Bend angle and straight length of stirrup and tie-bar end hooks (general members >=90 deg/>=5d; seismic members >=135 deg/>=10d; GB 50666-2011 cl. 5.3.6 and GB 50204-2015 cl. 5.3.3)
Stirrup hooks are controlled on two lines by member class: general structural members — bend angle not less than 90 degrees and post-bend straight length not less than 5 times the stirrup diameter; members with seismic requirements or special design requirements — bend angle not less than 135 degrees and straight length not less than 10 times the stirrup diameter (GB 50666-2011 cl. 5.3.6 adds "and the larger of 75mm", i.e. seismic governed by max(10d, 75mm); small diameters such as phi6 governed by 75mm). The acceptance side, GB 50204-2015 cl. 5.3.3, matches (without the 75mm): at least 3 pieces inspected per shift per rebar type processed on the same equipment, by steel rule.
Applicable Codes
- GB 50666-2011 · Code for Construction of Concrete Structures 第 5.3.6 条
- GB 50204-2015 · Code for Acceptance of Constructional Quality of Concrete Structures 第 5.3.3 条
Topic Positioning
Detailing requirements for the bend angle and post-bend straight length of stirrup and tie-bar end hooks: two control lines distinguishing "general structural members" from "members with seismic requirements or special design requirements", covering both the construction code GB 50666-2011 and the acceptance code GB 50204-2015 calibers.
Core Conclusions
GB 50666-2011 cl. 5.3.6 (primary workmanship basis, for all stirrups and ties except welded closed stirrups):
- For general structural members, the stirrup hook bend angle shall not be less than 90 degrees and the post-bend straight length not less than 5 times the stirrup diameter; for members with seismic requirements or special design requirements, the bend angle shall not be less than 135 degrees and the post-bend straight length not less than the larger of 10 times the stirrup diameter and 75mm — i.e. seismic members governed by max(10d, 75mm): stirrups under 7.5mm diameter (e.g. phi6) by 75mm, common phi8/phi10 by 10d;
- The lap length of circular stirrups shall not be less than their tensile anchorage length, and both ends shall have hooks of not less than 135 degrees, with post-bend straight length not less than 5 times the stirrup diameter for general members and not less than the larger of 10 times the diameter and 75mm for seismic members;
- Where ties serve as single-leg stirrups in compound beam/column stirrups or as ties between beam web bars, both end hooks shall be bent not less than 135 degrees with post-bend straight lengths per item 1 for stirrups; where ties serve as ties in shear walls, slabs etc., the two end hooks may be 135 degrees at one end and 90 degrees at the other, with post-bend straight length not less than 5 times the tie diameter.
GB 50204-2015 cl. 5.3.3 (acceptance side): General structural members: stirrup hook bend angle not less than 90 degrees, straight length not less than 5 times the stirrup diameter; members with seismic requirements or special design requirements: angle not less than 135 degrees, straight length not less than 10 times the stirrup diameter. Inspection quantity: at least 3 pieces per shift per rebar type processed on the same equipment; method: steel rule. Note the acceptance clause omits the 75mm floor, but fabrication should follow the construction code GB 50666-2011 larger-of 10d and 75mm — stricter and safer.
Term definitions (commentary, original): "members with seismic requirements" means members with a seismic grade specified in the design drawings and relevant standards; "special design requirements" refers to torsion and combined bending-torsion states, and columns with a total longitudinal reinforcement ratio over 3%. Ties with two 135-degree hooks may be fabricated with one end 135 degrees and the other 90 degrees, the latter bent to 135 degrees after site installation. The inner bend diameter of stirrup hooks is separately governed by GB 50666-2011 cl. 5.3.4 — a distinct control item from angle/straight length, both to be satisfied in fabrication.
Applicable Boundaries
Applies to fabrication and acceptance of end hooks of stirrups (including circular stirrups) and ties (single-leg stirrups in compound beam/column stirrups, ties between beam web bars, ties of shear-wall and slab mesh) in concrete construction. Not applicable to welded closed stirrups (expressly excluded in the GB 50666-2011 cl. 5.3.6 commentary). The two codes match with slight wording differences: GB 50204-2015 omits the 75mm floor; fabrication follows GB 50666-2011 max(10d, 75mm). Design-side extension: GB 50010-2010 (incl. 2015 edition) cl. 11.1.8 — for seismic members with non-welded closed stirrups, ends shall have 135-degree hooks with straight lengths not less than 10 times the stirrup diameter (this clause is outside the present desktop evidence chunk; verify the original text when citing).
Further Reading
- GB 50666-2011 cl. 5.3.6 (stirrup/tie end hook detailing, the core clause) and cl. 5.3.4 (inner bend diameter); the cl. 5.3.6 commentary defines "seismic requirements", "special design requirements" and tie fabrication methods.
- GB 50204-2015 cl. 5.3.3 (acceptance quantity and method: at least 3 pieces per shift per type per machine; steel rule).
- Design-side extension: GB 50010-2010 (incl. 2015 edition) cl. 11.1.8 hook requirements for non-welded closed stirrups of seismic members.
Keywords
- 箍筋弯钩
- 拉筋弯钩
- 弯折角度
- 平直段长度
- 135度弯钩
- 抗震构造
- GB 50666-2011
- GB 50204-2015