work items not covered by the quota manuals
- 01
Pricing when design sizes exceed the top band of budget quota items (quota gap / over-range): over-range is a gap, not a conversion; proportional extrapolation is banned; four steps - express note, top band, borrowing similar-workmanship quotas, supplementary build-up for approval
Design sizes above the quota's top band are a quota gap, not a quota con…
GB/T 51095-2015 建设工程造价咨询规范 第5.3.12条DL/T 5468-2013 输变电工程施工图预算编制导则 第4.1.4条TB/T 10832-2024 铁路工程预算定额 Vol. 11 给水排水工程 册说明2026-10-13 - 02
Quota pricing route for micro-disturbance cement mixing piles (IMS piles): workmanship classification, quota-gap determination and cement-content conversion
Micro-disturbance cement mixing piles (IMS piles) are a workmanship vari…
T/ZS 0141-2020 微扰动水泥搅拌桩设计与施工技术规程(第1.0.1、2.1.1、2.1.2、3.0.2、4.3.1、5.3.6条)TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(FY-211~FY-216)TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程(LY-251~LY-255)2026-10-10 - 03
Handling specifications beyond a quota item's largest step (over the top band): no proportional extrapolation - a four-step ladder of volume-note wording first, analogous items next, supplementary quota last
A specification over the top band is a "quota gap", not a "quota convers…
TB 10801-2024 第2.4.1~2.4.3条TB/T 10832-2024 Vol. 11 册说明 Ch. 3TB/T 10830-2024 第九册 第二章第十二节 变压器2026-09-29 - 04
Handling path for missing quota items: similar-process application -> compilation from similar-project data -> compilation from technical conditions -> approval/filing (including power and railway industry differences)
Missing quota items are handled in step-down order: (1) preferentially r…
DL/T 5468-2013DL/T 5469-2013DL/T 5464-20132026-09-25 - 05
Checklist of permitted quota-conversion situations and prohibited red lines: when conversion is allowed and how to convert
Quota conversion takes "express permission in the quota provisions" as t…
DB63/T 2013-2022 公路养护工程预算定额DB63/T 2006-2021 公路钢筋混凝土装配式结构定额TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程2026-09-25 - 06
Preparing supplementary quota items (supplementary unit-rate build-up schedules): trigger conditions, consumption measurement, base price composition, industry approval, and distinction from supplementary BOQ items
Where the budget quota norms do not cover a work item and no similar sub…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则DL/T 5591-2021 配电网工程建设预算编制导则2026-09-25 - 07
Conversion judgment and methods when a quota item's work content differs from site reality (no conversion for aggregated content; convert by difference type; supplementary valuation for missing items; "换" mark traceability)
Before converting, judge "whether conversion is allowed": content alread…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则TB/T 10831-2024 铁路工程预算定额 房屋工程2026-09-25 - 08
Decision path for selecting quota line items: item description matching -> direct application -> adjusted application -> similar construction process -> supplementary quota item submitted for approval
Applying a quota line item starts with matching "item description (work…
GB/T 50860-2024 构筑物工程工程量计算标准GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则2026-09-25 - 09
Market-inquiry pricing when no applicable quota exists: the two-step method (multi-source inquiry → labor/material/machinery pricing) and traceability/audit requirements
A missing quota does not mean missing pricing rules: the all-in unit rat…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 10
Quota borrowing rules: other industry/specialty quotas may be borrowed for missing items; cross-region borrowing is limited to exceptions (railway station buildings, power review verification, etc.)
Borrowing quotas of other industries/regions for missing items is a legi…
DL/T 5468-2013DL/T 5591-2021DL/T 5464-20132026-09-25