Classification of reinforcement in slab-type members: negative moment bars, distribution bars, temperature bars and opening trimming bars are design reinforcement to be counted into quantities, while chair bars (iron horses, support bars), ladder bars, positioning bars, shims, diagonal brace bars and anti-buoyancy bars are construction-aid bars not measured separately; including the two-branch test for chair bars 'detailed on the drawings / not detailed', the constructional practice, the mass calculation formula and the evidentiary requirements for certification at final account
The governing logic: bars shown on the design drawings (including bars fixing positions as required by the codes) -> counted into the rebar quantities; purely constructional aids -> not counted, their cost absorbed by the work content or consumption of the rebar items. Slab negative moment bars (top bars), distribution bars, temperature bars, drawn trimming bars at openings and anchorage bars are design reinforcement, counted at centreline length x theoretical mass (bends follow the centreline into the count; laps marked by design or the codes are counted; anchorage lengths into supports are merged in); chair-type support bars: where the design drawings (or atlas nodes) detail them, they are merged in tonnes as drawn into the slab rebar quantities; where the drawings are silent, they are non-design construction-aid bars and no BOQ quantity is calculated (GB/T 50854-2024 Appendix E item 12, GB/T 50857-2024 Appendix J.2.1, GB/T 50860-2024 Appendix A.15.8); where an approved project execution plan exists and the contract agrees measurement by the plan, they are merged in tonnes per the plan (SJG 181.2-2024 clause 5.2.2).
Applicable Codes
- GB/T 50854-2024 房屋建筑与装饰工程工程量计算标准 App. E
- GB/T 50857-2024 市政工程工程量计算标准 App. J.2.1
- GB/T 50860-2024 构筑物工程工程量计算标准 App. A.15.6、A.15.8
- GB/T 50861-2024 城市轨道交通工程工程量计算标准 App. B.9.3
- GB 50010-2010(2015年版)混凝土结构设计规范 第9.1.7条
- TB 10064-2019 铁路工程混凝土配筋设计规范 第4.1.3~4.1.5条
- TB/T 10823-2024 铁路工程预算定额 Vol. 2桥涵工程 册说明十二
- SJG 181.2-2024 市政工程消耗量标准 Vol. 2桥涵工程 第5.2.2条
- DB11/T 2382-2024 建设工程施工消耗量标准 第4.6.5条、第7.1.32条
- DB11/T 1832.3-2021 建筑工程施工工艺规程 第3部分 第15.4.7、16.4.7条
- DB22 JT 143-2015 住宅工程质量常见问题防控技术规程 第5.2.1条
- DB11/T 638-2016 房屋修缮工程工程量计算规范 App. A
Topic positioning
This card answers the classification for in-situ slabs (base slabs, floor slabs, cantilever slabs): which bars are 'design-drawn reinforcement' that must be counted into the rebar quantities, and which are 'construction-aid bars' not measured separately; plus the two-branch treatment of chair bars (iron horses, support bars), their usual sizes and layout construction, the formula for converting to mass by the piece, and the evidentiary requirements for construction-aid quantities at the final account stage.
Core conclusion
1. The governing logic (one line drawn clean) Bars shown on the design drawings (including bars fixing positions as required by the codes) -> counted into the rebar quantities; purely constructional aids -> not counted, their cost comprehensively absorbed by the work content and consumption of each rebar item. GB/T 50854-2024 Appendix E, notes on rebar, bolts and steel items, item 1 states it plainly: 'the work content of each rebar item shall include the corresponding construction-aid bars' - construction-aid bars are not 'unpaid work', they are spread into the all-in unit rate of the rebar, so they must not be measured separately again (that would be double counting).
2. Slab negative moment bars (top bars, support upper bars): counted, with three length elements
- The length basis is centreline length. GB/T 50860-2024 Appendix A clause A.15.6: 'the design-drawn rebar length in the calculation rules means the centreline length of the bar.' The 90-degree downturn of a negative bar is part of the section shape and follows the centreline into the count - no separate item, no deduction.
- The anchorage length into the support is merged in. GB/T 50854-2024 Appendix E item 10: 'anchorage bars protruding from each cast-in-place member shall have their length determined as required by design and be merged into the rebar quantity of that member.' GB/T 50857-2024 Appendix J.2.1: 'anchorage bars protruding from cast-in-place members, lifting hooks of precast members and support bars fixing positions shall be merged into the rebar quantities. Apart from laps expressly shown by design, other laps are not counted into the quantities.'
- Laps fall into two classes. GB/T 50854-2024 Appendix E item 11: 'apart from laps marked by design (including code requirements), other construction laps (such as stock-length laps) are not counted into the quantities of rebar items.' Not counted (absorbed by quota consumption): 'the mass of non-prestressed rebar is the design length of the bars (which shall include spacer bars and positioning bars) multiplied by the theoretical unit mass. Welding consumables, binding wire, couplers, spacer blocks and the like shall not be counted into the work quantities.' (TB/T 10823-2024 volume 2 bridges and culverts works, volume notes 12.3; TB/T 10825-2024 volume 4 track works, volume notes 23.3, same basis).
3. Distribution bars: design constructional reinforcement, not construction-aid bars - counted Distribution bars are constructional in nature, but they are code-mandated and marked on the drawings, belong with the slab rebar items like the negative bars, and are counted at the drawn size, spacing and length. GB 50010-2010 (2015 edition) clause 9.1.7: 'Where a slab is designed as one-way, distribution bars shall be placed in the direction perpendicular to the main direction; per unit width the distribution reinforcement should be no less than 15% of the main bars per unit width, and the reinforcement ratio preferably no less than 0.15%; the diameter of distribution bars should preferably be no less than 6mm and the spacing no more than 250mm; under heavy concentrated loads the area of distribution bars shall be increased and the spacing preferably no more than 200mm.' The railway basis agrees, TB 10064-2019 clause 4.1.5: 'distribution bars perpendicular to the main bars shall be set in slabs, placed on the inner side of the main bars' - distribution bars of carriageway slabs no less than 8mm in diameter, footway slabs and trench cover slabs no less than 6mm; the area of distribution bars per unit width preferably no less than 15% of the area of the main bars; distribution bars shall be provided at the bends of the main bars.
4. Temperature bars and opening trimming bars: classified by 'drawn or not drawn' Slab temperature bars and opening trimming bars that carry size, spacing and extent on the construction drawings are design-drawn reinforcement, counted with their slab or wall rebar items at centreline length, without opening a 'construction-aid' heading; trimming bars at openings not marked on the drawings, added purely as site strengthening, are construction-aid bars and not measured separately. Whether the concrete volume at the opening is deducted (single openings of no more than 0.30m2 not deducted) and rebar measurement are two separate rules - do not mix them.
5. Chair bars (iron horses, support bars) decision table - two branches
| Branch | Trigger | Character | Measurement home | Rule source |
|---|---|---|---|---|
| A Detailed on the design | The construction drawings give the chair size, spacing and layout, or note 'see node xx of atlas xx', i.e. 'position-fixing support bars required by design' | Design-drawn reinforcement | Merged in tonnes as drawn into the rebar quantities of the corresponding slab or base slab | GB/T 50857-2024 Appendix J.2.1 'position-fixing support bars ... shall be merged into the rebar quantities'; GB/T 50861-2024 Appendix B.9.3 elevated bridge works, same basis; DB11/T 638-2016 Appendix A, notes item 3: 'position-fixing support bars in cast-in-place concrete members, iron horses for double-layer reinforcement, anchorage bars protruding from members, lifting hooks of precast members and the like shall be merged into the rebar quantities'; Hunan 2025 municipal consumption standard: lifting hooks of precast members, support bars fixing the positions of rebar or pipes, iron horses for double-layer reinforcement and anchorage bars are all calculated as non-prestressed rebar and merged into the rebar quantities |
| B Not detailed on the design | The drawings do not require them; they are set only per the construction scheme | Construction-aid bars (not required by design) | No BOQ quantity calculated; the cost sits inside the work content of the rebar items | GB/T 50854-2024 Appendix E item 12: 'the quantities of non-design chair bars, diagonal brace bars, anti-buoyancy bars, shims and other construction-aid bars shall not be calculated for any rebar item'; GB/T 50857-2024 Appendix J.2.1, GB/T 50860-2024 Appendix A.15.8 ('BOQ quantity shall not be calculated'), GB/T 50861-2024 Appendix B.9.3 ('non-design chair bars, diagonal brace bars, anti-buoyancy bars, shims and other construction-aid bars are not counted into BOQ quantity'), same basis |
| B' Measured by plan branch | An approved project execution plan or rebar detailing plan exists, and the contract agrees measurement by the plan | Measured per the plan | Merged into the rebar quantities in tonnes | SJG 181.2-2024 clause 5.2.2: 'position-fixing support bars (iron horses, chair bars, shims and the like), anchorage bars protruding from members and hanger bars shall have their quantities calculated in tonnes per the requirements of the design, the codes or the approved construction scheme and merged into the rebar quantities' |
| Also classed with the 'construction-aid bars': ladder bars, positioning bars, shims, diagonal brace bars and anti-buoyancy bars - the principle is the same: not required by design, not measured; post-embedded bars not required by design are likewise not listed separately (GB/T 50854-2024 Appendix E item 13: 'post-embedded bars not required by design are not listed and measured separately. Where design requires them, they shall be coded and listed under the rebar items of the corresponding members, with the embedment requirement added to the description.'). | ||||
| Local consumption standards have a further 'comprehensive allowance' basis: DB11/T 2382-2024 clause 4.6.5 item 1: 'the construction consumption of rebar fabrication, mesh fabrication and fixing, and diaphragm wall rebar fabrication and fixing shall, according to building function, design grade and similar factors, be measured to include construction-aid bars such as chairs, supports and positioning bars; where the data are insufficient, wastage plus construction-aid bars may preferably be taken as 5% of total rebar'; municipal clause 7.1.32 same item (pile cage rebar excepted, preferably 5%). Under this basis the budget lists no separate chair bars - doing so is duplication. |
6. Usual construction and mass formula of chair bars
- Diameter selection (reference where no plan exists): slab thickness no more than 140mm and main and distribution bar diameters no more than 10mm -> d8; thickness above 140mm and below 200mm, main bars up to d12 -> d10; thickness above 200mm -> d12 (DB22 JT 143-2015 clause 5.2.1); cantilever slabs: chair bar diameter no less than 14mm, spacing no more than 1000mm, with spacer blocks under the feet (DB11/T 1832.3-2021 clause 16.4.7 item 6).
- Layout: the upper-layer slab bars shall first receive layer chairs between mats, placed at spacing no more than 1000mm (DB11/T 1832.3-2021 clause 16.4.7 item 5); chairs shall be set between the upper and lower mats of base slabs, placed after the lower mat is tied, position and spacing determined by the construction scheme, designed for multiple layers where the bars are laid in multiple layers, resting on the lower mat, placed perpendicular to the bottom bars of the upper mat and stable (same standard clause 15.4.7); metro station base slabs are usually laid quincunx at 1m spacing, never resting directly on the blinding but placed on the upper bars of the lower mat (ZJQ08-SGJB 022-2018 clause 8.4.3).
- Height: h is roughly slab thickness - top cover - bottom cover - upper bar diameter - lower bar diameter; where the design sets no slab cover requirement, take 15mm (DB11/T 1832.3-2021 clause 16.4.7 item 4).
- Mass formula: single-piece mass = piece length x theoretical unit mass (0.00617d2 kg/m); mass per square metre = pieces per square metre x piece length x theoretical unit mass; total in t = sum / 1000. Piece length is commonly taken as 2 x slab thickness + 0.2m (two support legs plus the top crossbar); example: 120mm slab, 1 piece/m2, d8 - piece length 0.44m, unit mass 0.395kg/m, 0.174kg per piece, 5000m2 totals 0.869t. Theoretical masses of d8/d10/d12 are 0.395/0.617/0.888 kg/m.
7. Evidentiary requirements for construction-aid quantities to enter the final account
- Plan approval: measurement of non-design construction-aid bars must rest on an approved project execution plan (or rebar detailing plan), plus a contract agreeing measurement by the plan (SJG 181.2-2024 clause 5.2.2); without an approved plan and a contractual agreement, 'no BOQ quantity' still governs.
- Site confirmation: chairs and support bars are concealed content; once rebar tying and the fixing of embedded parts and opening trimming bars are complete, concealed works acceptance shall be carried out promptly (DB11/T 1832.3-2021 clause 16.4.7 item 8); the acceptance record plus the approved plan form the complete chain for final account measurement - a plan without acceptance records, or site records without an approved plan, both invite disallowance on review.
Applicable boundaries
- The BOQ measurement basis is GB/T 50854-2024 (building works), GB/T 50857-2024 (municipal works), GB/T 50860-2024 (structures) and GB/T 50861-2024 (urban rail transit); during the transition with the 2013 editions, first confirm the edition agreed in the contract.
- Local consumption standards differ widely: the 5% comprehensive basis of DB11/T 2382-2024 applies only to the corresponding Beijing quotas; other regions follow their local volume notes; railways follow the volume notes of TB/T 10823-2024 and TB/T 10825-2024, not the building basis.
- Negative-bar downturn lengths (commonly slab thickness - 2 x cover) and lap lengths between distribution and negative bars are atlas node content; specific values follow the construction-drawing markings or the atlas edition agreed in the contract.
- Classification of temperature bars and opening trimming bars turns on whether the drawings mark them; unmarked bars cannot be claimed into quantities on the strength of 'customary practice'.
- The formulas in section 6 are estimation and checking bases for use where no plan exists; formal measurement prefers design markings or the approved plan.
Further reading
- GB/T 50854-2024 Appendix E 'concrete and reinforced concrete works', notes on rebar, bolts and steel items, items 1, 2, 4, 8, 10, 11, 12, 13 (listing rules for cages, secondary-structure rebar, bolts, anchorage, laps, construction-aid bars, post-embedded bars)
- GB/T 50857-2024 Appendix J.2.1 rebar works; GB/T 50860-2024 Appendix A.15.6, A.15.8; GB/T 50861-2024 Appendix B.9.3 elevated bridge works
- GB 50010-2010 (2015 edition) clause 9.1.7 (distribution reinforcement ratio, diameter, spacing of one-way slabs); TB 10064-2019 clauses 4.1.3 to 4.1.5 (main and distribution bars of slabs)
- TB/T 10823-2024 volume 2 bridges and culverts works, volume notes 12; TB/T 10825-2024 volume 4 track works, volume notes 23; SJG 181.2-2024 clause 5.2.2; SJG 111.2-2022 clause 3.2.3; DB11/T 2382-2024 clause 4.6.5, clauses 7.1.32 and 7.1.33
- Constructional practice: DB11/T 1832.3-2021 clauses 15.4.7 and 16.4.7; DB22 JT 143-2015 clause 5.2.1; ZJQ08-SGJB 022-2018 clause 8.4.3
Keywords
- 板负筋
- 分布筋
- 温度筋
- 马凳筋
- 措施钢筋
- rebar quantities
- GB/T 50854-2024
- 支撑钢筋