supplementary unit-rate build-up schedules
- 01
Re-derivation of the all-in unit rate when a changed construction method makes the quota machine-shift consumption inapplicable: the three-path quota conversion test, the hierarchy of bases for recalculating plant consumption, the requirements for recasting the all-in unit rate analysis sheet, and the procedure for confirmation by the employer
Changes of construction method and plant usage are factors expressly lis…
GB/T 50500-2024 建设工程工程量清单计价标准 第8.9.1条、第8.9.6条、第8.10.2条、第8.10.3条、第8.1.2条、第8.1.3条、第2.0.9条、第6.2.1条、第6.2.12条、第6.2.13条及App. EGB/T 51095-2015 建设工程造价咨询规范 第5.3.2条、第5.3.9条、第5.3.12条及App. CGB/T 50875-2013 工程造价术语标准 第2.3.3条、第2.3.5条、第2.3.6条2026-10-25 - 02
Pricing when design sizes exceed the top band of budget quota items (quota gap / over-range): over-range is a gap, not a conversion; proportional extrapolation is banned; four steps - express note, top band, borrowing similar-workmanship quotas, supplementary build-up for approval
Design sizes above the quota's top band are a quota gap, not a quota con…
GB/T 51095-2015 建设工程造价咨询规范 第5.3.12条DL/T 5468-2013 输变电工程施工图预算编制导则 第4.1.4条TB/T 10832-2024 铁路工程预算定额 Vol. 11 给水排水工程 册说明2026-10-13 - 03
Quota pricing route for micro-disturbance cement mixing piles (IMS piles): workmanship classification, quota-gap determination and cement-content conversion
Micro-disturbance cement mixing piles (IMS piles) are a workmanship vari…
T/ZS 0141-2020 微扰动水泥搅拌桩设计与施工技术规程(第1.0.1、2.1.1、2.1.2、3.0.2、4.3.1、5.3.6条)TB/T 10831-2024 铁路工程预算定额 Vol. 10 房屋工程(FY-211~FY-216)TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程(LY-251~LY-255)2026-10-10 - 04
Handling specifications beyond a quota item's largest step (over the top band): no proportional extrapolation - a four-step ladder of volume-note wording first, analogous items next, supplementary quota last
A specification over the top band is a "quota gap", not a "quota convers…
TB 10801-2024 第2.4.1~2.4.3条TB/T 10832-2024 Vol. 11 册说明 Ch. 3TB/T 10830-2024 第九册 第二章第十二节 变压器2026-09-29 - 05
Audit of pricing by applying quota line items: identifying over-application, misapplication, and duplicate application via the three-way comparison
Identify problems of pricing by applying quota line items using the "thr…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则DBJ51/T 048-2015 四川省建设工程造价电子数据标准2026-09-25 - 06
Preparing supplementary quota items (supplementary unit-rate build-up schedules): trigger conditions, consumption measurement, base price composition, industry approval, and distinction from supplementary BOQ items
Where the budget quota norms do not cover a work item and no similar sub…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则DL/T 5591-2021 配电网工程建设预算编制导则2026-09-25 - 07
Conversion judgment and methods when a quota item's work content differs from site reality (no conversion for aggregated content; convert by difference type; supplementary valuation for missing items; "换" mark traceability)
Before converting, judge "whether conversion is allowed": content alread…
GB/T 51095-2015 建设工程造价咨询规范DL/T 5468-2013 输变电工程施工图预算编制导则TB/T 10831-2024 铁路工程预算定额 房屋工程2026-09-25 - 08
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-con…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25