Railway 2024 quotas: station-yard volume machinery travel-track laying (ZY-112/113) vs the track volume's laying quotas (GY series) — differences and measurement calibers
Laying travel tracks for freight-yard handling machinery uses Chapter 5 "machinery travel-track laying" of TB/T 10834-2024 Volume 13: ZY-112 (50 kg/m) and ZY-113 (60 kg/m), unit 100 m, base prices 49,511.72 / 57,313.30 yuan, all rail materials included; laying railway track uses Chapter 1 of TB/T 10825-2024 Volume 4, items such as GY-100~105, unit km, quotas excluding rail materials — pair with material quotas. In the estimate summary per TB 10801-2024 Appendix A, "handling machinery foundations and travel tracks" counts in single-track km (1 single-track km = 10 x the 100 m quota unit).
Applicable Codes
- TB/T 10834-2024 铁路工程预算定额 Vol. 13 站场工程 Ch. 5
- TB/T 10825-2024 铁路工程预算定额 Vol. 4 轨道工程 Ch. 1
- TB 10801-2024 铁路基本建设工程设计概(预)算编制办法 App. A
Topic Positioning
This card distinguishes two easily confused item families in the railway 2024 quotas: the station-yard volume's "machinery travel-track laying" (ZY-112/113, track for handling machinery) and the track volume's "track laying" (GY series, railway lines), giving the rail-material caliber difference, quota units, and the estimate-summary conversion — to prevent wrong item selection and missing rail materials.
Core Conclusions
- Sources and positioning:
- Machinery travel-track laying: TB/T 10834-2024 Volume 13, Chapter 5 "steel-structure fabrication and erection", Section 2. Items ZY-112 (50 kg/m rail) and ZY-113 (60 kg/m rail), unit 100 m; base prices 49,511.72 and 57,373.30 yuan, of which materials 46,985.24 and 54,523.03 yuan — about 94%-95% — all rail materials included. Work content: "manually lay rails, oil rail heads and the inner sides of joint bars, sulfur-anchored fastening, apply fastenings". For travel tracks of gantry cranes, loading bridges, and other handling machinery in freight yards and station yards.
- Track (panel) laying: TB/T 10825-2024 Volume 4, Chapter 1. E.g., GY-100~105 "jointed track, machine laying, panel laying" (by track-layer, split concrete sleepers type II/III, concrete bridge sleepers II/III, wide sleepers, timber sleepers), unit km, base 11,872.74-33,766.67 yuan, of which materials only 199.75-239.70 yuan/km — pure laying operation, no rail materials. Work content: "from the arrival of panel trains at the laying site (or forward operating station): shunting, transloading and dragging of panels, lifting and laying, fitting rail accessories, checking, rough lining".
The core caliber difference — materials included or not: the station-yard ZY-112/113 include rails and all materials — apply directly; the track volume's notes state "machine laying, manual laying, and long-rail laying quotas exclude rails, sleepers, fastenings, and joint bars — they must be used with the matching material quotas" — a GY laying item alone is only the laying operation; the matching material quotas (rails, sleepers, fastenings) are needed for a full price.
Units in two places: when pricing by applying quota line items, travel tracks count per 100 m (ZY-112/113) and track laying per km (GY series); in the estimate summary, per the TB 10801-2024 Appendix A composite chapter table, the station-yard machinery chapter's "I. construction cost (4) handling machinery foundations and travel tracks" is measured in single-track km — 1 single-track km = 10 x the 100 m quota unit; convert when pricing ZY-112/113.
Usage test: travel tracks of handling machinery in freight/station yards -> ZY-112/113 (materials included; no separate rails, fastenings, joint bars); main-line and station-track laying -> the track volume's laying quotas (GY series) plus material quotas. Note ZY-112/113 exclude the track foundation, which is listed parallel to the travel track in the chapter table (as handling-machinery foundations) and priced per the relevant quotas; the track volume's laying likewise excludes ballast placing and tamping — pair per the process.
Applicable Boundaries
- Only the railway 2024 system (TB/T 10834-2024 Volume 13, TB/T 10825-2024 Volume 4, TB 10801-2024); old editions' item numbers and prices differ — do not reuse these figures.
- ZY-112/113 cover only 50 and 60 kg/m travel-track laying and only the laying itself (rail laying, oiling, sulfur anchoring, fastening) — no travel-track foundations.
- The station-yard volume's Chapter 5 notes: the steel-structure items exclude painting except wire-mesh fence panels and gates; steel-structure fabrication/erection and coating not compiled here may use Volume 10 building works items.
- Track-laying conditions: rail laying applies below 20 permille grades and under 1 km tunnels; above 20 permille multiply labor and plant by 1.5; over 1 km tunnels by 1.25; both by 1.75 (TB/T 10825-2024 Chapter 1 notes).
Further Reading
- TB/T 10834-2024 Volume 13, Chapter 5 "steel-structure fabrication and erection", Section 2 "machinery travel-track laying" (ZY-112, ZY-113) and the volume notes.
- TB/T 10825-2024 Volume 4, Chapter 1 "track laying" notes (material pairing, grade/tunnel factors, wastage rates) and the "jointed track, machine laying, panel laying" tables (GY-100~105).
- TB 10801-2024 Appendix A composite chapter table: "II. station-yard machinery and equipment" -> "I. construction cost (4) handling machinery foundations and travel tracks", unit single-track km.
Keywords
- 机械走行轨铺设
- 装卸机械基础及走行轨
- 站场工程定额
- 铺轨定额
- 轨料配套
- 单轨公里
- ZY-112
- ZY-113
- TB/T 10834-2024
- TB/T 10825-2024