construction-drawing based budget (pre-tender estimate)
- 01
Content composition of budget preparation notes and the path to automatic generation (six elements + structured field mapping)
Preparation notes have six universal elements: project overview, basis o…
DL/T 5591-2021 20kV及以下配电网工程建设预算编制导则DB42/T 823—2021 建设工程造价咨询质量控制规范DBJ/T 15-153-2019 广东省建设项目全过程造价管理规范2026-09-25 - 02
Determining quantities where drawing dimensions are incomplete: three-tier fallback plus provisional quantities at the tender/preparation stage; re-measurement plus five-tier progressive determination at the settlement stage
Where drawings are incomplete, quantities are determined along two track…
GB/T 50500-2024 建设工程工程量清单计价标准GB 50861-2013 城市轨道交通工程工程量计算规范T/ZBD 100.4-2023 建设工程造价鉴定作业指引2026-09-25 - 03
Overview of engineering budget preparation and review: the seven-step preparation workflow and the three-layer review framework
The construction-drawing based budget (pre-tender estimate) is a pre-con…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50875-2013 工程造价术语标准DB42/T 823-2021 建设工程造价咨询质量控制规范2026-09-25 - 04
What the "approved (validated) documents" point to in the basis of the highway revised estimate: for a revised estimate, the preliminary-design approval document (JTG 3830-2018 Clause 2.2.1 item 4)
Verbatim from Clause 2.2.1 item 4 of JTG 3830-2018 "Measures for compili…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第2.2节JTG 3820-2018 · Measure for Compilation of Investment Estimates of Highway Construction Projects2026-09-25 - 05
Approved design estimate (approved cost ceiling) as the investment ceiling of highway works construction projects under the 2018 system: JTG 3830-2018 general provisions Clauses 1.0.1-1.0.9 (status of preliminary estimates and budgets, scope, and the control chain)
Per the general provisions of JTG 3830-2018《administrative compilation r…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第 1 章总则(第 1.0.1~1.0.9 条)2026-09-25 - 06
Relationship between railway estimates and budgets and the over-estimate red line: construction-drawing budgets (investment verification) must not exceed approved preliminary-design estimates (TB 10801-2024; MOR Decree No. 26; GB/T 51095-2015; State Council Decree No. 712)
The two railway cost documents are successive links of one investment-co…
TB 10801-2024 铁路基本建设工程设计概(预)算编制办法TB 10811-2024 铁路基本建设工程设计概(预)算费用定额铁道部令第26号 铁路建设工程勘察设计管理办法2026-09-25 - 07
Variance analysis between the construction-drawing based budget (pre-tender estimate) and the winning tender budget: a five-step method (total price → cost composition → item-by-item all-in unit rates → attribution → conclusions)
The two budgets share the same quantities (both measured per the tender…
GB/T 51095-2015 建设工程造价咨询规范GB/T 50500-2024 建设工程工程量清单计价标准GB/T 50875-2013 工程造价术语标准2026-09-25