Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-25

Separating conduit, trunking wiring and cable laying in the BOQ: GB/T 50856-2024 Annex D codes (030412/030409) against the 2013 old codes (030411/030408), a three-column comparison of object measured x unit x item description, the tests for splitting conduit and cable segments of one circuit, and the quota chapter mapping

Under the 2024 edition, 'electrical conduits and trunking' are itemised under 030412 (Table D.12.1) and 'cable laying' under 030409 (Table D.9.1); the 2013 old codes 030411 (conduit and wiring) and 030408 (cable installation) have been rearranged - 030411 is now overhead power distribution lines of 10kV and below and 030408 is trolley conductor rail installation - so retaining the old codes is a BOQ error. All three are measured in 'm' but on different bases: conduit by conduit length (no deduction for junction boxes, luminaire boxes, switch boxes, socket boxes and pull boxes along the run), wiring by single-wire length including reserves, and cable by single-cable length including reserved and additional lengths; the dividing criterion is the conductor form (insulated wires in conduit or trunking versus the cable itself), not the routing.

Applicable Codes

  • GB/T 50856-2024 通用安装工程工程量计算标准 App. D Table D.12.1(配管、配线,code 030412)、Table D.9.1(电缆安装,code 030409)、Table D.8.1(滑触线装置安装,code 030408)、Table D.11.1(10kV及以下架空配电线路,code 030411)、Table D.17.3-1~Table D.17.3-8(预留长度及附加长度)
  • GB 50856-2013 通用安装工程工程量计算规范 Table D.8(电缆安装,code 030408)、Table D.11(配管、配线,code 030411)(已被 GB/T 50856-2024 替代)
  • GB/T 50857-2024 市政工程工程量计算标准 App. H Table H.4.1(配管、配线工程,code 040804)
  • DB11/T 2382-2024 建设工程施工消耗量标准 第6.4节 Ⅸ电缆(6.4.54~6.4.67)、Ⅻ配管、配线(6.4.103~6.4.114)、Table 6.4.55、Table 6.4.112

Topic scope

Resolving the questions of electrical quantity take-off most prone to crossed items: how conduit for wiring (protective conduit carrying insulated wires), trunking wiring (incl. wire drawn into conduit) and cable laying are separated and coded in the BOQ and the quotas, how the quantities are measured, and how the conduit segments and cable segments of one circuit are split.

Core conclusions

1. Correct the codes first: the 2013 codes were rearranged in the 2024 edition

The codes of Annex D (electrical equipment installation works) were wholly rearranged between GB 50856-2013 and GB/T 50856-2024; current projects must be itemised under the 2024 edition:

BOQ item GB 50856-2013 (superseded) GB/T 50856-2024 (current)
Cable installation Table D.8, code 030408 Table D.9.1, code 030409
Conduit and wiring Table D.11, code 030411 Table D.12.1, code 030412
What 030408 now covers - trolley conductor rail installation (Table D.8.1)
What 030411 now covers - overhead power distribution lines of 10kV and below (Table D.11.1)

That is: current 'electrical conduits' and 'trunking' fall under 030412, current 'cable laying' under 030409; using the old codes 030411/030408 on a new project is a BOQ error (the codes now point to entirely different items). Municipal works have a separate coding system: GB/T 50857-2024 Table H.4.1 conduit and wiring works is 040804, not to be mixed with the installation works code 030412.

2. Comparison of the three BOQ items (GB/T 50856-2024 Annex D)

Dimension Conduit (030412, Table D.12.1) Trunking / tray plus wiring (under 030412) Cable laying (030409, Table D.9.1)
Object measured the protective conduit itself: set-screw (JDG) conduit, galvanised steel pipe, explosion-proof conduit, flexible metal conduit, plastic conduit, metal hose, corrugated conduit, KBG press-fit steel conduit etc. (a) trunking and tray bodies; (b) conductors as insulated wires (wire in conduit, insulator wiring, trunking wiring, sheathed wiring, exposed insulated wiring, workshop wiring etc.) the cable itself (incl. removing and replacing covers), split into power cables and control cables
Unit m trunking / tray in m; wiring in m (single-wire length) m (single-cable length)
Measurement rule by length as shown on the design drawings, with no deduction for junction boxes, luminaire boxes, switch boxes, socket boxes and pull boxes along the run; boxes counted separately as units trunking and tray by length, no deduction for bends and tees; wiring by single-wire length including reserved lengths (entries into boards, cabinets and panels per Table D.17.3-8) by length as shown on the drawings, including reserved and additional lengths (reserve values per Table D.17.3-5; external entries and exits of panels, boxes and cabinets per Table D.17.3-3)
Item description essentials name, material, specification, arrangement (exposed / concealed / above ceilings / on steel supports / on steel ropes / buried / underwater / in tanks and vessels / in masonry ducts), earthing requirements trunking and tray: name, material, specification; tray also type and earthing method (bonding jumper earthing / dedicated earth-clip earthing); wiring: name and form of wiring (along ceilings / along supports / along steel ropes / along roof trusses / along beams / along columns / along walls / across trusses / across beams / across columns / across line racks / across street racks etc.), model and specification, jointing method of the wires (connector jointing / twist-and-tin soldering) name, model, specification, material, voltage (kV), laying method (direct burial / in cable trenches (tunnels) / in duct banks / indoors / in riser shafts), laying method of the cable protective conduit (above ground / below ground)

3. Splitting conduit segments and cable segments within one circuit

The criterion is the conductor form and its carrier, not the routing:

  1. Insulated wires (BV, BVR, sheathed wires etc.) drawn into protective conduit or trunking -> split into two items: the carrier (conduit, trunking, 030412) plus the wires (wiring, by single-wire length); the wires are measured by single-wire length for each conductor, not as one circuit length at a stroke.
  2. A cable proper, insulated and sheathed and made up into a cable -> measured wholly as cable laying 030409, whether drawn into conduit, run on tray, direct-buried or in a riser.
  3. Local protective conduit for a cable does not go to 030412 conduit: the protective conduit of a cable sleeve entering a building is coded as 'connecting short conduit' under D.12 conduit and wiring; cable branch boxes are coded as 'terminal boxes' under D.5 low-voltage electrical equipment installation.
  4. Cable trays and cable trunking are not itemised with the cable: code them under the corresponding items of D.12 conduit and wiring (tray and trunking all sit on the 030412 side).
  5. Chasing and groove cutting needed for conduit are coded under the corresponding items of Annex N (other and ancillary works) and are not merged into conduit length.

4. Measurement and itemisation details prone to confusion

  • Junction and pull box additions (where the design is silent, measure by this): add junction and pull boxes where the run exceeds 40m without a bend, 30m with one bend, 20m with two bends, 10m with three bends; on vertical runs add pull boxes for fixing the wires where the conductor section is 50mm2 or below every 30m, 70~95mm2 every 20m, 120~240mm2 every 18m. Quota practice often differs from the national BOQ (e.g. Beijing DB11/T 2382-2024 Clause 6.4.110 takes 30m/20m/15m/8m); price by the standard in force.
  • Switch boxes and socket boxes are coded as junction boxes, with no separate items.
  • Conduit runs left without wires get a separate wire-drawing item.
  • Wiring reserves: entries of wiring into boards, cabinets and panels per Table D.17.3-8; on the consumption-standard side by single-wire length including reserves (e.g. Beijing 6.4.112 and its table: all boards, cabinets, panels by height plus width; starters and busway entry boxes installed alone (without panel) 0.30m; from the ground-level conduit outlet to power connection boxes 1.00m; connection of the supply to the wires in the conduit 1.50m; outgoing lines 1.50m; all measured from the conduit mouth or the centre of the item installed).
  • Cable reserves: slack, waviness and crossings at 2.5% of the total cable length; entering a building 2m; entering a trench or rising from a bracket (up or down) 1.50m; substation incoming and outgoing lines 1.50m; power cable terminations 1.50m; 2m each side of a joint box; panels, boxes and cabinets by height plus width; to a motor 0.50m (from the junction box); to a works transformer 3m (from ground level); around beams and columns as measured; lift cables and the fixing points on cable racks 0.50m each (Beijing Table 6.4.55 as an example; where the design specifies, follow the design).

5. Quota line item mapping

Taking Beijing DB11/T 2382-2024 Section 6.4 (electrical equipment installation works) with its two chapters: IX Cables (6.4.54 to 6.4.67: cable laying, rigid and flexible mineral-insulated cables, pre-branch cables, cable terminations, cable protective conduit, sand bedding and brick covers, cable trenches etc.) and XII Conduit and Wiring (6.4.103 to 6.4.114: conduit, trunking, tray, wiring, junction boxes, pull boxes, waterproof bends). Pricing points: conduit plus wires go to the conduit and wiring chapter, the cable body plus terminations to the cable chapter; tray and trunking go to the conduit and wiring chapter and the installation items already include support installation (fabricated supports priced separately for their fabrication); where the main structure of a steel tray is over 3mm thick, the labour and tools of the steel tray item are multiplied by 1.20, and stainless steel tray is priced at 1.10 times the steel tray item; laying of five-core power cables is multiplied by 1.15, single-core and aluminium (aluminium alloy) cables by 0.67, and the labour for laying in vertical shafts by 1.30. In the wiring chapter, conductors above 4mm2 on lighting circuits are priced under the power circuit items; the wire-drawing consumption already includes the reserved lengths and the joint lengths at luminaires, switches, sockets and buttons, which may not be listed again.

Applicable boundaries

  • The codes and item splits follow GB/T 50856-2024 Annex D; the 2013 codes are historical reference only and must not be used to itemise new projects.
  • Where a BOQ item has no matching quota line item, apply the volume of the consumption or budget quota in force; the codes and chapter numbers of the two systems do not interchange; local standards may differ on pull-box spacings, factors and reserve values - always price by the current standard of the project location.
  • This card covers conduit, wiring and cables of building electrical (power) works below 10kV; municipal street lighting goes to the 040804 series of GB/T 50857-2024 Annex H and is measured separately.
  • Cables of fire-alarm linkage and of structured cabling follow the specialist volumes and are not coded by this card.

Further reading

  • GB/T 50856-2024 Annex D: Table D.12.1 (conduit and wiring, code 030412) with its notes (conduit names and arrangements; wiring names and forms; junction and pull box addition rules; switch and socket boxes coded as junction boxes; chasing and groove cutting under Annex N; tray earthing methods and wire jointing methods); Table D.9.1 (cable installation, code 030409) with its notes (laying methods of protective conduit; cable sleeves entering buildings coded as connecting short conduit; cable trays and trunking coded under D.12; cable branch boxes coded as D.5 terminal boxes; classes of laying method); Tables D.17.3-1 to D.17.3-8 (reserved and additional lengths: cables in Table D.17.3-5, wiring entries into boards, cabinets and panels in Table D.17.3-8, external entries and exits of panels, boxes and cabinets in Table D.17.3-3).
  • Historical edition: GB 50856-2013 Table D.8 (cable installation, 030408), Table D.11 (conduit and wiring, 030411).
  • Municipal basis: GB/T 50857-2024 Annex H, Table H.4.1 (conduit and wiring works, code 040804).
  • Consumption / quota basis: DB11/T 2382-2024 Section 6.4, IX Cables (6.4.54 to 6.4.67), XII Conduit and Wiring (6.4.103 to 6.4.114), and Tables 6.4.55 and 6.4.112.

Keywords