Whether roof steel purlins, horizontal bracing and tie rods list separately: purlins are independent flexural members listed apart by mass; bracing and ties take 'horizontal steel bracing / tie rod' items - never merged into roof trusses nor mistaken for excavation-retention struts

Steel purlins run across the trusses carrying the roof build-up - independent flexural members functionally unlike trusses - and list separately in both quota and BOQ, by mass (t) from the drawings. Railway TB/T 10831-2024 Volume 10 sets 'steel purlin fabrication and erection' apart: fabrication in three bands - pipe (FY-724), C and Z sections (FY-725), other sections (FY-726) - plus one erection item (FY-727), all in t; in its member classification purlins, bracing and ties all sit in class II. Beijing DB11/T 2382-2024 Appendix A.6.5 sets 'horizontal steel bracing / tie rods (cold-formed)' items taking the top-chord plan bracing, bottom-chord horizontal bracing, column bracing and ties, by t; roof bracing never takes the excavation-retention strut items.

Applicable Codes

  • DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.7.10、4.7.17条及App. A.6.5
  • TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) Ch. 1第六节 五、其他钢结构制作安装(二)钢檩条制作安装 FY-724~FY-727
  • TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明 二、构件分类 及 四、工程量计算规则
  • GB/T 50854-2024 · Standard for measurement of building construction and fitting out works App. F 金属结构工程

Positioning

Where 'purlins, bracing, tie rods and ties' of steel roof systems belong in the bills: merged into trusses or not, which items apply, on what measurement - and where the corresponding items sit in the Beijing standard and the railway quota.

Core conclusions

1. Purlins list apart, never merged into trusses Purlins run across the trusses carrying the roof build-up (profiled or colour sheeting) - independent flexural members functionally unlike the trusses (transverse load-bearing systems), hence listed separately in quota and BOQ, by design mass (t). Railway TB/T 10831-2024 Volume 10, section 6, metal works, V(2) 'steel purlin fabrication and erection': fabrication by material - pipe (FY-724), C / Z sections (FY-725), other sections (FY-726) - and one erection item (FY-727), all per t; fabrication covers lofting, marking, cutting, truing, drilling, assembly, welding, straightening, numbering and stacking; erection covers setting out, unloading, inspection, assembly, stiffening, turning over, lashing and hoisting, truing, welding, fixing and touch-up paint - a complete fabrication-plus-erection item, never merged with trusses.

2. Bracing, ties and rods list apart Beijing DB11/T 2382-2024 Appendix A.6.5 sets 'horizontal steel bracing / tie rods' items (e.g. A-6-23, cold-formed), unit t, work content erection (assembly), welding, pre- and post-heating, node derusting, ultrasonic examination, materials the bracing, rods and electrodes. Top-chord plan bracing, bottom-chord horizontal bracing, column bracing and ties all fall here. The railway volume's classification runs the same way: class I - columns, roof trusses, bracket trusses, lattice trusses, crane beams, space frames, framed bridges; class II - beams, purlins, bracing, rods, rails, platforms, walkways, stairs, sundry members; class III - wall frames, wind frames, monitor frames, light roof trusses, other - purlins, bracing and rods sit apart from trusses and price on their own bands.

3. Common misuse and the test

  • 'What the work content includes is not charged again' (unlisted trades not extra, auxiliary content necessarily included) addresses auxiliary trades inside erection items (plant movement, material transport); purlins and bracing are independent load-bearing members, not auxiliary trades of truss erection - the principle does not apply; list them separately.
  • Excavation-retention steel struts (the 'strut erection' items of the Beijing standard belong to excavation retention) and roof steel bracing are different members - never swap items; roof bracing runs only on the metal-works chapter items.
  • Where a local quota truly lacks a purlin item, use the other-steel-member items with the material (pipe, C / Z, other) and unit mass written into the description, or compile a supplementary item for approval - never merge into truss items.
  • Even where purlins, bracing and trusses form one composite assembly, the BOQ still codes them separately per GB/T 50854-2024 Appendix F - avoiding double pricing against the truss items.

Applicable boundaries

  • The conclusions rest on the structural test 'purlins and bracing carry different functions from trusses' and suit ordinary steel roofs (portal frames, truss systems); space-frame members and supports follow their own inclusion rules (frame mass already holds members, nodes and supports), not purlin listing.
  • Item numbers and bands differ by system: Beijing Appendix A.6, railway Volume 10 section 6; cross-system borrowing states its basis and reason in the description.
  • Mass measurement: holes not deducted, electrodes, rivets and bolts not added (the general metal-works rule).
  • Exact numbers (A-6-23~A-6-25 cold-formed, A-6-26 hot-rolled) follow the volume tables; editions may renumber.

Further reading

  • DB11/T 2382-2024 clauses 4.7.10 / 4.7.17, Appendix A.6.5 and A.6.6; TB/T 10831-2024 Volume 10 member classification and quantity rules, section 6 V(2); GB/T 50854-2024 Appendix F.