Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Red-line checklist of situations where norm resource consumption must not be adjusted: no adjustment except where conversion is expressly permitted; adjusting quantity is not adjusting price

Quota norms are compiled on the basis of a rational project execution plan and normal construction conditions; except where conversion is expressly permitted, the consumption must not be changed merely because the actual project differs from the quota provisions. Red lines: differing project execution plan (construction methodology and site organization), operating methods, actual mix proportions, cement types, or machinery types/specifications must not be adjusted; content already comprehensively covered — such as on-site material loss and small machinery/tool costs (already in overheads (company and site)) — must not be double-counted; concrete/mortar quantities already listed per the standards must not be recalculated. Unit prices may be adjusted per compilation-period prices, but consumption is a quantity standard that does not vary with price fluctuations — adjusting price is not adjusting quantity.

Applicable Codes

  • DB63/T 2013-2022 公路养护工程预算定额
  • DB63/T 2006-2021 公路钢筋混凝土装配式结构定额
  • TB/T 10821-2024 铁路工程基本定额
  • SJG 181.1-2024 市政工程消耗量标准
  • GB/T 50875-2013 工程造价术语标准

Topic Positioning

This card answers "under what situations norm resource consumption cannot be adjusted": except for the few situations where the quota expressly permits conversion, no adjustment is allowed otherwise. It sets out the general catch-all principle, the red-line checklist of non-adjustable situations, and distinguishes "adjusting quantity" from "adjusting price".

Core Conclusions

Quota norms are compiled on the basis of a rational project execution plan and normal construction conditions; except where conversion is expressly permitted, no change is allowed because the specific project's project execution plan (construction methodology and site organization), operating methods, or material consumption differ from the quota provisions (highway maintenance quota DB63/T 2013-2022 general notes §5.5 and prefabricated-structure quota DB63/T 2006-2021 §4.3 share the same position). Red-line non-adjustable situations:

  1. Differing project execution plan (construction methodology and site organization) or operating methods — no adjustment whether more advanced or more backward; the quota is a quantity standard at the socially average level;
  2. Actual mix proportions differing from the quota mix-proportion table — unless the mix-proportion table notes allow conversion (mix design adjustment);
  3. Different cement types — the quota cement quantity already comprehensively covers type factors; no adjustment regardless of the cement actually used;
  4. Different construction machinery types or specifications — machinery is determined per a generally rational project execution plan; actual differences are not convertible;
  5. On-site transport and operational losses of materials are already included in the quota and must not be additionally increased; off-site transport loss and warehouse keeping loss should be considered within the norm-based material price for estimating — adjust price, not quantity;
  6. Content already comprehensively covered by the quota must not be double-counted: small construction machinery/tool use costs are already in overheads (company and site), the tunnel lining concrete construction working platform is already comprehensively covered, etc.;
  7. Concrete/mortar material quantities already listed in the quota per the standards must not be recalculated; for different strength grades, only mix-proportion table conversion (mix design adjustment) is allowed. Key distinction: at the implementation stage prices are determined by the market (railway basic (fundamental) quota manual TB/T 10821-2024 general notes), and labour/material/machinery unit prices may be adjusted per compilation-period published price information (government guidance prices) — "adjusting price" is not "adjusting quantity"; consumption does not vary with price fluctuations.

Applicable Boundaries

Applies to scenarios of compiling estimates/budgets, tender price ceilings, and final account reviews based on consumption quotas (resource norms); the general notes of various industry quotas (highway maintenance, railway, municipal, etc.) share a consistent position and can be cross-referenced. Note this card lists only the "non-adjustable" checklist: permitted situations such as genuinely large technical-condition differences and strength-grade/mix-proportion conversions per tables or formulas are covered by the corresponding quota notes; work items not covered by the quota manuals are outside the scope of adjustment and should be compiled as supplementary quota items per the compilation principles and approved by the administration agency.

Further Reading

  • DB63/T 2013-2022 Budget quota of highway maintenance works, general notes §5.3, §5.5, §5.6, §5.8 and Appendix B stabilized-soil base mix-proportion conversion formulas;
  • DB63/T 2006-2021 Quota for highway reinforced concrete prefabricated structures §4.3;
  • TB/T 10821-2024 Railway basic (fundamental) quota manual, general notes (prices determined by the market; scope of small on-site handling, etc.);
  • SJG 181.1-2024 Consumption standard for municipal works (road works), general provisions §0.1.5 (bases for determining labour/material/machinery consumption and prices);
  • GB/T 50875-2013 Standard for construction cost terminology §2.3 (definitions of works consumption quota and material consumption).