Deciding the relation between bell-and-spigot joints and rubber-ring joint items: joint nature (rigid cement caulked / flexible rubber ring) -> quota basis (joint inside the pipe-laying metre, or a joint item counted per piece) -> whether the ring double-charges, split by pipe material (cast iron / reinforced concrete / plastic) and quota system
Bell-and-spigot is only an end construction, never a pricing basis: cement or asbestos-cement caulked joints (oakum packing included) are rigid; rubber rings, flanged gland plus ring, and clamp plus ring are flexible. Where the joint method is written into the pipe-laying item's name or work content, it is inside the metre-priced laying - never add a 'ring joint' item; only where the quota lists joints as items (railway pipe-jacking joints PY-407~PY-414; municipal collar joints / caulking) do joints count per piece or per ten. Rings as joint auxiliaries already sit in the item's materials (ductile iron laying lists rubber ring at 0, i.e. supplied none extra); pipe main materials outside the base price price separately per the annex table - rings never charge twice.
Applicable Codes
- TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程
- TB/T 10832-2024 铁路工程预算定额 Vol. 11 给水排水工程
- SJG 181.4-2024 市政工程消耗量标准 Vol. 4 给水排水管网工程
- DB11/T 2382-2024 建设工程施工消耗量标准
- GB/T 50856-2024 通用安装工程工程量计算标准 App. K
- GB 50242-2002 建筑给水排水及采暖工程施工质量验收规范 第9.2.15条、第10.2.4条
Positioning
Answering 'is a bell-and-spigot connection just a ring-joint item?': bell-and-spigot only describes the pipe end (spigot into bell). Pricing runs two steps - joint packing nature, then whether the quota lists joints apart - plus a third check on whether the ring is already priced in the item's materials or the pipe price. For water and drainage pipe itemisation under railway TB/T 10831-2024 and TB/T 10832-2024, SJG 181.4-2024, DB11/T 2382-2024 and GB/T 50856-2024 Appendix K.
Core conclusions
1. Decision order (three steps, none skipped)
- Joint nature: cement-slurry / mortar caulked, cement caulked, asbestos-cement caulked (oakum included) = rigid; rubber ring (push-in), flanged gland + ring (type A), no-bell clamp + ring (type W), steel-bell / double-spigot ring + caulking = flexible.
- Quota basis: the joint written into the pipe-laying item's name or work content -> inside the metre-priced laying, never add any 'ring joint' item; the quota listing joints as items -> only then count joints per piece or per ten.
- Ring priced?: check the item's material column for ring consumption; whether the pipe is bought as a set (price holding the ring); the quota's annex of 'main materials outside the base price' - any one already includes it, so no second charge.
2. Joint-form decision table (pipe material and method against quota items)
| Pipe / place | Designed joint | Nature | Item (system . no.) | Unit | Joint in laying? |
|---|---|---|---|---|---|
| Bell-spigot cast iron drain (indoor, railway) | asbestos-cement up to DN50~DN250 | rigid | TB/T 10831-2024 Vol.10 FY-2233~FY-2238 | 10m | yes (work: cutting, clips, pipe and fitting erection, mixing joint materials, curing, water test) |
| Bell-spigot cast iron drain (indoor, railway) | cement up to DN50~DN250 | rigid | same FY-2239~FY-2244 | 10m | yes |
| Bell-spigot cast iron drain (indoor, railway) | rubber ring | flexible | no ring item in that volume (asbestos / cement only) | - | gap - never force the above items |
| Outdoor cast iron drain (railway) | ring joint DN75~DN250 | flexible | TB/T 10832-2024 Vol.11 PY-287~PY-291 | 10m | yes (work: inspecting and cleaning, cutting, laying, fitting rings, truing, water test) |
| Outdoor concrete drain (railway) | mortar-caulked DN200~DN600 | rigid | same PY-292~PY-297 | 10m | yes (lining, lowering, truing, levelling, hauling, cleaning joints, mixing mortar, jointing, curing, water test) |
| Outdoor RC drain (railway) | wire-mesh mortar DN600~DN3000 | rigid | same PY-298~PY-311 | 10m | yes |
| Outdoor RC drain (railway) | ring joint DN300~DN3000 | flexible | same PY-312~PY-328 | 10m | yes (lining, lowering, laying, fitting rings, truing, water test) |
| Pipe jacking (RC, railway) | steel-bell / double-spigot (ring, caulked) DN800~DN2000 | flexible | same PY-407~PY-414 (section 4, pipe-crossing, jacking joints) | 10 pcs | no (work: ring selection, cleaning, fitting rings, caulking only) -> joints count apart |
| Ductile iron (municipal supply, Beijing) | push-in / mechanical ring | flexible | DB11/T 2382-2024 App.D Table D.4.11 from D4-3-25 (DN150 up) | m | yes (work: haulage, inspecting, cutting, lining, jointing, erection, anti-pull clamps, pressure test, flushing and disinfection) |
| RC bell-spigot pipe (Beijing, 90-degree sand base) | ring joint with laying | flexible | DB11/T 2382-2024 D4-5-5 (Table D.4.26-1.1, ID 1000) | m | yes (work: sand base and bedding, haulage, laying, ring joints, water test) |
| Plastic pipe (Beijing, outdoor buried) | ring joint | flexible | DB11/T 2382-2024 D4-5-318 (Table D.4.29-1) | m | yes (materials hold rubber ring DN1800 at 0.1700 pc/m) |
| Ductile iron (Beijing, rail transit) | ring joint DN150 | flexible | G7-2-3 (Table G.7.14) | m | yes (work: inspecting, cutting, lining, rings, jointing, laying, pressure test, flushing) |
| Concrete drain joints (Shenzhen) | mortar, cast collar, flexible collar, ring (bell / tongue / steel-bell / double-spigot) | both | SJG 181.4-2024 Vol.4 1.2.12 / 1.3.7 | pc | no: joints banded by diameter and method, per actual count |
| Beijing drain laying (collar joints) | cast-concrete collar, flexible collar; flexible caulking | both | DB11/T 2382-2024 clauses 7.4.28-7.4.29 | as drawn | no: collar joints by base type and diameter as drawn; flexible caulking as drawn |
3. Measurement and anti-duplication points (verbatim)
- Railway Vol.10 / Vol.11: the pipe proper prices per 10m, the joint method living in the item name and work content, water tests included (PY-287~PY-328, FY-2233~FY-2244) - no separate joint charge; only pipe-jacking joints list per 10 pieces.
- SJG 181.4-2024: laying work 'unless stated, includes lining along trench, cleaning, inspection'; 'pipe lengths are averaged - no adjustment'; 'laying already allows trench support - no extra'; 'laying excludes fittings (tees, bends, reducers) and valves - chapter 2'; 'concrete pipe laid direct on trench subgrade: labour and plant x 1.18'; joints 'banded by diameter and method, per actual count'.
- DB11/T 2382-2024 clause 7.4.26: drain laying itemised by RC / concrete / plastic pipe and joint form, consumption holding the water test, quantity by drawn centre line, no deduction for structures; pipe in sleeves labour x 1.10. Clause 7.4.27: plastic fitting erection by ring / fusion / electrofusion methods, per drawn count (note: fittings per piece never equals joints per piece).
- DB11/T 2382-2024 clause set 6.10 (indoor): 6.10.25 indoor erection holds pressure test and flushing; 6.10.32 quantities by drawn centre line, no deduction for fittings, valves and accessories, consumption holding fitting erection; 6.10.30 disinfection-flushing labour x 1.05 (+0.10% other materials, +0.15% other plant), ball-pass test labour x 1.10 (+1.00% / +0.05%); 6.10.27 indoor rain pipes on the indoor supply items labour x 0.90, siphonic likewise; 6.10.28 electrofusion on the fusion items, the machine as the fusion machine; 6.10.26 cooling-tower piping over DN400 and VRV copper runs on the industrial-pipe items.
- GB/T 50856-2024 Appendix K Table K.1.1 (031001) notes: cast-iron sizes cover bell-spigot, ductile and flexible anti-seismic iron; composite covers plastic-aluminium, steel-plastic, aluminium-plastic and steel-frame composite; plastic covers UPVC, CPVC, PVC, PP-C, PP-R, PE, PB, ABS; places cover indoor and outdoor; quantities deduct no valves, reducers, traps, meters, expansion joints or chambers; square compensators enter the pipe quantity with fabrication in the rate; drain work includes riser rodding eyes and vent caps; all pipe work includes pressure tests (water, air, leak, water-tightness, ball, vacuum) and flushing / blowing; outdoor tie-ins serve new or extended works against existing mains - 'with medium' or 'dry', each heating tie-in covering supply and return.
4. Ring content and separate pricing
- Included (never recharge): DB11/T 2382-2024 D4-5-318 plastic laying (ring joint) materials list 'rubber ring DN1800, 0.1700 pc/m' - rings already folded into the item by joint count; D4-5-5 bell-spigot work directly includes 'rubber-ring joints'.
- Materials column 0 (no ring added): DB11/T 2382-2024 ductile iron laying (D4-3-25, D4-3-221) lists 'rubber ring 0.0000' - rings ride with the set pipe or price by the joint; never self-add by diameter.
- Main material apart, ring inside: TB/T 10832-2024 Vol.11 annex of items with main materials outside the base price holds PY-287~291, PY-292~297, PY-298~311, PY-312~328 - iron / concrete / RC pipe prices separately at current rates, while rings and joint materials sit in the item's material cost - never split pipe and ring apart to charge twice.
- Set-purchase deduction: SJG 181.4-2024 - 'where laying uses ring joints and the pipe is bought as a set (price holding the ring), ring consumption is not taken'; PCCP with open-ring limited or clamp-composite joints adds only the ring or clamp material, the rest unchanged.
5. Pipe-material distinctions
- Ductile iron (mostly pressure supply): flexible joints (push-in / mechanical rings), the item name and work already holding joints, anti-pull clamps, test and disinfection (per m) - no joint item on top.
- RC pipe (mostly gravity drains): joints rigid (mortar caulking, wire-mesh mortar, cast collar) or flexible (bell / tongue rings, flexible collar, steel bell, double spigot); the railway outdoor volume folds joints into the metre, while Shenzhen SJG and Beijing clauses 7.4.28-7.4.29 strip collar and caulking joints out per piece (as drawn) - the same bell-spigot pipe may fold or separate joints by the quota system in force.
- Plastic (UPVC etc.): indoor solvent cement is another method (adhesive and fittings in materials); outdoor buried bell-spigot rings take the ring items (ring material inside); electrofusion runs on fusion; plastic fittings by ring / fusion / electrofusion per piece are another matter from pipe joints - never mix.
Applicable boundaries
- Three bases never mix: railway Vol.10 (indoor) / Vol.11 (outdoor) fold joints into length (jacking joints apart, per 10); Beijing DB11/T 2382-2024 folds laying into metres but collar and flexible-caulking joints per drawn count; Shenzhen SJG 181.4-2024 counts concrete drain joints per actual piece. Cross-system borrowing is a wrong item; gaps take supplementary quotas.
- 'Bell / tongue / double-spigot / steel-bell' are end forms only; pricing follows packing and sealing. On one bell-spigot joint, cement caulking and ring joints are two different items.
- Indoor cast-iron drains designed with ring joints under the railway housing quota (no such item) never substitute asbestos / cement items - compile a supplement or convert by like process with approval and a trail.
- Asbestos-cement caulk health limits: GB 50242-2002 clause 9.2.15 commentary deletes it (asbestos fails drinking-water standards), recommending Portland cement of at least grade 32.5; check health rules before specifying it on supply pipes (an item's existence never licenses drinking-water use).
- Acceptance (not pricing): clause 9.2.15 - caulk cement at least 32.5MPa, dense and full, the joint face recessed into the bell edge no more than 2mm (observation and gauge); clause 10.2.4 - oakum packed dense, cement dense and full, recess no more than 2mm.
- Items and units only, no base prices or amounts; charges and prices follow the current fee standards and compilation-period rates.
Further reading
- TB/T 10831-2024 Vol.10 chapter 3 section 1 part 3(1) FY-2233~FY-2244; TB/T 10832-2024 Vol.11 chapter 3 section 2: PY-287~291, PY-292~311 with PY-312~328; section 4(2)(6) jacking joints PY-407~414; annex of main materials outside the base price.
- SJG 181.4-2024 Vol.4 notes 1.1.4 (lengths averaged, support included, subgrade factor 1.18, fittings apart, set-purchase rings); 1.2.12 joints per piece; 1.3.2 laying work; 1.3.7 concrete drain joints.
- DB11/T 2382-2024 clauses 7.4.26~7.4.31; 6.10.24~6.10.32; App.D Tables D.4.11 (from D4-3-25), D.4.26-1.1, D.4.29-1; App.G Table G.7.14.
- GB/T 50856-2024 Appendix K Table K.1.1 notes 1~11; Appendix H (direct-buried pre-insulated pipes); GB 50242-2002 clauses 9.2.15, 10.2.4 and commentary.