Recording and retention of photographic records of concealed works and critical processes and of construction logs: what to shoot, original resolution of no less than 10 megapixels, filing by unit work, prohibition of editing or altering file properties, no supplementary or back-dated entries

Photographic records of concealed works form part of the acceptance documentation: they must be cross-numbered with the paper acceptance records, archived as electronic files and handed over at completion. Digital photos must be authentic, clear and complete, with original resolution of no less than 10 megapixels; each photo must show the chainage of the inspected section, structural dimensions, inspection time and inspecting personnel; where a concealed work is submitted for acceptance several times, photos are retained each time; altering photo or video properties, editing, and supplementary or back-dated filing are strictly prohibited. Construction logs must be kept continuously day by day by a dedicated person (covering weather, work positions and content, problems and their handling, arrival and departure of materials and equipment, acceptance activities etc.); back entries, skipped pages and torn pages are prohibited.

Applicable Codes

  • TB 10754-2018 高速铁路轨道工程施工质量验收标准 附录A
  • GB 55032-2022 建筑与市政工程施工质量控制通用规范 第3.3.4条
  • GB 50300-2013 建筑工程施工质量验收统一标准 第3.0.6条
  • GB 50210-2018 建筑装饰装修工程质量验收标准 第3.3.12条
  • DB11/T 1448-2017 城市轨道交通工程资料管理规程 第5.3.2条
  • DB22/T 5016-2019 市政工程资料管理标准 第7.1.5条
  • 建设工程质量管理条例(国务院令第714号,2019修订)第三十条

Scope

Once a concealed work is covered it cannot be visually re-examined, so the process records are the only 'site' that can be revisited. This card consolidates the code requirements for photographic records (photos and video) and construction logs - what to shoot, what to record, how to store, and what must not be touched - for construction, supervision and document-control staff to follow, and for testing whether the records hold up in later disputes.

Core conclusions

1. Photographic records are part of the acceptance documentation (basic requirements) TB 10754-2018 Appendix A:

  • A.1.1 Photographic records shall comprehensively reflect the quality acceptance and process control of concealed works and critical processes within the unit work, recording the quality condition of the accepted works.
  • A.1.2 Photographic records shall carry corresponding text descriptions, including the number, title, brief description of the content, shooting time, location and photographer.
  • A.1.3 Digital photos shall be authentic, clear and complete, with original resolution of no less than 10 megapixels.
  • A.1.4 After shooting, the records shall be managed in a unified way by a dedicated person, and backed up regularly.

2. Workflow (no proxy shooting, no back entries)

  • A.2.1 All photographic records form part of the acceptance documentation, cross-numbered with the paper acceptance records and archived as electronic files; during construction dedicated personnel and dedicated equipment shall manage them, and after completion acceptance they are delivered to the construction unit together with the works.
  • A.2.2 The contractor and the supervision unit shall each record the acceptance; the supervision unit shall not require the contractor to shoot or record on its behalf.
  • A.2.3 The supervision unit and the contractor shall retain photos separately and archive them separately; the photos shall show the chainage of the inspected section, structural dimensions, inspection time and inspecting personnel.
  • A.2.4 Where a concealed work is submitted for acceptance more than once, photos shall be retained for each submission.
  • A.2.5 After shooting, the photographer shall promptly organise and write the descriptions of the image files, sorting and filing them by shooting time and in the order of overall view first, then details.
  • A.2.6 The files must be readable, accurate and complete; when demonstrated or run on equipment they must operate normally and be virus-free, clean and unscratched.
  • A.2.7 The supervision unit and the contractor shall archive and organise photographic records promptly, without supplementary or back-dated filing; altering the file properties of photographic records is strictly prohibited.

3. Shooting, storage and archiving details

  • A.4.1 The shooting angle and method shall comprehensively reflect the quality condition of the accepted part and be representative; for items with dimensional requirements such as member deviations and rebar lap and anchorage lengths, a scale ruler shall be added for clear marking and photographic record.
  • A.4.2 Electronic photos are stored by unit work, one folder per unit work (the folder named after the unit work), with sub-folders by divisional work, sub-divisional work, inspection lot and each acceptance within an inspection lot; photos are stored and numbered inside the sub-folder of each acceptance.
  • A.4.3 Each inspection-lot folder contains a Word document describing the photos of that lot one by one: image number, image title, brief description of the shooting content, shooting time, photographer and shooting location.
  • A.4.4 Archived photographic records all use the originally shot photos or video; altering the properties of photos and video and editing photos are strictly prohibited.
  • A.4.5 At completion archiving, one medium may store only the content of the same unit work; photographic records of different unit works should not be stored on the same medium.
  • A.4.6 As important quality-certifying documents for construction quality control and acceptance, each party shall establish a sound photographic record management system and assign dedicated staff to collect, organise, keep and transfer the records.
  • A.4.7 No one may withdraw or alter photographic records without authorisation; destruction of photographic records must go through strict appraisal, be implemented after approval by the responsible leader, and be registered.

4. Critical processes requiring photographic records (track works example) A.3 lists: base slab and track-bed reinforcement and welded mesh installation; dowel installation; inspection and confirmation of bridge shear pockets; installation of steel-plate connectors for CRTS II slab ballastless track; longitudinal connection of the CRTS II base; longitudinal connection of CRTS II track slabs; insulation testing of reinforcement meshes; welding of track-bed grounding bars and grounding terminals; lock welding of jointless turnouts with adjacent jointless track; rail temperature at internal welding of turnouts; displacement observation.

5. Baseline requirements of the general codes

  • GB 55032-2022, Article 3.3.4(4): 'Before a concealed work is covered, the contractor shall notify the supervision unit for acceptance, and on-site photographic records shall be retained and acceptance documents formed; construction may continue only after acceptance has passed.'
  • GB 50300-2013, Article 3.0.6(5): before a concealed work is covered, the contractor shall notify the supervision unit for acceptance, acceptance documents shall be formed, and construction may continue only after passing acceptance.
  • GB 50210-2018, Article 3.3.12: 'Acceptance of concealed works shall be recorded, and the records shall include photos of the concealed parts. Acceptance of inspection lots shall have original on-site inspection records.'

6. Requirements for construction logs

  • DB11/T 1448-2017, Article 5.3.2: the construction log shall be kept day by day by a dedicated person, recorded comprehensively or by discipline according to the scale, characteristics and complexity of the works; the record covers the day's weather, the construction position and content, problems arising during construction and their handling, the arrival and departure of main materials, equipment, components and large plant, acceptance and important quality and safety activities, and subcontractor mobilisation and demobilisation; the construction testing plan shall be prepared before construction starts and submitted to the supervision unit; where the relevant documents already carry the supervision unit's signature block, no separate submission and inspection form needs to be completed.
  • DB22/T 5016-2019, Article 7.1.5: the construction log takes the unit work as its object of record, recording day by day, continuously and completely the technical and quality management activities, major events and their outcomes of the unit work from commencement of the works to their completion; it is kept by a dedicated person of the project department by discipline, ensuring authentic, continuous and complete content; the log must not contain back entries, must not skip or tear pages, and shall be filled in and signed promptly.

Boundaries

  • TB 10754-2018 Appendix A applies to high-speed railway track works, and its A.3 list of critical processes is specific to that discipline; building decoration and fit-out follows GB 50210-2018, and the general baseline follows GB 55032-2022 and GB 50300-2013.
  • DB11/T 1448-2017 (Beijing) and DB22/T 5016-2019 (Jilin) are local standards; projects in other regions follow the document-control standards of the project's locality; where local standards are inconsistent with mandatory national standards, the latter set the floor.
  • Photographic records and construction logs are certifying documents of process control and acceptance; they replace neither the concealed-work acceptance documents themselves nor quality test reports; their admissibility and weight as evidence are judged separately under the civil evidence rules.
  • The 10-megapixel threshold, scale rulers, and the display of chainage and dimensions are technical retention requirements; a specific project may raise them in its particular conditions or the employer's requirements, but may not lower them.

Further reading

TB 10754-2018 Standard for Constructional Quality Acceptance of High-Speed Railway Track Works, Appendix A (A.1 basic requirements, A.2 workflow, A.3 critical processes requiring photographic records, A.4 shooting, storage and management of photographic records, A.5 examples of retained photos and marking plates); GB 55032-2022 General Code for Construction Quality Control of Building and Municipal Engineering, Article 3.3.4; GB 50300-2013 Unified Standard for Constructional Quality Acceptance of Building Engineering, Article 3.0.6; GB 50210-2018 Standard for Quality Acceptance of Building Decoration Engineering, Article 3.3.12; DB11/T 1448-2017 Regulations for Documentation Management of Urban Rail Transit Engineering, Article 5.3.2; DB22/T 5016-2019 Standard for Documentation Management of Municipal Engineering, Article 7.1.5.