Routing monitoring / signal poles and their concrete foundations to quota disciplines: poles to general installation or municipal works, foundations always charged separately under building civil works
The discipline routing of monitoring / signal poles turns on whether the road sits within municipal jurisdiction: poles (monitoring poles, street lights) along plant and residential-estate roads follow general installation works electrical equipment installation (GB/T 50856-2024 Appendix D); only city-road lighting systems / municipal traffic facilities follow GB/T 50857 municipal itemisation. The concrete foundations of poles and equipment (including foundation earthworks and anchor-bolt embedment) are excluded by every installation item and follow the building and decoration (or structures) works items, with secondary grouting under machinery installation.
Applicable Codes
- GB/T 50856-2024 第3.0.6条、App. E 第E.8.3条、App. D
- GB/T 50857-2024 第3.0.4条、App. B 第B.6.12条
- GB/T 50854-2024 第3.0.4条
- DB11/T 2382-2024 第6.4.2~6.4.4条
- SJG 77-2020 第6.1.8条
- SJG 181.8-2024 第1.1.5条、第2.1.3条
- SJG 181.7-2024 第4.1.2条
Scope of the question
Two tests: 1 the discipline of monitoring poles, signal poles, traffic sign poles, gantries and the like (building / general installation vs municipal); 2 which quota covers their concrete foundations (earthworks, anchor bolts). Core: poles route by the road's jurisdiction, foundations always charge separately under civil works.
Core conclusions
One-line test: what decides the pole's discipline is not that it stands by a road but whether that road is within municipal jurisdiction (city-road lighting system / municipal traffic facilities); and whichever discipline the pole takes, the installation items exclude the foundation, which must be priced separately under building and decoration works.
1. Pole discipline - city-road lighting system or not GB/T 50856-2024 Measurement Standard for General Installation Works, Article 3.0.6 paragraph 1: electrical equipment installation along plant and residential-estate roads - road lighting, landscape lighting, parks, squares, public courtyards - follows the electrical equipment installation codes of this standard; anything touching the city-road lighting system follows GB/T 50857 municipal codes. Conversely GB/T 50857-2024 Article 3.0.4 paragraph 4: the boundary between street-lighting works and GB/T 50856 electrical installation is the interface between the city-road lighting system and the city power supply system - inside, the municipal standard; outside, GB/T 50856 Appendix D. So monitoring poles along plant and estate roads fall under plant works - general installation electrical, not municipal street lighting.
2. Where monitoring poles land in the measurement standard GB/T 50856-2024 Appendix E Article E.8.3: electrical equipment, devices, battery banks, lightning protection and earthing systems, pole works, conduit works, trunking, cable trays and junction boxes related to intelligent building works follow Appendix D electrical equipment installation codes. (So video-surveillance pole works measure under Appendix D.)
3. Foundations to civil works (decisive provisions) DB11/T 2382-2024 Construction Consumption Standard: Article 6.4.2 - steel-tube pole foundations in overhead line works and erected iron pole foundations in luminaire installation follow building and decoration works items; Article 6.4.3 - foundations for electrical equipment installation follow building and decoration works, secondary grouting following machinery installation works; Article 6.4.4 - earthworks, masonry, concrete, formwork, rebar and inspection chambers in duct-bank laying follow building and decoration works and structures works. SJG 77-2020 Article 6.1.8: concrete equipment foundations and concrete tanks etc. go into the corresponding civil works.
4. If municipal (city roads), foundations likewise separate GB/T 50857-2024 Appendix B Article B.6.12: the work contents of signal lights, surveillance cameras, digital cameras and variable message signs exclude foundations, poles and gantries - where incurred, itemise under traffic sign pole and gantry codes. SJG 181.8-2024 Article 1.1.5: sign pole and gantry installation items exclude foundation earth and rock, foundation construction and anchor-bolt embedment - charge separately. Article 2.1.3: signal pole installation compiled on finished steel poles, excluding foundation earthworks, foundation construction and anchor bolts - charge separately. SJG 181.7-2024 Article 4.1.2: street-light foundation items suit foundations under 5 m3; above 5 m3, Volume 3 Bridges and Culverts items apply.
Applicability limits
- Applies to discipline routing and the foundation-separate test under quota / consumption pricing; it does not replace the choice of local items and item descriptions.
- Foundations generally route to building and decoration (or structures) civil items, but local special rules govern by the volume executed: secondary grouting of electrical foundations goes to machinery installation; street-light foundations band by volume (under 5 m3 lighting / installation volume, above, bridges and culverts).
- Whether foundation items include earthworks and anchor bolts follows the chosen volume's work content - installation / municipal volumes mostly say separately, civil volumes may have absorbed them.
- Discipline routing here differs from the acceptance- and fee-squad divisions - do not mix.
Further reading
- GB/T 50856-2024: Article 3.0.6, Appendix E Article E.8.3, Appendix D.
- GB/T 50857-2024: Article 3.0.4, Appendix B road works (B.6.12).
- DB11/T 2382-2024 Articles 6.4.2-6.4.4; SJG 77-2020 Article 6.1.8; SJG 181.8-2024 Articles 1.1.5 and 2.1.3; SJG 181.7-2024 Article 4.1.2.
Keywords
- 监控立杆基础
- 立杆工程归口
- 电气设备安装
- 混凝土基础归土建
- 房建定额与市政定额
- 城市道路照明系统
- 基础另计
- 附录D电气设备安装