Engineering Knowledge Cards.
Confidence HighUpdated 2026-09-25

Quota borrowing rules: other industry/specialty quotas may be borrowed for missing items; cross-region borrowing is limited to exceptions (railway station buildings, power review verification, etc.)

Borrowing quotas of other industries/regions for missing items is a legitimate step-down path, subject to triple constraints: (1) process similarity with priority to one's own industry quota; (2) fees follow the borrowed quota system (per the corresponding industry authority's provisions; mixing fee regimes is prohibited); (3) procedural records (power verifies at budget review; railway files a copy with the industry standard administration agency). Cross-region borrowing is inapplicable by default, with express exceptions: railway passenger station buildings etc. may borrow the provincial local quota at the project location (with matching labor/material/machinery prices and fee quotas), and power may directly reference and apply local quotas.

Applicable Codes

  • DL/T 5468-2013
  • DL/T 5591-2021
  • DL/T 5464-2013
  • DL/T 5465-2013
  • TB 10801-2024
  • DB63/T 2013-2022
  • GB/T 51095-2015

Topic Positioning

Answers "whether quotas of other specialties or other regions can be borrowed": the legality, exception paths, and three iron rules of cross-industry/cross-region borrowing for missing items.

Core Conclusions

(1) Cross-industry/specialty borrowing has an express basis: power transmission/transformation may reference and apply local or other-industry quotas, verified at budget review (DL/T 5468-2013 §4.1.12); distribution networks follow the step-down "similar process in the industry -> similar process of other industries/localities -> supplementary compilation from similar data -> supplementary compilation from technical conditions" (DL/T 5591-2021 §4.1.10); highway maintenance missing items may adopt JTG/T 3832 or other specialty quotas (DB63/T 2013-2022 §5.12). (2) Cross-region borrowing is inapplicable by default, with express exceptions: railway passenger station buildings, canopies, and overpasses may adopt the provincial local quota at the project location, with matching labor/material/machinery prices and fee quotas (TB 10801-2024 §2.4.2); power may directly reference and apply local quotas. (3) Three iron rules: process similarity without forcing; fees follow the borrowed quota system per that industry authority's provisions (DL/T 5465-2013 §4.1.3) — mixed fees are a must-check audit item; procedural records — power verifies at budget review, railway files with the industry standard administration agency.

Applicable Boundaries

Limited to missing-item scenarios with no applicable sub-item in one's own industry; borrowing is limited to similar-process sub-items, not wholesale volume adoption; labor/material/machinery prices follow the borrowed quota's matching system without mixing with local prices; current effective versions must be used.

Further Reading

DL/T 5468-2013 §4.1.12, §4.1.4; DL/T 5591-2021 §4.1.10; DL/T 5464-2013 §4.1.3, §4.1.5; DL/T 5465-2013 §4.1.3; TB 10801-2024 §2.4.2-2.4.3; DB63/T 2013-2022 §5.12; GB/T 51095-2015 §5.3.12 (compiling supplementary unit-price tables when no similar sub-item exists).

Keywords