Stirrup densification zones of frame columns: extent, leg spacing and volumetric stirrup ratio requirements; the stirrup characteristic value and volumetric ratio floors of frame joint cores; and the counting basis for stirrup numbers by segment in densification zones (GB 50011-2010 (2016 edition), Clauses 6.3.9 and 6.3.10)
The densification length at column ends is the largest of the section depth (column diameter for round columns), one sixth of the clear column height, and 500mm; at the base of a ground-floor column it is no less than one third of the clear height; 500mm above and below rigid ground; and the full height for columns with shear span ratio no more than 2, columns whose clear-height-to-section-depth ratio is no more than 4 owing to infill walls, transfer columns, and corner columns of grade-1 and grade-2 frames. The volumetric stirrup ratio of the densification zone is no less than 0.8% for grade 1, 0.6% for grade 2 and 0.4% for grades 3 and 4; in the non-densified zone it should preferably be no less than 50% of the densified zone, with stirrup spacing no more than 10d for grades 1 and 2 and 15d for grades 3 and 4. For frame joint cores of grades 1, 2 and 3, the stirrup characteristic values should preferably be no less than 0.12, 0.10 and 0.08, and the volumetric stirrup ratios no less than 0.6%, 0.5% and 0.4%; core-zone stirrups are counted as a separate segment, joint height divided by spacing, into the column stirrup quantity.
Applicable Codes
- GB 50011-2010(2016年版)建筑抗震设计规范 第6.3.7、6.3.9、6.3.10条
- GB 50010-2010(2015年版)混凝土结构设计规范 Ch. 11
- DB11/T 1832.3-2021 建筑工程施工工艺规程 第3部分:混凝土结构工程 第16.4.6条
Topic scope
The quantified detailing rules for stirrups at frame column ends and in beam-column joint cores: how long the densification zone is, how dense the stirrups must be (leg spacing, volumetric stirrup ratio, stirrup characteristic value), the floor limits for non-densified zones, and how the numbers of densification-zone and core-zone stirrups are counted segment by segment into the column stirrup quantity.
Core conclusions
1. Densification extent of column stirrups (GB 50011-2010 (2016 edition) Clause 6.3.9 item 1)
- at column ends, the largest of the section depth (column diameter for round columns), one sixth of the clear column height, and 500mm;
- at the base of a ground-floor column, no less than one third of the clear column height;
- 500mm above and below rigid ground;
- the full height for columns with shear span ratio no more than 2, columns whose clear-height-to-section-depth ratio is no more than 4 because of infill walls and the like, transfer columns, and corner columns of grade-1 and grade-2 frames.
2. Leg spacing (Clause 6.3.9 item 2) Stirrup leg spacing in the densification zone: preferably no more than 200mm for grade 1, no more than 250mm for grades 2 and 3, and no more than 300mm for grade 4. At least every other longitudinal bar should be restrained by stirrups or crossties in two directions; where crosstie composite stirrups are used, the crossties should bear against the longitudinal bars and hook the stirrups.
3. Volumetric stirrup ratio (Clause 6.3.9 item 3) The volumetric stirrup ratio of column densification zones shall be no less than 0.8% for grade 1, 0.6% for grade 2 and 0.4% for grades 3 and 4; when computing the ratio of composite spiral stirrups, the volume of their non-spiral stirrups is multiplied by the reduction factor 0.80. fc is the design value of the axial compressive strength of concrete, taken as C35 where the strength class is below C35; fyv is the design tensile strength of stirrups or crossties; lambda_v is the minimum stirrup characteristic value taken from Table 6.3.9 of that clause (separate values for ordinary stirrups, composite stirrups, composite spiral stirrups and continuous composite rectangular spiral stirrups).
- Transfer columns should use composite spiral stirrups or well-type composite stirrups, whose minimum stirrup characteristic value is increased by 0.02 over the Table 6.3.9 values and whose volumetric stirrup ratio shall be no less than 1.5%.
- Columns with shear span ratio no more than 2 should use composite spiral stirrups or well-type composite stirrups, with a volumetric stirrup ratio no less than 1.2%, and no less than 1.5% for grade 1 at intensity 9.
4. Non-densified zone (Clause 6.3.9 item 4) The volumetric stirrup ratio of the non-densified zone should preferably be no less than 50% of the densified zone; stirrup spacing should be no more than 10 times the longitudinal bar diameter for grade-1 and grade-2 columns and no more than 15 diameters for grade-3 and grade-4 columns.
5. Frame joint core (Clause 6.3.10) The maximum spacing and minimum diameter of core-zone stirrups follow Clause 6.3.7; for grade-1, 2 and 3 frames the stirrup characteristic values of joint cores should preferably be no less than 0.12, 0.10 and 0.08, and the volumetric stirrup ratios no less than 0.6%, 0.5% and 0.4%. Where the column shear span ratio is no more than 2, the volumetric stirrup ratio of the joint core should preferably be no less than the larger of the ratios at the column ends above and below the core. The code explains the purpose as giving the frame beam and column longitudinal bars reliable anchorage and keeping the core concrete well confined, the role of core stirrups differing from that of stirrups at column ends.
6. Measurement and construction practice (against omission and duplication)
- Measurement: densification-zone stirrups and joint-core stirrups both go into the column stirrup quantity, with no separate 'joint stirrup' item. The numbers are totalled segment by segment: column-end densification zones by max(section depth, clear column height/6, 500mm), the base of ground-floor columns by one third of the clear height, 500mm above and below rigid ground, each taken as zone height divided by stirrup spacing (non-integral spacings rounded up, summed by segment), and the core zone as a further segment by joint height divided by spacing.
- Construction: the first stirrup at the beam end should be placed no more than 50mm from the joint edge; where the design is silent on the beam-end densification length, grade 1 takes the larger of 2 times the beam depth and 500mm and grades 2 to 4 the larger of 1.5 times the beam depth and 500mm; where secondary beams pass through main beams, the main beam is densified on both sides, with the stirrups at the ends of the secondary beam no more than 50mm from the face of the main beam (DB11/T 1832.3-2021 Clause 16.4.6 item 7).
Applicable boundaries
- This applies to cast-in-place reinforced concrete frame columns and beam-column joints under seismic design; non-seismic structures, shear-wall boundary elements, and core columns and constructional columns of masonry structures are not governed by these clauses and follow the relevant chapters (e.g. GB 50010-2010 Chapters 9 and 11).
- fc and fyv in the ratio formula must be the actual design strengths (fc taken as C35 below C35), and lambda_v must be read from the table - the percentage floors given here are only the 'minimum volumetric stirrup ratios'; at high axial force ratios the governing value is lambda_v.fc/fyv and may lie above the floor.
- Bar cutting lengths and hook add-on values are not covered here; compute them separately by the closed rectangular stirrup cutting formula.
- Local standards (e.g. Beijing DB11/T 2382-2024, DB11/T 1832.3-2021) may be finer on construction and measurement; apply the current standards of the project location, without conflicting with the national code requirements.
Further reading
GB 50011-2010 (2016 edition) Clause 6.3.9 (incl. Table 6.3.9, minimum stirrup characteristic values of column densification zones), Clause 6.3.10, Clause 6.3.7 (maximum spacing and minimum diameter of core-zone stirrups); GB 50010-2010 (2015 edition) Chapter 11 (seismic detailing, column longitudinal bars and stirrups), Chapter 9 (non-seismic detailing); DB11/T 1832.3-2021 Clause 16.4.6 (beam bar fixing, beam-end densification zones and densification at main-secondary beam junctions).