Innovation-type topics - the 'set countermeasures' step and Table 2 (countermeasure table): chosen schemes entered item by item, 5W1H, and the countermeasure-goal-measure column order fixed (T BCAT 0003-2024 clause 4.2.5)
Per T BCAT 0003-2024 clause 4.2.5, setting countermeasures enters the chosen implementable specific schemes item by item into the countermeasure table; a countermeasure is a specific scheme of the fixed best scheme; by the nature of the innovation (whole-machine testing of plant, joint tuning of systems and the like) special countermeasures may be drawn and entered; the table follows 5W1H - countermeasures implementable specific schemes, goals measurable and checkable, measures operable; and the order of countermeasure, goal and measure in the table never changes.
Applicable Codes
- T BCAT 0003-2024《北京市工程建设质量管理小组活动准则》第4.2.5条、表2 对策表(创新型课题)
- T/CAQ 10201-2020《质量管理小组活动准则》
Positioning
The verbatim requirements of clause 4.2.5 'set countermeasures' of T BCAT 0003-2024 and the drafting rules of Table 2 (innovation-type countermeasure table), for writing and reviewing innovation-topic reports.
Core conclusions
1) What enters: the chosen implementable specific schemes of the decomposition enter the countermeasure table item by item - a countermeasure is a specific scheme of the fixed best scheme: as many terminal-layer specifics as clause 4.2.4 produced, so many countermeasure rows, none omitted and none invented without a scheme behind it.
2) Special countermeasures: by the innovation content - whole-machine testing for plant, joint tuning for systems and the like - the circle may set matching countermeasures and enter them; integration testing enters as its own rows, never vaguely inside the implementation narrative.
3) Drafting (5W1H): the table follows 5W1H - countermeasures are implementable specific schemes, goals measurable and checkable, measures operable; goals must be measurable and checkable, measures written as executable actions, not principles.
4) Format red line: in Table 2 the order countermeasure - goal - measure never changes; the header stays 'countermeasure / goal / measure', never reshuffled to 'goal / countermeasure / measure' and the like.
Applicable boundaries
For the 'set countermeasures' step and Table 2 of innovation topics; countermeasures map one-to-one onto the specifics fixed under 4.2.4 - a countermeasure detached from the schemes is a procedural gap in review. Not for problem-solving topics (their countermeasures answer confirmed root causes under clause set 4.1 - a different starting point). Text per T BCAT 0003-2024; check the sector's review rules when filing elsewhere.
Further reading
T BCAT 0003-2024 clause 4.2.5 and Table 2; upstream 4.2.4 (decomposition to implementable specifics); the following steps per the clause-4.2 programme chart (implementation -> effect check -> standardisation -> summary and next steps); parallel in T/CAQ 10201-2020.
Keywords
- 制定对策
- 对策表
- 5W1H
- 创新型课题
- T BCAT 0003-2024
- 专项对策
- 对策 目标 措施 顺序