Quality control of AI-generated budgets: a systematic framework against quota misapplication and quantity omissions

Preventing quota misapplication relies on "verifying quota codes back against the database + two-way checking of item characteristics against sub-items + the work-content inclusion principle + locking a single pricing basis"; preventing quantity omissions relies on three lines of defense: "mandatory calculation rules + item-list completeness (drawing cross-check / characteristic deduction / appendix checklist) + cross-footing verification" — defenses set item by item against the three hallucination sources of AI: fabricated codes, cross-version mixing, and plausibly imagined missing items.

Applicable Codes

  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
  • GB/T 50500-2024 建设工程工程量清单计价标准
  • GB 50860-2013 构筑物工程工程量计算规范
  • GB/T 51095-2015 建设工程造价咨询规范

Topic Positioning

A quality-control framework for AI-generated budgets: targeting the three inherent defects of large models — fabricated quota codes, cross-version/cross-industry mix-ups, and omissions based on plausible imagination — it provides actionable rules against quota misapplication and quantity omission, applicable when using AI to compile cost documents or when reviewing AI output.

Core Conclusions

Six rules against misapplication: (1) verify quota codes back against the database for "existence + correct sub-volume + correct version"; anything unfindable is rejected (AI most easily outputs plausibly looking fake codes). (2) Item description (work item specification) is the sole criterion for pricing by applying quota line items; the description must be standardized, concise, accurate, and complete (GB/T 50854-2024, Clause 4.1.2); any change in position/material/specification/strength grade may require a different sub-item. (3) Apply the work-content inclusion principle — the calculation-standard appendix lists only main processes, and auxiliary content such as machinery relocation and material transport is already included; included processes must not be listed as separate sub-items (e.g., formwork must not be listed separately for cast-in-place concrete). (4) Lock a single pricing basis (data_source) before compilation; the whole document uses one source, and mixing old/new versions or cross-industry application is forbidden. (5) Execute note-based conversions (thickness/strength/haul-distance adjustments) per the quota book's explanatory notes; AI often ignores notes and applies the base price directly. (6) For missing items, compile supplementary unit-rate build-up schedules instead of forcing a near-match sub-item. Three lines of defense against omissions: (1) mandatory calculation rules — quantities are calculated per the rules of the corresponding calculation-standard appendix (mandatory provision of GB 50860-2013, Clause 4.2.5); first confirm the BOQ-net-quantity versus quota-with-loss caliber and keep it uniform throughout; (2) item-list completeness — check drawing by drawing (anything in the drawings but not the list is an omission), derive mandatory items from the item description (bedding, leveling, waterproofing, scaffolding, vertical transport), and tick off against the appendix's divisional/sub-divisional tables; (3) cross-footing verification — cut-fill balance, formwork area matching exposed member area, rebar content ranges, standard-floor consistency, and unit price x quantity = total price.

Applicable Boundaries

Applies to AI-involved compilation or review of construction-drawing budgets and bills of quantities (mainly building works). Cross-footing indicators are empirical reference values; anomalies are only suspicion signals requiring item-by-item re-check. Industry/regional quota volumes and sub-item contents differ; the currently valid version governs. The 2024 calculation standards have become recommended; the quantity-takeoff caliber is consistent with the spirit of the 2013 mandatory provisions, and version confirmation takes priority over all operations.

Further Reading

GB/T 50854-2024 "Standard for measurement of building and decoration works" Clause 4.1.2 (item description and work content); GB/T 50500-2024 "Standard for valuation of construction works by bill of quantities" Clause 4.1.7 (BOQ compilation rules); GB 50860-2013 "Code for measurement of constructional works" Clause 4.2.5 (mandatory: quantities per appendix calculation rules); GB/T 51095-2015 "Code for construction cost consultancy" Clauses 5.1.5 and 5.3.8 (review methods and cross-footing re-check).