Building the contractor's in-house norms and actual-consumption databases: division of labour between the two databases, the consumption fact-table model, and the self-growth loop

The contractor's in-house norms database and the actual-consumption database have a "finished product - raw material" relationship: first collect real actual consumption per the consumption fact table (project identifier + process granularity + labour/material/machinery detail + time + source + comparison against budget quantities), then refine it into the contractor's in-house norms through sample cleaning and statistics, for use in tender (priced offer) and cost management; relying on smart-site automatic collection, a "collect -> refine -> apply -> review" self-growth loop forms; the two calibres — quota line item content (content per quota unit) and BOQ actual consumption (not divided by quantity) — must never be confused.

Applicable Codes

  • T/ZBD 100.1-2022 建设工程造价数据建设通用标准
  • GB 50501-2007 水利工程工程量清单计价规范
  • GB/T 50875-2013 工程造价术语标准
  • DB37/T 5161-2020 建设工程造价数据交换及应用标准
  • DB11/T 513-2018 绿色施工管理规程

Topic Positioning

How a construction enterprise systematically builds the "contractor's in-house norms database + actual-consumption database": division of labour between the two, the consumption fact-table data model, collection-channel priority and the quota norms compilation route, ultimately forming the self-growth loop of "collect -> refine -> apply -> review".

Core Conclusions

The two databases have a "raw material - finished product" relationship: the actual-consumption database records the actual-consumption facts of each project × process × labour/material/machinery, while the contractor's in-house norms database is the refined consumption standard (GB 50501-2007, Clause 2.0.8: formulated per the contractor's own construction technology, production efficiency, and management level, for tender (priced offer) and cost management; GB/T 50875-2013, Clause 2.3.3). The core of the consumption database is a consumption fact table: project identifier (project/position/BOQ code) + process granularity (e.g., bored piles split into hole forming -> rebar cage fabrication and placing -> pouring -> post-grouting -> pile head cropping; only process-level accumulation can feed quota line items) + labour/material/machinery detail (code/specification/quantity/unit) + time + source (collection method traceable) + comparison fields (budget/norm resource consumption, supporting actual-vs-budget comparison). Collection-channel priority: smart-site/IoT automatic collection (first choice, data needs no correction) > ERP material requisition/return back-calculation > construction logs/work tickets > process acceptance records. Calibres must be kept distinct (DB37/T 5161-2020, Clause 4.2.24): quota line item labour/material/machinery content = the content per one quota unit; BOQ actual consumption = the actual labour/material/machinery quantities, not divided by the BOQ quantity. Quota norms (prescribed resource consumption standards) compilation in three steps: sample aggregation and cleaning -> consumption statistics (the traditional "average-advanced level" needs manual work-study/time-study measurement; the big-data route directly computes statistics of actual data, without averaging, synthesis, step sizing, or margin-differential treatment) -> calibration against local quota norms.

Applicable Boundaries

Applies to construction and cost-consultancy enterprises building their own cost-management foundation data, premised on a stable collection mechanism (smart site/ERP or standardised paper ledgers). The big-data route depends on real data sources; without automated collection, it must be supplemented by manual work-study and time-study methods. The contractor's in-house norms reflect the contractor's actual level and must not be mixed with local consumption quotas (resource norms) of the social-average level; tender (priced offer) may be compiled with the contractor's in-house norms plus market price information per GB/T 50500-2024, Clause 6.2.1.

Further Reading

T/ZBD 100.1-2022 "General standard for construction cost data development" Clause 4.2.6 (layering of comprehensive/design-control/transaction indicators), Clause 5.2.8 (content of construction-enterprise cost-management data), Clauses 6.4.5/6.5.7 (smart-site collection, application of quota norms in labour and material planning and supply-chain management), Sections 7.2~7.3 (data maintenance and dynamic adjustment); GB 50501-2007 Clause 2.0.8; GB/T 50875-2013 Section 2.3; DB37/T 5161-2020 Clause 4.2.24; DB11/T 513-2018 Clause 5.4.4 (actual-vs-budget consumption comparison control).