Bill-of-quantities listing of railings, panels and handrails (GB/T 50854-2024 Annex Q table Q.3.1, code 011503) and mapping to the Beijing 2024 consumption standard quota items: glass panels, finished railings and cast-iron scroll railings, dual measurement by area and by length, and the rule that bend lengths enter the centreline length
Railing, panel and handrail decoration lists under GB/T 50854-2024 Annex Q table Q.3.1 (code 011503); material and post-cap differences go into the item description, not separate codes. Under Beijing DB11/T 2382-2024, railings (panels) are measured by area m2 at design-shown dimensions and handrails and accessibility railings by handrail centreline length m (bends included), with no addition for parts embedded in the structure; where railing / panel and handrail are installed as one unit, the railing / panel items execute and the handrail item does not. Item mapping: metal stair railings (panels) A-15-52 to A-15-61 mostly m2 (only A-15-60 accessibility railings by m), metal stair handrails A-15-62 to A-15-64 by m, hardwood handrails in the hardwood railing table A-15-67 to A-15-69 by m.
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. Q Table Q.3.1(code 011503)
- DB11/T 2382-2024 建设工程施工消耗量标准 第4.16节 其他装饰工程
- DB11/T 2382-2024 App. A Table A.15.3-1.1 / Table A.15.3-1.3 / Table A.15.3-2.1
- SJG 111.2-2022 城市地下综合管廊工程消耗量标准(Vol. 2)Ch. 5 5.1.8、5.2.4
Topic Positioning
This card sets out the bill-of-quantities listing of railings, panels and handrails, and the quota item mapping and bend-length measurement rules when building up rates under Beijing DB11/T 2382-2024 Construction Works Consumption Quota Standard - covering stainless-steel glass panels, cast-iron scroll railings, accessibility railings, metal and hardwood handrails - and compares the different position of the utility-tunnel standard.
Core Conclusions
1. Bill listing position (GB/T 50854-2024)
The item setting, item-description content, units and measurement rules for handrail, railing and panel decoration follow GB/T 50854-2024 (quantity take-off standard for building and decoration works), Annex Q "other decoration works", table Q.3.1, item code 011503 (handrail, railing and panel decoration). Table Q.3.1 sets one unified item "handrail, railing and panel decoration" with no separate codes by material (glass / stainless steel / cast iron / timber) or post-cap profile - "glass panel" and "round-cap posts" are not independent codes but item-description content: handrail and railing (panel) materials and specifications and fixing fittings are described in the item description, e.g. "d50 stainless posts (round caps) + 12 mm toughened glass panel + d75 stainless handrail". Factory-finished procurement versus site fabrication is distinguished by the corresponding sub-items of table Q.3.1.
2. Quota measurement position (Beijing DB11/T 2382-2024, section 4.16 other decoration works)
Rules, original wording:
- 4.16.3 window-guard railings follow the corresponding corridor-railing items; railings and panels of AC slabs and cantilever slabs follow the corresponding corridor railing / panel items.
- 4.16.4 where railing / panel and handrail are installed as one unit, the consumption follows the railing / panel items and the handrail item is not additionally applied.
- 4.16.10 the measurement of handrail, railing and panel decoration shall comply: 1 railings (panels) by area at design-shown dimensions, with no addition for parts embedded in the structure; 2 accessibility railings by the design handrail centreline length (bends included), with no addition for embedded parts; 3 handrails by the design handrail centreline length (bends included), with no addition for embedded parts.
Bill position does not equal quota position: bill items measure per table Q.3.1, while the Beijing quota measures railings (panels) by area m2 and handrails and accessibility railings by length m - compute both and reconcile when building up rates; do not mix.
3. Item mapping (Beijing DB11/T 2382-2024, Annex A building and decoration works)
Table A.15.3-1.1 metal stair railings (panels)
| Item code | Item name | Unit | Main material features |
|---|---|---|---|
| A-15-52 | metal railing, straight | m2 | stainless railing straight (finished) d50, without glass |
| A-15-53 | metal railing, helical | m2 | stainless railing helical (finished) d50 |
| A-15-54 | metal railing, straight | m2 | stainless straight finished d50 + toughened glass 12 mm (glass content 0.86) |
| A-15-55 | metal railing, curved | m2 | stainless railing helical (finished) d50 + toughened glass (curved) 10 mm (content 0.86) |
| A-15-56 | metal railing, straight | m2 | cast-iron scroll railing (framed) (cast-iron welding rods 0.1364 m) |
| A-15-57 | metal railing, straight | m2 | stainless railing straight (finished) d50, without glass |
| A-15-58 | metal railing, straight | m2 | stainless straight finished d50 + toughened glass 12 mm (content 0.75) |
| A-15-59 | metal railing, curved | m2 | toughened glass (curved) 10 mm (content 0.75) + stainless railing d50 |
| A-15-60 | metal railing, straight | m | accessibility railing (finished) d50 - the only railing item in this table by linear metre |
| A-15-61 | metal railing, straight | m2 | cast-iron scroll railing (framed) (cast-iron welding rods 0.1189 m) |
Note: "metal railing, straight" has several same-named bands - A-15-52, A-15-54, A-15-56, A-15-57, A-15-58, A-15-61 - differing in material outfit (with or without glass, glass thickness and content, stainless or cast iron) and labour (0.2100 to 0.4800 workday/m2); match the design specification and height, do not apply casually.
Table A.15.3-1.3 metal stair handrails (d75 stainless, unit m)
- A-15-62 stair handrail, straight: stainless handrail d75 1.0500 m/m, stainless bend d75 0.7600 No./m;
- A-15-63 stair handrail, curved: stainless handrail (curved) d75 1.0500 m/m, stainless bend d75 0.7600 No./m;
- A-15-64 corridor handrail: stainless handrail d75 1.0500 m/m, stainless bend d75 0.6600 No./m.
Table A.15.3-2.1 hardwood railings and panels (unit m)
- A-15-67 timber handrail, stair, straight: hardwood handrail (straight) 150 mm x 60 mm 1.0500 m/m, hardwood bend 0.7600 No./m;
- A-15-68 timber handrail, stair, curved: hardwood handrail (curved) 150 mm x 60 mm 1.0500 m/m, hardwood bend 0.7600 No./m;
- A-15-69 timber handrail, corridor, straight: hardwood handrail (straight) 150 mm x 60 mm 1.0500 m/m, hardwood bend 0.6600 No./m.
4. Bend-length measurement
- Rule: handrails and accessibility railings are measured on the design handrail centreline length (bends included) - bend length enters the linear metres and is not counted separately by the piece; parts embedded in the structure add nothing (DB11/T 2382-2024 clause 4.16.10 items 1 to 3).
- Consumption position: bends are not listed separately - their quantity is comprehended per metre in the item materials: stainless stair handrails (straight / curved) 0.7600 No./m, corridor handrails 0.6600 No./m; hardwood handrails (stair straight / curved) 0.7600 No./m, corridor straight 0.6600 No./m.
- Handrail stock lengths enter at 1.0500 m/m (joint wastage included); curved and straight use "curved" and "straight" materials respectively, not interchangeable.
5. Cross-standard comparison (utility tunnels)
SJG 111.2-2022 Consumption Quota Standard for Urban Utility Tunnels, Volume 2 (tunnel building and decoration works), chapter 5 decoration works:
- 5.2.4 railing and handrail quantities are computed in linear metres on the design centreline length, without deducting bend lengths.
- 5.1.8 railing and handrail item notes: (1) the railing and handrail items already comprehend the cost of non-integral handrail bends; (2) where the design material consumption differs from the item, the material quantity may be adjusted per the design, all else unchanged; (3) for curved railings and handrails, the labour and plant consumption of the corresponding items is multiplied by 1.30. Note: the tunnel standard measures "railings and handrails both in linear metres", unlike the Beijing building standard's "railings (panels) by m2, handrails by m"; the Beijing standard has no curved-factor clause - the two standards must not be cross-applied.
Applicability Boundaries
- The quota part follows Beijing DB11/T 2382-2024 for building and decoration works in Beijing; other provinces or sectors (railway TB/T 10823, urban tunnels SJG 111.2 etc.) convert under their own standards - Beijing items and contents must not be applied directly.
- The sub-item codes, item-description elements and units of bill code 011503 follow the original text of GB/T 50854-2024 Annex Q table Q.3.1; this card does not replace it.
- "One-piece installation adds no handrail item" applies only where railing / panel and handrail are installed as one unit; separately installed handrails take the handrail items (A-15-62 to A-15-64 metal, etc.).
- Straight / curved / helical, glass contents 0.86 and 0.75, d50 posts and d75 handrails are different specification bands - match the design specification and height, never across bands.
- Consumption quantities are standards; except where conversion is expressly allowed, they must not be varied for site differences (SJG 111.2 allows adjusting only material quantity where "material consumption differs from the design", all else unchanged).
- Window-guard railings and AC / cantilever-slab railings following the corridor railing (panel) items is a mapping rule already inside the quota.
Further Reading
- GB/T 50854-2024 quantity take-off standard for building and decoration works, Annex Q other decoration works, table Q.3.1 "handrail, railing and panel decoration (code 011503)": original text of item setting, item descriptions, units and measurement rules.
- DB11/T 2382-2024 Construction Works Consumption Quota Standard, section 4.16 other decoration works: 4.16.3 window-guard / AC-slab railings, 4.16.4 one-piece installation, 4.16.10 measurement of handrails, railings and panels.
- DB11/T 2382-2024 Annex A building and decoration works: table A.15.3-1.1 metal stair railings (panels) (A-15-52 to A-15-61), table A.15.3-1.3 metal stair handrails (A-15-62 to A-15-64), table A.15.3-2.1 hardwood railings and panels (A-15-67 to A-15-69).
- SJG 111.2-2022 Consumption Quota Standard for Urban Utility Tunnels, Volume 2 (tunnel building and decoration works), chapter 5 decoration works, 5.1.8 and 5.2.4.