Unitized curtain-wall quota compilation logic: framing included in factory-finished panels — why installation items contain no profiles — and application and price-adjustment points
Unitized curtain-wall quotas are compiled as "factory-finished panels + site installation": the framing is fitted into the panels at the factory, so the installation item's material list contains only connectors/sealant/glass etc. — the absence of profiles is normal, the framing cost being included in the finished-panel price or in a separately listed "panel fabrication" item; whether the glass is included in the finished price must be checked against the item's material list (if listed separately, its price difference can be adjusted). In application, sheet-curtain-wall framing items must not be applied again (duplicate pricing); channel embeds are listed by piece and T-bolts by set, and panel transport is mostly priced by mutual agreement.
Applicable Codes
- DB34/T 3752-2020 既有建筑幕墙安全性鉴定技术规程
- DB11/T 2382-2024 建设工程施工消耗量标准(北京)
- 湖南2025 房屋建筑与装饰工程消耗量标准
- JGJ 102 玻璃幕墙工程技术规范
Topic Positioning
Explains the compilation logic of unitized curtain-wall quotas: why the installation item's material list has no framing, how framing and glass are priced, and application and price-adjustment points. Applies to unitized curtain-wall item pricing and audit under the various consumption quotas.
Core Conclusions
Unitized curtain-wall quotas are compiled as "factory-finished panels + site installation": the framing is fitted into the panels at the factory, so the installation item contains only connectors, sealant, glass, etc. — the absence of profiles is normal: the framing is included in the finished unit-panel price, or in a separately listed "panel fabrication" item (the Shaanxi consumption quota consultation draft splits items 12-190 fabrication and 12-191 installation, the fabrication item containing about 1945 kg of aluminum profile per 100 sqm). Whether glass is included in the finished price must be checked in the item's material list: if listed separately, the price difference can be adjusted (e.g., Beijing DB11/T 2382-2024 A-12-290 lists 1.03 sqm of insulating glass per sqm). Frame-type (sheet) curtain walls erect mullions on site with profiles listed separately — the two processes differ, and the absence of framing in unitized walls is not a missing item. Application points: apply the unitized curtain-wall item directly (by mullion-spacing grade) and do not also apply a sheet-curtain-wall framing item (duplicate pricing); adjust glass differences per whether it is separately listed; the unpriced principal material "unit panel" enters at market/subcontract price; channel embeds listed by piece and T-bolts by set; panel transport priced by mutual agreement — do not omit it.
Applicable Boundaries
Applies to unitized (factory-precast panel) curtain walls; frame-type/sheet curtain walls follow their own items under the on-site mullion process (steel framing may reference the dry-hung stone steel-framing item). Item division and contents differ by province — the provincial quota chapter notes and item material lists prevail; lightning protection, fire barriers, etc. are charged separately.
Further Reading
Definition: DB34/T 3752-2020 "Technical Regulation for Safety Appraisal of Existing Building Curtain Walls", terminology (same scope as JGJ 102); compilation-scope examples: Beijing DB11/T 2382-2024 Appendix A.12.9-3 A-12-290/291; Shaanxi consumption quota (consultation draft) 12-190/191; Hunan 2025 curtain-wall chapter notes (lightning protection charged separately, steel/aluminum framing adjustment, unitized transport by mutual agreement, etc.).
Keywords
- 单元式幕墙
- 幕墙定额
- 骨架计价
- 板块制作
- 板材幕墙
- 玻璃调差
- pricing by applying quota line items