Fixing the quota home of communication cables in low-current systems: separating control cables / multicore flexible cords / twisted-pair cables / telecom optic-electric cables by the product standard behind the type code, with laying items banded by 'method + section + cores', conversion factors, and the treatment of screened and armoured constructions

Fix the product identity first, then the item - never the system it serves or the signal it carries: KVV / KVVP / KVV22 / KVVR (GB/T 9330.2 plastic-insulated control cables) run the electrical 'control-cable laying' items, banded by method + single-core section + core count; RVV / RVVP (JB/T 8734.3 flexible cords) run the 'multicore flexible cord' wiring items (drawn into conduit / laid in trunking, trays and on brackets), screened cords on the same items with labour x 1.20, sheathed cords over eight cores in conduit reverting to control-cable items; twisted-pair and large-pair-count cables are structured cabling, on the intelligent-building 'twisted-pair / multipair' items; local telephone cables belong to the information-communication volume's 'optic (electric) cable laying'. Under DB11/T 2382-2024 clause 6.4.54, screening, armouring and flexible construction never open separate laying items (only cable terminations split armoured / unarmoured); compiled on three-core (three-core-with-earth) copper, five-core x 1.15, single-core x 0.67, aluminium or alloy x 0.67.

Applicable Codes

  • DB11/T 2382-2024 建设工程施工消耗量标准 第6.4、6.5、6.11章
  • 京建发〔2021〕201号 2021预算消耗量标准 通用安装第四册 电气设备安装工程 第八章 电缆
  • TB/T 10829-2024 铁路工程预算定额 Vol. 8 电力工程 Ch. 2 第十六节 电缆敷设
  • GB/T 9330.2 塑料绝缘控制电缆
  • JB/T 8734.3 软线缆

Positioning

'Communication cable' in low-current (intelligent-building, telecom, monitoring) works is a loose name; the quota asks two questions first: what product is this cable (the product standard behind the type code), and which volume and section of the local consumption standard owns it. The identity test, the four homes (control cable / multicore flexible cord / twisted pair / telecom cable), the banding and the set factors - for choosing and borrowing across the electrical, intelligent-building and information-communication volumes.

Core conclusions

1. Order: type code -> product standard -> quota home. Never mind the signal or system; 'communication / low-current / signal' is site language, not a quota identity.

Type Product standard (evidenced) Identity Home
KVV, KVVP (braided screen), KVV22 / KVVP22 (steel-tape armour), KVVR / KVVRP (flexible) GB/T 9330.2 plastic-insulated control cables control cable electrical volume 'control-cable laying' items
RVV, RVVP (screened flexible) JB/T 8734.3 multicore flexible cord electrical 'wiring - multicore flexible cord' items (in conduit / trunking, trays, brackets)
4-pair twisted pair (UTP / STP), 25 / 50 / 100-pair multipair structured-cabling product family twisted-pair / multipair cable intelligent-building 'structured cabling'
Local telephone cable (HYA / HYAT class, full-colour aluminium-plastic sheath) telecom-cable product family telecom cable information-communication 'optic (electric) cable laying'

Evidence: one price-information page lists 'PVC-insulated PVC-sheathed braided-screen control cable KVVP-450/750 4x1.5' under GB/T 9330.2 and 'stranded-copper flexible cord RVV 2x0.5' under JB/T 8734.3 - one letter apart (KVVP versus RVVP), two product systems: hence the divergent homes, labour contents and cable-termination treatment.

2. Control / power cables: bands and factors (DB11/T 2382-2024)

  • 6.4.54: power and control cables up to 10kV (mineral-insulated and pre-branchded apart) average construction and type, items set on laying method, section and cores - screening, armouring and flexible conductors never open laying items; 'method + section + cores' alone picks the band.
  • 6.4.56: laying is compiled on three-core (earth-included) copper; five-core runs the same items with consumption x 1.15; single-core x 0.67; aluminium or alloy x 0.67. (Four-core carries no stated factor - never invent one.)
  • 6.4.59: vertical-shaft laying, slabs or none, runs the laying items with labour x 1.30. Beijing 2021 adds: pre-branchded cables already take the vertical-shaft basis - no second factor.
  • Mineral-insulated: 6.4.57 rigid (BTTZ) by section and 1 / 2-4 cores; 6.4.58 flexible (YTTW, BTLY) by section and 1 / 3 (earth-included) cores, five-core on the three-core items x 1.15; both by drawn length, allowances per 6.4.55.
  • Pre-branchded: 6.4.60 no core split, items by main-cable section, length of the main cable; 6.4.61 compiled on in-shaft laying with suspension fittings, branches measured to 10m, the excess set apart.
  • Terminations: 6.4.62 by 10kV / 1kV and armoured / unarmoured - the section's only armoured split; 10kV terminations and joints on three cores, single-core on the like section x 0.40; indoor heat-shrink armoured on indoor cold-shrink armoured with labour x 1.50; elbow heads on the like indoor termination with labour x 1.10; 10kV terminations already hold the withstand test, partial-discharge testing measured apart. Quantities per 6.4.67 as drawn.

3. Multicore flexible cords - the wiring boundary (6.4.107)

Wiring sets items by cable type, cores and section, lighting versus power: copper in conduit, sheathed cords, multicore flexible cords; wiring in trunking; cords laid in trunking / trays / brackets; surface runs of sheathed cord. Points:

  1. Lighting lines over 4mm2 run the power items;
  2. Wiring consumption holds the joint tails of luminaires, switches, sockets and buttons; drawing-in holds allowances;
  3. Sheathed cords drawn into conduit compile on rigid conductors - over eight cores, the control-cable items take over - the crossover clause from cord to control cable;
  4. Screened flexible cords in conduit or trunking run the cord items with labour x 1.20 (screening opens no item);
  5. Wiring quantities by single-run length as drawn (allowances in); panel and cubicle allowances per Table 6.4.112 - boards and cubicles 'height + width' on the face; stand-alone starters and busway boxes 0.30m from centre; pipe outlet to power junction box 1.00m at the mouth; supply-to-conduit and leaving-building runs 1.50m at the mouth.

4. Cross-volume borrowing and the structured-cabling boundary

  • 6.5.3 (intelligent building) and 6.11.4 (information communication): their conduits, trunking, trays, electrical devices, boxes, wires, control-cable laying, UPS and support making run the electrical volume's items - control cables inside low-current systems return to the electrical volume, never re-listed in the intelligent-building volume.
  • 6.5.10 / 6.5.11: structured cabling sets items by cable type, method and cores, laying including testing; compiled on category-6 UTP, higher categories on it with labour x 1.10, screened systems with labour x 1.20. 6.5.16: work-area slack 0.40~0.60m, cabinets at telecom rooms and equipment rooms 4m; fibre slack 3~5m on routes, 5~10m at patch cabinets, 1~1.50m at work areas. 6.5.14: patch cords and pigtails beyond 5m run the cable-laying items on the excess.
  • 6.11.22 / 6.11.26: optic (electric) cable laying by method (overhead, buried, in duct, riser, on walls, in buildings) and cores, by drawn length (allowances in), allowances per design or code.

5. The general quantity rule (6.4.55): laying by drawn length (allowances and additions in); absent design or code, Table 6.4.55 - sag, waviness and crossings 2.5% of full length; entering buildings 2m; into trenches or up (down) to racks 1.50m; substation in and out 1.50m; power-cable terminations 1.50m (minimum maintenance reserve); joints 2m each side; boards and cubicles height + width; cable to motors 0.50m from the terminal box; works transformers 3m from ground; around beams and columns as measured; lift cables 0.50m per fixing point.

Applicable boundaries

  • The home follows the product standard behind the type code, never the works name; KVVP and RVVP, one letter apart, cross items, labour contents and termination treatment.
  • Screening, armour and flexible construction open no laying items under 6.4.54 - they surface only in the termination split and the main-material price; never a second laying item for 'screened / armoured'.
  • The factors (five-core 1.15, single-core 0.67, aluminium 0.67, shaft labour 1.30, screened-cord labour 1.20, heat-shrink-for-cold-shrink 1.50, single-core termination 0.40, elbow 1.10, above-cat-6 1.10) are Beijing's DB11/T 2382-2024 values - other provinces and sectors convert locally.
  • Railway differs: TB/T 10829-2024 Vol.8 bands control-cable laying by cores alone (up to 10 / 24 / 30, DY-445~447, per hm) with no cord-versus-control identity contest; work content loading, hauling, drum shifting, cutting, sealing, covers, laying, fixing, tagging, testing assistance.
  • DB11/T 2382-2024, the 2021 electrical volume (Jing Jian Fa [2021] No. 201) and the 2013 list codes share no clause or item numbers - fix the current edition before applying.
  • The Beijing 2021 notes: laying compiled for plains and in-plant conditions - not for standing water, underwater or pit working.
  • To verify: the KVVR / KVVRP flexible types rest on the GB/T 9330.2 coding - confirm against the design and certificate; telephone cables belong to the information-communication volume by product attribute - confirm the standard before pricing, never defaulting to the electrical control-cable items.

Further reading

  • DB11/T 2382-2024 clause set 6.4: IX cables (6.4.54~6.4.67 with Table 6.4.55), XII conduit and wiring (6.4.103~6.4.114 with Table 6.4.112).
  • The same standard 6.5 (6.5.3, 6.5.10~6.5.16 structured cabling) and 6.11 (6.11.4, 6.11.22~6.11.29 cable laying).
  • Jing Jian Fa [2021] No. 201 Vol.4 electrical works ch.8 cables (10 sections, 499 items) against the 2024 clause set 6.4.
  • TB/T 10829-2024 Vol.8 ch.2 s.16: DY-445~447 control-cable laying.
  • Product standards: GB/T 9330.2 and JB/T 8734.3, confirmed from the price-information 'type - standard' column or the certificate.