Engineering Knowledge Cards.
Confidence HighUpdated 2026-10-10

Discipline attribution and quota application of split boxes (splitters): telecom cable split boxes, outdoor cable split boxes and CATV splitters / taps must not borrow items across volumes

The split box / splitter is not one single item: attribute by discipline first, never borrowing across volumes - telecom cable split boxes under railway TB/T 10826-2024 Volume 5 Telecommunications Works TY-256 to 259 (by G0D12 / G0D24 / G0D36 / G0D48 types, unit per piece); outdoor cable split boxes under Beijing DB11/T 2382-2024 Table G.3.27 (split by internal / external wall and pair-count bands, e.g. G3-5-27 internal wall up to 30 pairs, G3-5-29 external wall up to 100 pairs, unit per piece); CATV splitters / taps belong to intelligent building weak-current works, under Table C.5.59 line equipment C5-4-95 (subscriber taps and splitters up to 8 ways, unit per piece).

Applicable Codes

  • TB/T 10826-2024 铁路工程预算定额 Vol. 5 通信工程 Ch. 5 第三节(TY-256~TY-259)
  • DB11/T 2382-2024 建设工程施工消耗量标准 App. G 城市轨道交通工程 Table G.3.27、App. C 通用安装工程 Table C.5.59
  • GB/T 50856-2024 通用安装工程工程量计算标准 App. E 建筑智能化工程 章说明

Scope of the question

The split box (colloquially splitter) belongs to different items in different disciplines; the discipline must be fixed before pricing. This card gathers the quota items and measurement of telecom cable split boxes, urban rail transit outdoor cable split boxes and CATV splitters / taps, plus the attribution rules for junction boxes and the like in intelligent building weak-current works.

Core conclusions

1 Telecom cable split boxes - the telecommunications volume. Railway works apply TB/T 10826-2024 Railway Works Budget Quota Manual, Volume 5 Telecommunications Works, Chapter 5 optical (electric) cable split devices and termination, Section 3 installing split devices, item 2 long-haul cable split devices: TY-256 to TY-259 for types G0D12, G0D24, G0D36 and G0D48, unit per piece; work content: pair identification and testing of cable cores, core soldering, binding, installing the cable split box.

2 Outdoor cable split boxes - the urban rail transit / telecommunications volume, split by mounting face and pair count. Beijing DB11/T 2382-2024 Appendix G urban rail transit, Table G.3.27 installation of cable split cabinets and boxes, items split by internal / external wall and pair bands, e.g. G3-5-27 outdoor cable split box, internal wall, up to 30 pairs; G3-5-29 external wall, up to 100 pairs, unit per piece; work content: installing the split box, pair identification, testing, core soldering, binding, earthing connections.

3 CATV splitters / taps (this kind of splitter) - the intelligent building weak-current volume. Beijing DB11/T 2382-2024 Appendix C general installation works, Table C.5.59 line equipment, item C5-4-95 subscriber taps and splitters up to 8 ways, unit per piece; work content: checking devices, cleaning, installation, wiring, testing.

4 Attribution of junction boxes, conduit, trunking and cable trays in intelligent weak-current works. GB/T 50856-2024 Appendix E intelligent building works, chapter notes: the electrical equipment, electrical devices, battery banks, lightning protection and earthing systems, pole works, conduit works, trunking, cable trays and junction boxes related to intelligent building works shall be itemised under the codes of Appendix D electrical equipment installation of the standard. So weak-current junction boxes go to Appendix D, while intelligent-works-specific devices such as splitters and taps go to Appendix E.

5 Common measurement basis: junction cabinets, boxes and split boxes are all counted per piece on the quantity shown on the drawings; itemisation must distinguish mounting form (exposed / embedded), type, half-perimeter or pair count, internal / external wall and the like.

Applicability limits

  • Same name does not mean interchangeable: the electrical (power and lighting) junction box, the telecom cable split box, the urban-rail outdoor cable split box and the CATV splitter / tap sit in different volumes - choose by the discipline of the works; cross-volume misattribution and unfounded borrowing are barred; gaps follow supplementary unit-rate build-up schedules compiled on quota principles and submitted for approval.
  • Split-box items are split by type or pair band and mounting face (internal / external wall, exposed / embedded); check type / pairs and location before pricing.
  • Item numbers and consumptions follow the current local consumption standard or industry budget quota of the project; recheck item numbers after version updates.

Further reading

  • TB/T 10826-2024 Railway Works Budget Quota Manual, Volume 5 Telecommunications Works, Chapter 5 Section 3 item 2, long-haul cable split devices (TY-256 to TY-259).
  • DB11/T 2382-2024 Construction Consumption Standard, Appendix G urban rail transit, Table G.3.27 cable split cabinets and boxes (G3-5-27, G3-5-29 etc.); Appendix C general installation works, Table C.5.59 line equipment (C5-4-95).
  • GB/T 50856-2024 Measurement Standard for General Installation Works, Appendix E intelligent building works chapter notes (weak-current junction boxes, conduit, trunking and trays itemised under Appendix D).

Keywords

  • 分线盒
  • 分线器
  • 电缆分线盒
  • 分配器
  • 分支器
  • 专业归口
  • 跨册套定额