norm resource consumption
- 01
Where material wastage is booked, and the double counting and omission tests: off-site transport and storage losses into the material unit price (price factor) versus site haulage and operation losses into the quota consumption (quantity factor), with the site warehouse / designated stockpile point as the boundary, plus a comparison of booking positions for typical work items and settlement audit checkpoints
Material wastage may enter only one of the material unit price (price fa…
TB 10801-2024 · Measures for Compilation of Design Estimates and Budgets of Railway Capital Construction Projects 第3.2.1~3.2.6条、第4.1.2条TB/T 10821-2024 · Basic Quota of Railway Engineering 总说明第四条、Ch. 5砌筑说明、附录《材料工地搬运及操作损耗率》TB 10811-2024 · Fee schedule for design estimates and budgets of capital railway works 第2.2节 Table 2.2.22026-10-25 - 02
Area-to-weight conversion of epoxy mortar (anti-corrosion mortar surfacing) quantities: the density-bridged formulas, density value paths and back-calculation of quota wastage factors
In the quotas, epoxy mortar material quantities are volumetric (m3) whil…
DB11/T 2382-2024 建设工程施工消耗量标准GB/T 50589-2010 环氧树脂自流平地面工程技术规范 第3.1.2条DB63/T 2013-2022 公路养护工程预算定额 App. C Table C.422026-10-13 - 03
Determining wastage rates of decoration materials: the quota back-calculation formula, value-determination paths, and typical values (stone/tiles/wood veneer)
Wastage rate = (norm resource consumption − net quantity) ÷ net quantity…
TB/T 10821-2024 铁路工程基本定额TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程DB11/T 2382-2024 建设工程施工消耗量标准2026-09-25 - 04
How tile/stone setting-out schemes (tile/slab layout drawings) affect wastage rates and material costs: layout rules, the quota's comprehensive determination basis and adjustable exceptions, and cutting labor coefficients
The setting-out scheme determines the actual wastage rate — the quota wa…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) App. A A.11.2 块料面层(A-11-51、A-11-53)T SZCA 5-2022《洁净工程项目定额》总则第 0.1.15 条GB/T 50905-2014 · Code for Green Construction of Building Engineering 第 8.1.1 条2026-09-25 - 05
Red-line checklist of situations where norm resource consumption must not be adjusted: no adjustment except where conversion is expressly permitted; adjusting quantity is not adjusting price
Quota norms are compiled on the basis of a rational project execution pl…
DB63/T 2013-2022 公路养护工程预算定额DB63/T 2006-2021 公路钢筋混凝土装配式结构定额TB/T 10821-2024 铁路工程基本定额2026-09-25