Specified steel grades for lifting loops and load-bearing embedded parts in concrete members, stress limits and cross-section basis for checking lifting loops, and anchor plate thickness and anchor bar welding requirements (including the rule against changing grades by equal-strength substitution)
Lifting loops shall use HPB300 bars (diameter no more than 14mm) or Q235B round steel (diameter over 14mm), anchored into the concrete to a depth of no less than 30d, with stresses checked under the characteristic values of loads and each loop calculated on two cross-sections: the loop stress shall not exceed 65N/mm2 for HPB300 and 50N/mm2 for Q235B round steel, and where a member carries 4 loops only 3 are counted. Anchor plates of load-bearing embedded parts should be Q235 or Q345 steel, with thickness preferably no less than 60% of the anchor bar diameter (and, where tension or bending acts, preferably greater than b/8); anchor bars shall be HRB400 or HPB300 bars, and cold-worked bars shall not be used; straight anchor bars are T-welded to the plate, pressure submerged-arc welding being preferred for bar diameters no more than 20mm and plug-through welding for diameters over 20mm. The steel grades for both components are specified by the code and may not be changed by equal-strength substitution; a design change issued by the designer is required.
Applicable Codes
- GB 50010-2010(2015年版)《混凝土结构设计规范》第9.7.6条
- GB 50010-2010(2015年版)《混凝土结构设计规范》第9.7.1条
- GB/T 700《碳素结构钢》
- GB 55008-2021 · General Code for Concrete Structures 第2.0.11条
Scope and purpose
Two load-bearing fittings in concrete structures and members - lifting loops for precast elements and load-bearing embedded parts (anchor plate + anchor bars): their specified steel grades, stress verification methods and detailing requirements. The steel grades for both are specified directly by the code; they may not be changed on the ground of 'equal-strength substitution', and only the designer can re-issue a design change.
Key conclusions
1. Lifting loops (GB 50010-2010 (2015 edition), Clause 9.7.6)
'Lifting loops shall be made of HPB300 bars or Q235B round steel and shall comply with the following: 1. The depth of embedment of a lifting loop into the concrete shall be no less than 30d, and the loop shall be welded or tied to the reinforcement cage, where d is the diameter of the loop bar or round steel. 2. The stresses in the lifting loop under the characteristic values of loads shall be checked, and each loop may be calculated on two cross-sections. For HPB300 bars, the loop stress shall not exceed 65N/mm2; for Q235B round steel, the loop stress shall not exceed 50N/mm2. 3. Where four lifting loops are provided on one member, calculation shall be based on three loops.' The commentary gives the verification basis and the source of the reduction factors: when determining the required area of the loop bar, the design value of the bar's tensile strength is multiplied by reduction factors covering - a load factor of 1.2 on the self-weight of the member, an overload factor of 1.2 for suction effects, a strength reduction factor of 1.4 for stress concentration after bending of the bar, a dynamic factor of 1.5, and a factor of 1.4 for the effect of the sling angle on loop capacity. Hence, with the design tensile strength of HPB300 bars taken as fy = 270N/mm2, the permissible tensile stress actually adopted for the loop bar is about 65N/mm2. Loads acting on lifting loops are determined from the actual conditions, generally the self-weight of the member, the self-weight of suspended equipment and live loads; for the cross-section stress check, loads are taken at characteristic values. Grade-diameter correspondence (2015 partial revision): HPB300 bar diameters are limited to no more than 14mm, so HPB300 may be used where the loop diameter is no more than 14mm; where the loop diameter is over 14mm, Q235B round steel may be used, with material properties complying with the current national standard GB/T 700, Carbon Structural Steels. Additional durability requirement: depending on durability requirements, in severe environments the loop bar or round steel, where tied in contact with the reinforcement cage, shall be separated by insulating material or given reliable anti-rust protection.
2. Load-bearing embedded parts (GB 50010-2010 (2015 edition), Clause 9.7.1)
'Anchor plates of load-bearing embedded parts should be Q235 or Q345 steel; the plate thickness shall be determined by calculation from the loading and should be no less than 60% of the anchor bar diameter; for embedded parts subject to tension or bending the plate thickness should further be greater than b/8, where b is the spacing of the anchor bars. Anchor bars of load-bearing embedded parts shall be HRB400 or HPB300 bars; cold-worked bars shall not be used. Straight anchor bars shall be T-welded to the plate. Pressure submerged-arc welding is preferred where the anchor bar diameter is no more than 20mm; plug-through welding is preferred where the diameter is over 20mm. With manual welding, the weld leg should be no less than 6mm, and no less than 0.5d for 300MPa grade bars and 0.6d for other bars, where d is the anchor bar diameter.' Commentary points: the material selection for embedded parts and the bar-to-plate connection details are essentially unchanged, having proved effective in practice; the prohibition on low-ductility cold-worked bars as anchor bars is reiterated, with HPB300 replacing the obsolete HPB235; the plate thickness relates to the actual loading and should be determined by calculation.
3. Relation to bar substitution
GB 55008-2021, General Code for Concrete Structures, Clause 2.0.11 requires bar substitution to satisfy the load-bearing capacity, serviceability, reinforcement detailing and durability required by the design, and to be covered by a design change document. Lifting loops and embedded-part anchor bars are components whose grade and material properties (ductility, weldability, bending performance) are directly specified by the code; their grade is not something that can be swapped by 'balancing' area x strength: substituting ribbed high-strength bars for HPB300 loops would change bending performance, stress limits and weldability at once, and substituting cold-worked bars for anchor bars is expressly prohibited. Any material change at such positions requires the designer to recalculate and issue a design change document.
Applicability boundaries
- This clause addresses lifting loops and load-bearing embedded parts in concrete structures and members; non-load-bearing embedded parts (e.g. curtain-wall inserts), post-installed anchors and temporary erection lifting points do not directly follow its grade specifications and stress limits.
- The loop stress limits of 65N/mm2 (HPB300) and 50N/mm2 (Q235B) are permissible values already reduced for bending stress concentration, dynamics, suction and sling angle; they must not be re-checked directly against the material design value fy.
- 'Each loop calculated on two sections' and 'four loops calculated as three' are the cross-section and count basis for the capacity check; loops must not be counted in full at their actual number.
- For diameters over 14mm, HPB300 bars may not continue to be used (diameter limit of the 2015 partial revision); switch to Q235B round steel complying with GB/T 700.
Further reading
- GB 50010-2010 (2015 edition), Code for Design of Concrete Structures, Section 9.7 'Basic requirements for structural members' (detailing and calculation of embedded parts, lifting loops and anchor bars), Clauses 9.7.1 and 9.7.6 and their commentaries.
- GB/T 700, Carbon Structural Steels - material properties of Q235B round steel.
- GB 55008-2021, General Code for Concrete Structures, Clause 2.0.11 - the mandatory requirement that substitution be covered by a design change document.
- Related: bar anchorage lengths (the detailing intent of the 30d embedment) in GB 50010-2010 Section 8.3; end hooks for plain HPB300 bars follow Section 9.3 and the relevant clauses of the construction codes.
Keywords
- 吊环
- HPB300
- Q235B圆钢
- 吊环应力验算
- 预埋件锚筋
- 锚板厚度
- 冷加工钢筋
- GB 50010-2010 9.7.6