Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-16

Pricing and member-wise itemisation of stone balustrades (granite balustrades): the basis test, the post / panel / sill items and their measurement rules

Stone balustrades route by works basis first: landscape / scenic and antique-style balustrades (posts + panels + continuous sill as grouped stonework) take Beijing 2024 antique volume B.2 stonework (B-2-15 to B-2-19) or landscape volume E.3.3-10 / 11; modern stone panels of stairs, corridors and outdoor platforms take building volume A.15.3-7. Member-wise measurement: sill stones by length m (landscape) or volume m3 (antique); posts by size per piece; Xunzhang and Luohan panels by drawn height x base length in m2; drum-end stones by base length x mean height in m2. BOQ itemisation per GB/T 50855-2024 Table B.2.1 (code 020202) or GB/T 50854-2024 Table Q.3.1 (code 011503).

Applicable Codes

  • DB11/T 2382-2024 建设工程施工消耗量标准
  • GB/T 50855-2024 仿古建筑工程工程量计算标准
  • GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准
  • GB/T 50858-2024 园林绿化工程工程量计算标准

Scope of the question

Pricing and itemised measurement of stone balustrades (granite / bluish-white stone): how to test the works basis (landscape, antique or building volume), which items the sill, posts and panels take, the units and rules, and the BOQ code correspondence.

Core conclusions

1. Test the basis first (a wrong route mis-measures per-piece items by the metre or merges members)

  1. Landscape / scenic and antique-style balustrades (posts + panels + continuous sill, grouped stonework): antique buildings take Beijing 2024 antique volume B.2 stonework (B-2-15 to B-2-19); landscape greening takes the landscape volume E.3.3-10 / 11 series.
  2. Modern stone panels of stairs, corridors and outdoor platforms (modern practice): building and decoration volume A.15.3-7 stone handrails and balustrades.
  3. Cross-standard note: GB/T 50858-2024 Table B.1.1 note 3 - sill stones, stone posts, stone rails, stone panels, handrails and drum ends itemise per the relevant codes of GB/T 50855.

2. Member items and units (DB11/T 2382-2024)

  • Sill stones (ground sills): landscape E-3-115 bluish-white sill by length m; antique B-2-15 sill by volume m3, B-2-16 sill per piece.
  • Sumeru-pedestal bases: brick pedestals follow the brick miniature items (8.4.2); the antique volume sets independent pedestal items by m3.
  • Masonry / concrete bases with stone capping: masonry by volume, capping by drawn area m2 (8.4.8).
  • Posts: landscape E-3-135 to E-3-137 bluish-white posts (height up to 1.1 / 1.2 / 1.3 m), ramps E-3-138 to E-3-140 inclined posts, unit per piece.
  • Panels: landscape E-3-127 to E-3-132 Xunzhang panels (length up to 1.2 / 1.4 / 1.6 m), E-3-133 / E-3-134 Luohan panels, unit m2; antique B-2-17 Xunzhang, B-2-18 Luohan, B-2-19 (drop plates, wrapped corners), all m2.
  • Drum-end stones: landscape E-3-141 panel drum ends, m2.
  • Handrails (where separate): building A-15-79 marble panel stairs curved (m2), A-15-80 corridors straight (m2) and like stone handrail / panel items, by m or m2.

3. Rule texts (key figures kept)

  • Article 5.3.8: sills by drawn volume; posts per size per drawn count; Xunzhang and Luohan panels by drawn height x base length in area; drum ends by base length x mean height in area.
  • Article 5.3.7 (platforms and steps): platform edging by volume, column-base notches undeducted; steep skirts, earth liners, corner heads and column-base stones by volume; pierced column-base stones per count; steps and ramp stones by horizontal projection; sill-cushion, door-threshold and centre stones by volume; independent pedestals by volume; pedestal platforms by vertical projection.
  • Landscape articles of the same basis (8.3.24, 8.3.29-8.3.31): bridge-edge stones, bearer stones, sills and step stones by drawn length; bridge stone panels by drawn base length x height in area; bridge stone posts per drawn count; bridge panel drum ends by base length x mean height in area.

4. BOQ itemisation (two systems)

  • Stonework basis (antique / landscape): GB/T 50855-2024 Table B.2.1 balustrades (code 020202) in four - sills by volume, posts per piece, panels by vertical projection m2, drum ends per piece; post heads in geometric, dragon-phoenix, lotus, plain or lion forms; panels in openwork, Xunzhang and Luohan forms.
  • Modern building basis: GB/T 50854-2024 Table Q.3.1 handrails, balustrades and panels (code 011503).

Applicability limits

  • The item numbers are Beijing DB11/T 2382-2024; other provinces differ in numbers and banding (e.g. Hunan 2025 antique stonework measures posts, panels, rails and sills by volume, finished sets by length, and steps, edge, lock and hanging-belt stones by top projection). The BOQ codes are national (GB/T 50855 / 50854).
  • The same member differs by volume: sills by length m in the landscape volume, by volume m3 in the antique - take the basis of the volume actually executed, never mixed.
  • Posts band by height, panels by length - match the actual size; no cross-band up-rating.
  • BOQ (codes) and quota (local items) quantities run in parallel.
  • Whether pedestals, drum ends and handrails itemise alone follows the design; unstated sizes of stonework fittings follow the appendix reference tables.

Further reading

  • GB/T 50855-2024 Appendix B Table B.2.1 (020202), B.8.4 post-head forms, B.8.5 panel forms.
  • GB/T 50854-2024 Appendix Q Table Q.3.1 (011503).
  • GB/T 50858-2024 Appendix B Table B.1.1 (050201) note 3.
  • DB11/T 2382-2024 Articles 5.3.7-5.3.8, 8.3.24 and 8.3.29-8.3.31; Appendix B B.2.2 (B-2-15 to B-2-19); Appendix E E.3.3-10.3 (E-3-115), E.3.3-11 (E-3-127 to E-3-141); Appendix A Table A.15.3-7 (A-15-79, A-15-80).
  • Hunan 2025 antique building consumption standard, stonework notes and rules.

Keywords