separately billed item
- 01
Whether roof steel purlins, horizontal bracing and tie rods list separately: purlins are independent flexural members listed apart by mass; bracing and ties take 'horizontal steel bracing / tie rod' items - never merged into roof trusses nor mistaken for excavation-retention struts
Steel purlins run across the trusses carrying the roof build-up - indepe…
DB11/T 2382-2024 · Standard for Construction Consumption of Construction Works (Beijing) 第4.7.10、4.7.17条及App. A.6.5TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) Ch. 1第六节 五、其他钢结构制作安装(二)钢檩条制作安装 FY-724~FY-727TB/T 10831-2024 · Budget Quota of Railway Engineering (Volume 10: Housing Works) 册说明 二、构件分类 及 四、工程量计算规则2026-10-23 - 02
Can high-slope monitoring, tunnel monitoring measurement and other construction-monitoring fees be listed separately in highway estimates/budgets? They are inside the construction-auxiliary fee and may not be computed separately (JTG 3830-2018 clause 3.1.6 item 6)
No. Per JTG 3830-2018 "Measures for compiling estimates and budgets of h…
JTG 3830-2018 · Measure for Compilation of Preliminary Estimates and Budgets of Highway Construction Projects 第3.1.6条第6款、Table 3.1.6-8JTG/T 3832-2018 · Budget Quota of Highway Engineering2026-09-25 - 03
Ceiling transition layers and reinforcement measures (reverse supports, over-length hangers) must be priced separately: trigger conditions and item attribution
Steel transition layers, reverse supports, and over-length hangers beyon…
GB 50210-2018T/CBDA 18-2018GB/T 50854-20242026-09-25 - 04
Definition and pricing rules for preliminary items that cannot be measured precisely (Jing Jian Fa [2021] No. 11: class with issued management documents vs class without such documents)
Preliminary items that cannot be measured precisely = preliminary items…
京建法〔2021〕11号京建发〔2021〕404号京建法〔2019〕9号2026-09-25