Classifying and measuring slope treatment works by protection type: plant protection by slope area, masonry protection by masonry volume, anchoring and facing listed apart (anchor length / mass + facing area), SNS flexible nets by laid area with anchors and posts separate
Slope treatment pricing first fixes the sector system (railway / highway / municipal) and the protection type, then itemises on the measurement line: (1) plant protection (grass seeding, hydro-seeding, geotextile mats, planting bags) by laid slope area; (2) masonry protection (mortared rubble slope protection, skeleton (rib) protection, protection walls) by solid masonry volume, rendering and pointing extra by area; (3) anchoring + facing (anchor-mesh hydro-seeding, shot-seed-mix, anchor-mesh shotcrete) split with anchors by design length / mass and facings by area / volume; (4) SNS flexible protection nets by design laid area, with anchors and post foundations / posts listed separately. What the work content already includes (meshing, scaffolds, energy dissipators etc.) is never listed again.
Applicable Codes
- TB/T 10822-2024 铁路工程预算定额 Vol. 1 路基工程 Ch. 4 平(坡)面防护
- TB/T 10822-2024 Vol. 1 Ch. 5 护坡及冲刷防护
- TB/T 10822-2024 Vol. 1 册说明 第二部分 Ch. 4、Ch. 5分章说明
- JTG/T 3832-2018 公路工程预算定额 补充子目 1-5-8 边坡柔性防护
Positioning
The classification framework and per-type measurement lines for pricing slope treatment works (subgrade slope protection), across the railway, highway and municipal quota systems - answering the generic question 'what unit and how many items per slope method'.
Core conclusions
1. Two steps to fix the path
Step 1, fix the sector: slope treatment sits in different chapters of railway (TB/T 10822-2024 etc.), highway (JTG/T 3832-2018 system) and municipal / local consumption quotas - different item division, units and charging; no cross-borrowing; only on gaps may similar processes be referenced or a supplementary unit-rate build-up schedule compiled. Step 2, fix the protection type into one of four classes and itemise on its measurement line.
2. The four measurement lines
(1) Plant protection (seeding, hydro-seeding, geotextile mats, planting / eco-bags) - by laid slope area
- Railway chapter 4 section 2: LY-310 seeding, LY-311~316 hydro-seeding (100m2, banded by embankment / cutting x normal / arid / cold); rules: 'plant protection is measured by design quantity', 'slope geotextile mats are measured by design laid area, seeding already included'.
- Highway: grassed slope protection (manual, meshed, hydro-seeded, seed-mix, soil-spray) by the slope area laid; hydro-seeding items already cover binder, water-retainer, fertiliser and film - no conversion; only seed consumption adjusts to design.
- Municipal / local: hydro-seeding by the outer developed area from the drawings, banded 30~45, 45~60, over 60 degrees (100m2).
- Eco / planting bags: eco-bags by slope area; planting bags flat by area, stacked by volume.
(2) Masonry protection (mortared rubble slopes, skeleton protection, walls, precast blocks) - by solid masonry volume
- Railway chapter 4: LY-394~397 mortared rubble slopes (10m3, height up to 8m / 16m x M7.5 / M10), rendering LY-398 and pointing LY-399 extra per 100m2; skeleton protection LY-403~407 (10m3, by height x mortared rubble / mortared concrete edging / cast-in-place concrete), grassing inside the skeleton stacked by area.
- Railway chapter 5 rules: 'full-slope protection and walls compute foundation excavation only below the original ground (subgrade) line; skeleton protection adds the trench excavation on the slope'; 'masonry is measured by design outer dimensions in volume'; 'small precast members by design outer volume, hollow concrete blocks by solid volume'.
(3) Anchoring + facing (anchor-mesh hydro-seeding, seed-mix spraying, anchor-mesh shotcrete, soil-nail walls) - anchors and facing apart
- Railway: seed-mix LY-317 anchors (t) + LY-318 at 10cm (100m2) with LY-319 per +/-1cm; shotcrete route LY-305 mortar anchors (100m) + LY-307 steel mesh (t) + LY-306 shotcrete (10m3).
- Rules: 'anchors are measured by design length'; 'rebar mass = design length x theoretical unit mass; laps, welding wire, binding wire and spacers never enter the quantity'.
- Meshing depends on work content: the seed-mix thickness item already includes 'hanging wire mesh' - no separate listing; the shotcrete route lists steel mesh separately. Soil-nail items exclude mesh and shotcrete - charge when needed.
(4) SNS flexible nets (active / passive) - nets by design laid area, anchors and posts separate
- Railway chapter 4 section 4: active = wire-rope anchors LY-371 (100m) + net installation LY-372 (100m2); passive = post foundations LY-373 (10m3) + rebar anchors LY-374 (100m) + net installation LY-375 (100m2). 'High-strength metal nets are measured by design laid area'; volume note: 'active and passive net items exclude scaffold erection and removal - charge per design quantity under the relevant quota'.
- Highway item 1-5-8 flexible slope protection: active / passive nets per 100m2, anchors per t, posts per 100m2 - separate items, anchors never merged into nets.
3. Three error guards
- What the work content includes is never listed again (meshing, support ropes, dissipators, toe anchors, scaffolds).
- When anchors, nets and substrates measure separately, each takes its design quantity - never fold anchors into a per-area lump.
- Excluded content is charged per the quota notes (nets' scaffolds, masonry foundation excavation and skeleton trenches, skeleton grassing) - omitting them is omission.
Applicable boundaries
- A generic path for itemisation and measurement, replacing neither item contents nor base prices; price from the executing volume of the sector and the compilation-period prices.
- No cross-borrowing between railway, highway and municipal systems; on true gaps, 'reference a similar process -> compile a supplementary schedule for approval'.
- Banding conditions (height, slope angle, climate zone, embankment / cutting) must be fixed first or the band will be wrong; skeleton trenches and net scaffolds are frequent omissions - check the chapter notes.
- Soil-nail walls and anchor frame beams belong to the retaining-structure chapters, not to this chapter's slope-face lines.
Further reading
Railway: TB/T 10822-2024 Volume 1, chapter 4 (shotcrete LY-305~307; green protection; high-strength flexible nets) and chapter 5 (slope masonry LY-394~399, skeletons LY-403~407) with volume notes; Highway: JTG/T 3832-2018 with supplement 1-5-8 flexible slope protection and greening chapter rules; Municipal: provincial slope-greening chapters (e.g. Shaanxi 2024 draft 6-1~6-4).
Keywords
- 边坡治理
- 边坡防护
- pricing by applying quota line items
- 列项
- 计量规则
- 喷播植草
- 主动防护网
- 浆砌片石护坡
- 喷混植生