Slab distribution reinforcement: position, function, and construction requirements (GB 50010-2010 (2015 edition) Clause 9.1.7; TB 10064-2019 Clause 4.1.5)

Distribution bars are placed perpendicular to the main bars on their inner side, fixing them, forming the mesh, distributing load, and resisting temperature-shrinkage stresses. GB 50010-2010 (2015 edition) Clause 9.1.7: one-way slab distribution steel per unit width preferably >= 15% of the main steel and ratio >= 0.15%, diameter preferably >= 6 mm and spacing <= 250 mm; under heavy concentrated loads, area increases and spacing <= 200 mm. TB 10064-2019 Clause 4.1.5: trafficable deck distribution bars >= 8 mm, sidewalks and trench covers >= 6 mm, area preferably >= 15% of main steel, distribution bars at bar bends; cantilever distribution >= 15% of transverse tension steel.

Applicable Codes

  • GB 50010-2010(2015年版)《混凝土结构设计规范》第9.1.7条
  • TB 10064-2019 · Code for Reinforcement Design of Railway Concrete Works 第4.1.5条、第4.1.10条、第4.1.12条
  • DB11/T 1832.3-2021 · Specification for Construction Technology of Building Works (Part 3: Concrete Structure Works) (Beijing) 第16.4.7条

Topic Positioning

This card explains the position and function of slab distribution reinforcement and its diameter, spacing, and area requirements under the building code (GB 50010-2010 (2015 edition) Clause 9.1.7) and the railway code (TB 10064-2019 Clause 4.1.5), plus its pairing with slab negative moments.

Core Conclusions

Position and function: distribution bars are perpendicular to the main bars and on their inner side, fixing the main bars in position, forming the mesh, distributing load, and resisting temperature-shrinkage stresses in cast slabs.

Building caliber (GB 50010-2010 (2015 edition) Clause 9.1.7):

  • "Where a slab is designed as one-way, distribution reinforcement perpendicular to the main direction shall be provided; per unit width it should be not less than 15% of the unit-width main steel, with a reinforcement ratio not less than 0.15%; bar diameter preferably not less than 6 mm, spacing not greater than 250 mm; under heavy concentrated loads, the area shall be increased and spacing not greater than 200 mm."
  • "With proven experience or reliable measures, precast one-way slab distribution steel is exempt from this clause."

Railway caliber (TB 10064-2019 Clause 4.1.5): "Distribution bars perpendicular to the main bars shall be provided in slabs, placed on the inner side of the main bars", and:

  1. Trafficable deck distribution bars >= 8 mm diameter; sidewalks and trench covers >= 6 mm;
  2. Per unit width, distribution area preferably >= 15% of main steel;
  3. Where main bars bend, distribution bars shall be provided at the bends. Related: cantilever distribution >= 15% of transverse tension steel; lower transverse bars may be at twice the upper spacing, diameter >= 10 mm (Clause 4.1.10); integral skew slabs (B/L <= 0.75) distribution >= 1/4 of tension main steel area (Clause 4.1.12).

Pairing with slab negative steel: the top slab mesh comprises the support negative-moment bars and their perpendicular distribution bars; on site, all intersections of top longitudinal/transverse and negative bars shall be fully tied (DB11/T 1832.3-2021 Clause 16.4.7).

Applicable Boundaries

  • GB 50010 Clause 9.1.7 applies to "one-way slab" design: main bars in the spanning direction, distribution bars perpendicular; two-way slabs have main steel both ways — the clause's limits do not transfer directly.
  • Precast one-way slabs with proven experience or measures are exempt.
  • Building and railway values differ (traffic decks start at 8 mm) — no cross-industry mixing; projects follow their industry code and design.

Further Reading

  • GB 50010-2010 (2015 edition) Code for Design of Concrete Structures, Clause 9.1.7; related Clauses 9.1.4 (bottom bars into supports, negative-bar extension), 9.1.6 (face reinforcement).
  • TB 10064-2019 Code for Reinforcement Design of Concrete in Railway Works, Clauses 4.1.5, 4.1.10 (cantilevers), 4.1.12 (skew slabs).
  • DB11/T 1832.3-2021 Construction Technology Specification for Building Works, Part 3: Concrete Structures, Clause 16.4.7 (slab tying).