actual construction mix proportion, and machinery type/species differences are never converted; site losses are already included and not counted again.
- ←
TB/T 10824-2024 railway tunnel shotcrete quantity computation and the pricing rules for rebound and overbreak/reserved-deformation backfill (Volume 3, Chapter 1 Section 3 support)
Per TB/T 10824-2024 Volume 3: shotcrete quantity = spray area x design thickness, the spray area per the design outer profile line, and shall include the quantities to be backfilled with shotcrete for design-allowed overbreak and reserved deformation (mining method also includes design face-sealing quantities). Rebound loss is not in the spray item's consumptions — the quota is compiled as "wet-mix spraying" and "rebound and treatment" separately, rebound taken at 16% of the shotcrete quantity and adjustable per the design (SY-85 spraying / SY-86 rebound and treatment 16% / SY-87 per +/-1%). The quota does not allow for design-allowed overbreak backfill or reserved-deformation backfill — backfill enters via enlarged quantities under the same spray item, not via added consumptions.
- ←
TB/T 10823-2024 bridge volume over-water construction definition: by construction method, not water depth (vessel work/trestle/island building); depth only sets the drilling platform step
The "over-water" definition in TB/T 10823-2024 Volume 2 looks at construction method with no numeric depth boundary: over-water quotas apply to works designed to be executed from vessels and to works on over-water trestles not connected to land; where the trestle connects to land, concrete switches to land mixing and transport, concreting and rebar adjust vessel counts per the project execution plan (construction methodology and site organization), and river flats and mid-water islands use land quotas. Depth only sets the over-water drilling platform step: QY-219 dia <=2.0 m depth <=5 m; QY-220 dia <=3.5 m depth <=10 m; QY-221 dia <=3.5 m depth <=20 m; QY-218 platform on steel cofferdam. At equal diameter and stratum, over-water drilling costs about 2.2x land; the gap is mainly vessel plant + about 40% more labor + shaped-steel positioning materials; underwater concreting is about 4.4x; over-water also needs the working platform — the largest single share of the total gap.
- ←
TB/T 10825-2024 track quota: CWR track laying and rail-material transport compiled at "rail length <=500 m" — laying longer rail strings (unit sections) applies directly, no conversion, no extra booking
Under the railway 2024 quotas (TB/T 10825-2024 Volume 4 track works), long-rail laying for CWR (GY-9~11, GY-24~30) and rail-material transport (GY-31~36) are all compiled at "rail length <=500 m"; units are track-km laid / 1 km of rail material, consumptions amortized per kilometre — "<=500 m" is a compilation basis, not a ceiling. Laying long rails beyond 500 m on site (design unit sections preferably 1000-2000 m, TB 10015-2012 Clause 4.5.1) applies directly, with no conversion factor and no "excess booked separately" clause; rail-string joints use the on-site rail welding quota separately; closure sawing and rail drilling per Chapter 6. Wherever the volume requires adjustment it lists a factor (grade >20 permille x1.5, tunnel >1 km x1.25, both x1.75, etc.); no factor means apply directly.
- ←
Framework of causes for the gap between quota norms and actual market construction costs: social-average vs contractor-specific levels, base-period vs market prices, six source dimensions, and practical responses
Quota norms are a pricing benchmark compiled under normal construction conditions, social-average consumption levels, and base-period prices — not a mirror of a contractor's actual cost. The gap is normal, not anomalous, and arises from six dimensions: social-average vs contractor-specific levels; base-period price vs market price (bridged by adjustment for price differentials); normal conditions vs actual working conditions; generous vs actual measured quantities (wastage-rate/margin differences); mechanisation and organisation level; and market competition and supply-demand. Profit margin = quota norm price − contractor's actual cost; settlement allows no reimbursement at actuals — follow the contract's clauses on price differentials / published price information (government guidance prices).
- ←
Whether curing is priced separately when applying quotas to cement-concrete pavement: Beijing DB11/T 2382-2024, Shenzhen SJG 181.1-2024, and the highway quota all include curing
Cement-concrete pavement is priced by the surface-course sub-item; curing is already in the quota work content — no separate computation, no separate curing BOQ item. Beijing DB11/T 2382-2024 sub-item D2-2-20 "cement concrete surface course, 18 cm thick" work content verbatim includes "placing, vibrating, troweling, texturing, curing, etc."; Shenzhen SJG 181.1-2024 states expressly "cement-concrete pavement placing comprehensively considers pavement curing, not computed separately"; the highway system's sub-item 2-3-8 work content also includes "texturing and curing". Three calibers, one verdict.