Formwork quantities for cast-in-place pool/ditch side walls: both inner and outer faces counted by contact area, with the exception of a side not actually formed
Formwork quantities are uniformly measured in m2 by the "contact area between concrete and formwork" (termed formwork erection area in hydraulic works): for pool side walls, inner forms are placed on the inner face and outer forms on the outer face — both faces contact concrete -> both are counted (approximately 2 x wall length x wall height); for ditches, both contact faces of the ditch walls are counted, plus the ditch bottom. A face not actually formed (concrete cast in the original trench, earth wall used as the outer form, cast against an existing structure, brick formwork as the outer form) is not counted because it has no formwork-concrete contact; reserved holes with a single opening <= 0.3 m2 are not deducted; settlement is measured by the effective formwork erection area actually used and turned over.
Applicable Codes
- GB 50501-2007 水利工程工程量清单计价规范 App. A.10.2
- GB 50860-2013 构筑物工程工程量计算规范 Table C.2
- SJG 181.5-2024 市政工程消耗量标准 Vol. 5 水处理工程
Topic Positioning
The measurement basis for formwork quantities of walls of cast-in-place pools, ditches and similar structures: whether both the inner and outer faces of the side wall are counted, and the exception where one side is not actually formed.
Core Conclusions
Formwork quantities are uniformly measured in square metres by the "contact area between concrete and formwork" (termed formwork erection area in hydraulic codes) — whichever face is actually formed and contacts concrete is counted:
- Pool side walls: inner forms on the inner face, outer forms on the outer face — both faces contact concrete -> both are counted, wall formwork area approx. 2 x (wall length x wall height), computed precisely per contact face; ditch walls count both contact faces plus the ditch bottom formwork.
- Exception (only one side or none): a face not actually formed — cast in the original trench, earth wall used as the outer form (earth form), cast directly against an existing structure/rock face, brick formwork as the outer form, etc. — has no formwork-concrete contact and is not counted.
- Holes: reserved holes with a single opening <= 0.3 m2 are not deducted from the formwork area (some codes also do not add formwork for the hole sides); for openings > 0.3 m2, deduct the hole area and include the hole sides, with details per the local quota.
- Settlement: measured by the effective formwork erection area actually completed and turned over; the costs of fabricating, assembling, transporting, erecting/removing and the operating losses of panels and supports are apportioned into the unit rate for the effective quantity.
Applicable Boundaries
Applies to the "contact area" measurement systems of hydraulic works (GB 50501-2007, Appendix A.10.2), structures works (GB 50860-2013, Table C.2, code 070302) and local municipal water-treatment works (e.g., SJG 181.5-2024, Volume 5). Where the local quota contains special rules for pool-wall formwork (e.g., deducting overlaps with interior columns/partitions inside the pool), the local quota notes govern; formwork area not in contact with concrete is never measured.
Further Reading
See GB 50501-2007 "Code for valuation of water conservancy works by bill of quantities", Appendix A.10.2, formwork calculation rules; GB 50860-2013 "Code for calculation of quantities of structure works", Table C.2 (code 070302); SJG 181.5-2024 "Consumption standards for municipal works, Volume 5, water treatment works", Section 3.2.1, preliminary items.
Keywords
- 模板工程量
- 接触面积
- 立模面积
- 水池侧壁
- 水沟
- 构筑物模板
- 内外两侧模板
- 有效立模面积